Loading...
HomeMy WebLinkAboutNCC223691_MODIFICATION Supporting Doc (CLOSEOUT LOTS 60-63)_20230927 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building,225 Green Street, Suite 714,Fayetteville,NC 28301-5094 (910)433-3300 County: Harnett Project: Coble Farms-Lots 60,61,62,63 River basin: Cape Fear Person financially responsible:NVR,Inc.-Joe Schmidtke,VP Project#: HARNE-2023-102 COC: NCC223691 Address: 5734 Trinity Road,Suite 200,Raleigh,NC 27607 1. Project Location: SR 1415,Angier Pictures: No 2. Weather and soil conditions: mostly sunny,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: September 20,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.The Certificate of Coverage under the NPDES General Stormwater Permit for Construction Activities(NCG010000) associated with this project was modified to cover additional E&SC plan approvals for other lots within the development under the same responsible party.Therefore,a Notice of Termination cannot be submitted until all E&SC plan approvals associated with the Certificate of Coverage have been closed out.The Certificate of Coverage may be modified to remove the lots covered under this plan via a Modification Form available at:https://edocs.deq.nc.gov/Forms/NCG01-Modification.Please note that this correspondence must be uploaded as part of completing the Modification process. Reported by: Lori Britt CAL I Others present: Date of inspection: September 18,2023 Time arriving on site: 2:30 PM Time leaving site: 2:40 PM CC: