HomeMy WebLinkAbout20231340 Ver 1_ePCN Application_20230926DWR
Division of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Pre -Filing Meeting Date Request was submitted on:
8/8/2023
BIMS # Assigned
20231340
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Select Project Reviewer*
Robert Tankard:robert.tankard
Information for Initial Review
1a. Name of project:
Sanitary Sewer Pump Station Rehabilitation 2020
1a. Who is the Primary Contact?*
M. Blaine Humphrey, P.E.
1b. Primary Contact Email: *
bhumphrey@riversandassociates.com
Date Submitted
9/26/2023
Nearest Body of Water
Fork Swamp
Basin
Neuse
Water Classification
C;Sw,NSW
Site Coordinates
Latitude:
35.524265
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Pitt
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
Longitude:
-77.379580
Version#*
1
Reviewing Office*
Washington Regional Office - (252) 946-6481
1c. Primary Contact Phone:*
(252)752-4135
Q
u
Ia. Type(s)of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permits) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
33 - Temporary Construction
58 - Utility Line Activities for Water and Other Substances (frequently used)
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Nani on recorded deed:
Town of Winterville
2b. Deed book and page no.:
401 Water Quality Certification - Express
Riparian Buffer Authorization
2c. Contact Person:
Terri Parker
2d. Address
Street Address
2571 Railroad Street
Address Line 2
City
Stale / Province / Region
Winterville
INC
Postal / Zip Code
Country
28590
USA
Yes No
Yes No
2e. Telephone Number:
(252)756-2221
2g. Email Address:'
terri.parker@wintervillenc.com
4. Agent/Consultant (if applicable)
4a. Name:
M. Blaine Humphrey, P.E.
4b. Business Name:
Rivers & Associates
4c.Address
Street Address
107 East 2nd Street
Address Line 2
City
Greenville
Postal / Zip Code
27858
4d. Telephone Number:
(252)341-2899
4f. Email Address:
bhumphrey@riversandassociates.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Winterville
2. Project Identification
2a. Property Identification Number:
4684187790
2c. Project Address
Street Address
Address Line 2
city
Winterville
Postal / Zip Code
28590
3. Surface Waters
3a. Name of the nearest body of water to proposed project:"
Fork Swamp
3b. Water Resources Classification of nearest receiving water:"
C;Sw,NSW
3c. What river basin(s) is your project located in?"
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
0302020204
4. Project Description and History
2f. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2b. Property size:
State / Province / Region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The proposed construction improvements are located within the Neuse Buffer Zone which is located within a 105' Maintained Pitt County Drainage District (Fork Swamp Lateral #26
Easement 30' west and 75' east of centerline of Canal). The majority of the proposed construction improvements will be located within an existing 30' Town of Winterville Utility Easement
(D.B. 2039 PG. 438 & M.B. 64 PG. 160). The proposed gravity line for replacing the Winterville Crossing PS will be installed within the previously disturbed existing utilities near a R4SBC
blueline stream.
a
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? *
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
425
4h. Explain the purpose of the proposed project:*
The Winterville Crossing PS is approximately twenty-one (21) years old and the existing electrical panels and pump removal piping are showing signs of corrosion. The Town of Winterville
intends to abandon the existing PS and install 900 LF of gravity sewer line from the manhole upstream of the existing PS wet well to a proposed downstream manhole installed as a part of
an alternate project. Improvements include installation of approximately 200 LF of 10-inch gravity sewer line, and 700 LF 15-inch gravity sewer line, and installation of five (5) new
manholes, and tie-ins to two (2) existing manholes.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The proposed gravity sewer line and water main at the Winterville Crossing PS will be installed below grade in an existing previously disturbed utility easement. A jack & bore method will
be used for road crossing. Any disturbed areas will be returned to preconstruction conditions. Impact to any wetland/stream areas during construction will be temporary and where
necessary it will be done in accordance with the appropriate U.S. Army Corps of Engineers Nationwide Permit and NCDEQ authorizations. Sedimentation and erosion control measures
will be in place during ground disturbing activities. These measures will prevent negative impacts to wetland and streams during construction. Equipment expected to be used will be large
sized excavators, dewatering pumps, generators, and transport trucks. Once the project is complete, temporary impacts will be allowed to grow back to a natural state. Permanent
easement areas will be maintained as a maintenance corridor.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
NCDOT Encroachment Agreement
Sewer Extension Fast Track
Soil Erosion and Sediment Control
Public Water Supply
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
3. Stream Impacts
❑
gf
3a. Reason for impact (?)
Installation of sewer main and
water main
3b.lmpact type"
Temporary
3c. Type of impact*
Excavation
3d. S. name* ��3e.
Unnamed Tributary to Fork
Swamp
Stream Type*
(?) lJurisdiction*
Perennial
C Type of
DWR
3g. S. width
25
Averege (feet)
3h. Impact
length*
40
(linear feet)
gy
Installation of sewer main
Temporary
Excavation
Unnamed Tributary to Fork
Swamp
Perennial �_]DWR
h;;J�:]_
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
0
3i. Total stream and ditch impacts:
60
3j. Comments:
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
Neuse
Catawba
Goose Creek
Other
3i. Total temporary stream impacts:
60
Tar -Pamlico
Randleman
Jordan Lake
6b. Impact Type
6c. Per or Temp
6d. Stream name
6e. Buffer mitigation required?
6f. Zone 1 impact
6g. Zone 2 impact
Perpendicular Construction
P
Unnamed Tributary to Fork Swamp
No
1,620
0
Perpendicular Construction
P
Unnamed Tributary to Fork Swamp
No
0
840
Parallel Construction
P
Unnamed Tributary to Fork Swamp
Yes
3,690
0
Parallel Construction
P
Unnamed Tributary to Fork Swamp
No
0
3,630
Parallel Construction
P
Unnamed Tributary to Fork Swamp
No
0
510
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 0.00 0.00
Zone 1 Zone 2
Total Permanent impacts: 5,310.00 4,980.00
Zone 1 Zone 2
Total combined buffer impacts: 5,310.00 4,980.00
6i. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
This project requires paralleling the existing sewer line with a replacement sewer line and a perpendicular crossing in order to connect to existing sewer
infrastructure. Paralleling the outfall on the eastern side of the canal was not possible due to existing sewer infrastructure.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The Owner will minimize the impact to the buffer area by requiring the contractor to temporarily stockpile material over the existing sewer line and out of
Zone 1.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
DWR Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR
Q
6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information.
Yes No
6b. If yes, then identify the square feet of impact.
6c. Reason for impact
6d. Total impact (square
feet)
Multiplier
6e. Required mitigation
(square feet)
Zone 1
Parallel Construction
3,690
3,690
Zone 2
6f. Total buffer mitigation required
3690
0 0
6g. If buffer mitigation is required, is payment to a mitigation bank or NC Division of Mitigation Services proposed?
Yes No
6j. Comments:
F. Stormwater Management and Diffuse Flow Plan (required by DWR) O
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
What type of SCM are you providing?
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Other SCM that removes minimum 30 % nitrogen
Proposed project will not create concentrated stormwater flow through the buffer
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? *
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
Manhole covers are the only impervious surfaces. Remaining area will be returned to current pervious surface. No stormwater control will be required.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
Comments:
N/A
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
Surrounding area is fully developed and no additional service connections will be installed to either the proposed sewer main and proposed water main.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?"
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
U.S. Fish and wildlife services.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?"
NC Historic Preservation Office
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?
Yes No
8c. What source(s) did you use to make the floodplain determination?"
FEMA Flood Maps
Miscellaneous
O
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
PCN Executed Submittal.pdf 6.32MB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
O
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Stephen Reece
Signature
Date
9/26/2023