Loading...
HomeMy WebLinkAboutSW6090701_O&M Agreement_20090708Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the.basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element. Potentialproblem: How I will remediate theproblem: The entire BMP The perimeter of the wet detention basin Trash/debris is present. Areas of bare soil and/or erosive gullies have formed. Remove the trash/debris. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer a lica 'on. Vegetation is too short or too lon Maintain vegetation at a height of a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (Io be provided by DWQ) Drainage Area Number: BMP element: Potential roblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off -site. The pipe is cracked or Replace the pipe. vegetated shelf main treatment area Erosion is occurring in swale. Sediment has accumulated to a depth greater than the original design depth for sediment storage. occurred. are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Weeds are present. Sediment has accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50% of the area. Cattails, phragmites or other invasive plants cover 50% of the basin surface. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting of riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a professional to remove and control the algal growth. Remove the plants by wiping them with pesticide (do not spray). Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 154.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 154.00 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 154.00 I , ------------------ FOREBAY BASIN DIAGRAM Oil in the blanks) tft Min. Sediment Storage Permanent Pool Elevation 157.00 Sediment Removal Elevation 154.00 Vol um, ----------------------- ------ Bottom Elevation MAIN POND 1-ft Storage Form S W401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (robe provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Grays' Creek Middle School BMP drainage area number:one Print name:Mr. Wilson Lacy Title:Director of Operations. Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, �:M 01 an i P "Di I6(0/) , a Notary Public for the State of t`40Y /1 eO-Ct)A g County of , m g.A 4 do hereby certify that l(J� ��SD/1 LLP u personally appeared before me this LA day of aDU 9 , and acknowledge the due execution of the forgoin et etention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expirQs� Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4