Loading...
HomeMy WebLinkAboutSW6090701_Details_20090713ci is PWp zoW 7;:' J UJSon WGN " Za o�NW YN N Up 2 A1-^6 3QOB( WELDED TO CMP RISER TOP OF OUTLET BOX TOP OF RISER EL 160.50 EL. 160.78 25-YR 24 HOUR STORAGE ELEVATION EL. 159.99 10-YR 24 HOUR STORAGE ELEVATION EL. 159.29 — 5-YR 24 HOUR STORAGE ELEVATION — EL. 158.27 — — 1-YR 24 HOUR STORAGE ELEVATION — — — — — — — — — — — — — — — — — — — — — — — — — — — — — (3) 12" W x 30"L RECTANGULAR EL. 58.07 — — W.Q. TEMP STORAGE ELEVATION EL. 157.00 PERMANENT POND EL. 157.00 ------------------ INV. = 158.07 OPENING 4" DIA. OPENING INV. = 157.00 OPENING INVERT OUT 36" RCP ELEV. = 157.00 ANTI -VORTEX PLATE TRASH RACK TOP OF RISER EL 160.50 — — — — — STEPS I RISER TOP OF DAM 3:1 SIDE SLOPE 52.0' OF 36" CMP @ 4.4% POND BOTTOM EL. 153.00 BOTTOM OF RISER PIPE EXISTING CONCRETE BASE DESIGNED AND INSTALLED BY CONTRACTOR WET DETENTION POND CMP RISER OUTLET STRUCTURE DETAIL PROJECT MANAGER RA DRAVING SCALE 720 CORPORATE CENTER DRIVE RELEASED FOR DATE DK SHOWN p \ A /�/ RALEIGH, NC 27607 APPROVALS ➢ESIGN/➢RAVN BY PROJECT DATE v v ^ (919) 782-0495 BR JULY 2009 RPPROVED BY PROJECT NUMBER DICKSON BIDDING DK Office CONSTRUCTION FILE NAME Carolina Community infrastructure consultants North Cnrolina Georgia RECORD DWG, WATER QUALITY South Carolina Florida N.T.S. WATER QUALITY/DETENTION DESIGN AT GRAY'S CREEK MIDDLE SCHOOL FOR CUMBERLAND COUNTY SCHOOLS WET POND DETAILS II M M C:\Documents and Settings\brayal\Desktop\Grays{reek Pond Dasign from DaNd.dw ,WET POND DUALS (2), 7/6/2009 2:39:09 PM,A PlM.x3, Use M LA z Ya 126 9 O 2fi WgF w B FRI a .9 w8z .�05 � 22 d in� 3 iE§ 29 p �J E29 $601 �[ yyG--m bs Ln �J TASIMNmi\For Billy\13-22C pe 15.0' TOP OF DAM ELEV. 161.0 1.25' ELEV. 159.75 FILTER FABRIC KENTUCKY BLUEGRASS AND MAT LINER EMERGENCY SPILLWAY N.T.S. r— 12" THK. CONC. COLLAR 36" DIA. PIPE 12" MIN. BEYOND PIPE ANTI -SEEP COLLAR DAM AND EMBANKMENT CONSTRUCTION I. GENERAL - THE POND AND DAM AREA SHALL BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATIVE MATERIAL AND TOP SOIL PRIOR TO DAM CONSTRUCTION. THE DISPOSAL OF TREES, STUMPS, CONSTRUCTION DEBRIS, VEGETATIVE MATERIAL, ETC. SHALL NOT BE PERMITTED IN THE DAM OR POOL AREA OF THE POND. WHEN BLASTING IS USED TO REMOVE ROCK FROM THE POOL AREA, THE BLASTED AREA SHALL BE OVER -EXCAVATED TO A DEPTH OF AT LEAST TWO FEET (2) BELOW FINISHED GRADE AND BROUGHT BACK TO FINISHED GRADE WITH CLEAN RELATIVELY IMPERVIOUS SOIL MATERIAL COMPACTED IN PLACE. 2. EARTH FILL DAMS A) SOIL MATERIALS USED FOR EARTH FILL WHICH ARE HIGHLY PERMEABLE OR WHICH EXHIBIT SIGNIFICANT SHRINKAGE SWELL, OR DISPERSION SHALL NOT BE USED IN THE EMBANKMENT. B) A CUTOFF TRENCH (CORE TRENCH) SHALL BE PROVIDED WITH A MINIMUM WIDTH OF FIVE FEET (5'). THE CENTERLINE OF THE CUTOFF TRENCH SHALL NOT BE LOCATED DOWNSTREAM OF THE INSIDE TOP OF SLOPE OF THE DAM. THE CUTOFF TRENCH SHALL BE CAREFULLY BACK -FILLED WITH HIGHLY IMPERMEABLE MATERIAL AND COMPACTED TO AT LEAST NINETY-FIVE PERCENT (95%) OF STANDARD PROCTOR DENSITY. C) THE MINIMUM TOP WIDTH OF THE DAM SHALL BE TEN FEET (10-) AND SLOPES SHALL NOT BE STEEPER THAN 3:1 (THREE HORIZONTAL TO ONE VERTICAL) ON THE DAM OR EMBANKMENTS AROUND THE POND. D) ALL DISTURBED GROUND AREAS AND EMBANKMENTS SURROUNDING THE POND SHALL BE MECHANICALLY STABILIZED OR HAVE PERMANENT SEEDING SCHEDULE OPERATION AND MAINTENANCE INSPECTION EVERY MONTH TO INCLUDE THE FOLLOWING: I. REMOVE DEBRIS FROM THE OUTLET STRUCTURE. 2. CHECK AND CLEAR THE ORIFICE OF ANY OBSTRUCTIONS. 3. CHECK THE POND SIDE SLOPES; REMOVE TRASH, REPAIR ERODED AREA BEFORE THE NEXT RAINFALL EVENT. INSPECTION EVERY 3 MONTHS TO INCLUDE THE FOLLOWING: I. INSPECT THE COLLECTION SYSTEM (I.E. CATCH BASINS, PIPING, GRASSED SWALES) FOR PROPER FUNCTIONING. CLEAR ACCUMULATED TRASH FROM BASIN GRATES AND BASIN BOTTOMS, AND CHECK PIPING FOR OBSTRUCTIONS. 2. CHECK POND INLET PIPES FOR UNDERCUTTING, REPLACE RIPRAP, AND REPAIR BROKEN PIPES. 3. RESEED GRASS SWALES TWICE A YEAR AS NECESSARY. REPAIR ERODED AREAS IMMEDIATELY. INSPECTION EVERY 6 MONTHS TO INCLUDE THE FOLLOWING: I. REMOVE ACCUMULATED SEDIMENT FROM THE BOTTOM OF THE OUTLET STRUCTURE. 2. CHECK POND DEPTH AT VARIOUS POINTS IN THE POND. IF DEPTH IS REDUCED TO 75% OF ORIGINAL PERMANENT SEDIMENT STORAGE DESIGN DEPTH, SEDIMENT WILL BE REMOVED TO AT LEAST ORIGINAL DESIGN DEPTH. 3. OWNER IS RESPONSIBLE FOR PROVIDING A PUMP TO DRAIN THE POND FOREBAY FOR ROUTINE MAINTENANCE AND CLEAN OUTS, IF NEEDED. 4. OPERATE DRAIN VALVE FROM FULLY OPEN TO FULLY CLOSED POSITION. MAINTENANCE AS REQUIRED: I. MOW THE SIDE SLOPES ACCORDING TO THE SEASON. MAXIMUM GRASS HEIGHT WILL BE 6". 2. CATTAILS AND OTHER INDIGENOUS WETLAND PLANTS ARE ENCOURAGED ALONG THE POND PERIMETER; HOWEVER, THEY MUST BE REMOVED WHEN THEY COVER THE ENTIRE SURFACE AREA OF THE POND. 3. THE ORIFICE IS DESIGNED TO DRAW DOWN THE POND IN 2-5 DAYS. IF DRAWDOWN IS NOT ACCOMPLISHED IN THAT TIME, THE SYSTEM MAY BE CLOGGED. THE SOURCE OF THE CLOGGING MUST BE FOUND AND ELIMINATED. 4. ALL COMPONENTS OF THE DETENTION POND SYSTEM MUST BE KEPT IN GOOD WORKING ORDER LINE FACE OF DAM w/ I.0' OF # S7 WASHED STONE FILTER FABRIC UNDER DAM (MIRAFI 500 OR APPROVED EQUAL) KEY DAM INTO EXISTING GRADE NORMALPOOL 3:1 SIDE SLOPE 0.50' ABOVE NORh NORMALPOOI SECTION N.T.S. ELEVATION PnRFRAY RAFFI F 3:1 SIDE SLOPE 6' FOREBAY ELEV.=154.00�0 FOREBAY BAFFLE SEE DETAIL POND CROSS-SECTION N.T.S. PRO,ECT MANAGER DK DRAWING SCALE AS SHOWN W K ` - /�' ® DDICKSON Office Locations: community infrastructure consultants North Carolina Georgia South Carolina Florida RELEASED FOR DATE APPROVALS DESION/DRAWN BY BR PROJECT DATE JULY 2009 BIDDING APPROVED BY PROJECT -NUMBER DK FlLE NAME WATER QUALITY CONSTRUCTION RECORD DWG. 3:1 SIDE SLOPE 25-YR ELEV. 160.78 1-YR ELEV. 158.27 NORMAL POOL ELEV. 157.00 BOTTOM STORAGE ELEV. = 154 I' OF SEDIMENT STORAGE BOTTOM ELEV. = 153 30 0 30 60 SCALE: 1" 30' WET DETENTION POND SURFACE AREA SURFACE AREA FOREBAY FOREBAY PERM. POOL POND DEPTH I" STORAGE REQUIRED I PROVIDED VOLUME REQ. VOLUME PROVIDED ELEVATION (FT) ELEVATION (SF) (SF) (CF) (CF) 157.00 4.0' T 158.07 1 29.309 38,437 26,906 33,999 10:1 VEGETATIVE SHELF 3:1 SIDE SLOPE TOP OF DAM ELEV. 161.00 3:1 SIDE SLOPE WATER QUALITY/DETENTION DESIGN AT GRAY'S CREEK MIDDLE SCHOOL FOR CUMBERLAND COUNTY SCHOOLS WET POND DETAILS R 3 M