HomeMy WebLinkAbout20170887 Ver 2_Bethel Branch Buffer Mitigation Bank Parcel_Credit Release Request - Task 9_20230926WILDLANDS ENGINEERING September 26, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth (khogarth(a�wildlandseng com 540-907-9432) Through: Wildlands Holdings IV, LLC We formally request a credit release for the Bethel Branch Buffer Mitigation Bank Parcel (2017- 0887v2) for completion of Task 99 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #9 and are pending review: Monitoring Year 5 Report. Credits requested for release are detailed below: Credit Type % Release Credit Amount Notes/Comments include Units Buffer Restoration 10% 14,975.000 ft2 Buffer restoration: 0.10 x 88,800.000 ft2 = 8,880.000 ft2 Buffer restoration UT3 Ephemeral: 0.10 x 29,765.000 ft2 = 2,976.500 ft2 Buffer restoration UT3 Pond Area: 0.10 x 31,185.000 ft2 = 3,118.500 ft2 Buffer Preservation 10% 1,110.690 ft2 0.10 x 11,106.900 ft2 = 1,110.690 ft2 Buffer Enhancement 10% 10,604.250 ft2 Enhancement via cattle exclusion. 0.10 x 106,042.500 ft2 = 10,604.250 ft2 Generated Nitrogen Nutrient NA NA Offset Delivered Nitrogen Nutrient NA NA Offset (Jordan sites only) Generated Phosphorus NA NA Nutrient Offset Delivered Phosphorus Nutrient NA NA Offset (Jordan sites only) Signature: Attachments: 1) Approved Project Credit Table (As -Built) 2) Approved Credit Release Schedule (UMBI) Wildlands Engineering, Inc. (P) 919.851.9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 Approved Project Credit Table (As -Built) Bethel Branch Buffer Mitigation Bank Parcel Monitoring Year 0 - 2019 Total (Creditable) Area Total Area From Mitigation Credits Riparian Width Credit Type Mitigation Type Credit Ratio %of Full Credit of Buffer Mitigation Survey (sf) s (sf) Top of Bank— 100', Min. 30' Riparian Buffer 88,800 100% 88,800 88,800.000 Riparian Buffer Top of Bank —100', Min. 30' UT3-Ephemeral Restoration 1:1 29,765 100% 29,765' 29,765.000 Downstream of Pond Riparian Buffer Top of Bank— 100', Min. 30 31,185 100% 31,185* 31,185.000 UT3 - Pond Area Top of Bank— 100', Min. 30' Riparian Buffer Enhancement - 2:1 212,085 100% 212,085 106,042.500 Livestock Exclusion Top of Bank— 100', Min. 30' Riparian Buffer Preservation 10:1 111,069 100% 111,069^ 11,106.900 Total Riparian Buffer Restoration Credits 118,565.000 Total UT3 - Pond Area Buffer Restoration Credits 31,185.000 Total Riparian Buffer Enhancement - Livestock Exclusion Credits 106,042.500 Total Riparian Buffer Preservation Credits 11,106.900 Total Riparian Buffer Credits 266,899.400 'The area of buffer restoration credit around ephemeral stream reaches makes up 12.9% of the total buffer mitigation area. ^The area of preservation credit makes up 23% of the total buffer mitigation area. Approved Credit Release Schedule (UMBI) Bethel Branch Buffer Mitigation Bank Parcel Umbrella Mitigation Banking Instrument Credit % Credit Release Task Project Milestone Available for Sale within the Pond Footprints Instrument and BPDP Approved by DWR, Conservation 1 Easement Recorded and Financial Assurance Posted 20 No credits for Mitigation Site Earthwork, Planting and Installation of released areas within the pond 2 Monitoring Devices Completed, 401/404 permits approved (if 20 footprints applicable) Monitoring Financial Assurance Posted and DWR Approval of 3 Buffer Mitigation As -Built Report and Stream and Wetland 10 50 Mitigation As -Built Report submitted to IRT 4 Monitoring Report #1: Approved by the DWR & financial 10 10 assurance renewed Monitoring Report #2: Approved by the DWR & financial 5 assurance renewed 10 10 Monitoring Report #3: Approved by the DWR & financial 6 assurance renewed 10 10 Item B(1) of Section X in this Instrument has been completed 7 and approved by DWR 5 5 No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship Monitoring Report #4: Approved by the DWR & financial 8 assurance renewed 5 5 Monitoring Report #5: Approved by the DWR and final site visit 9 by DWR has been conducted 10 10 Total 100% 100%