Loading...
HomeMy WebLinkAbout20180955 Ver 2_Shoreline Stabilization_20230922CA ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Paul Wojoski DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to th-e-cectifying_auth-oxity_at least30_day-s_prioiAosubmitting-the_cer-tificationseq.uest—Click-here -to-read- more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request to this application. Date of Pre -filing Meeting Request: _// (required) DWR ID # Version (if applicable) A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Salisbury Elks Lodge #699 Mailing Address: 508 S. Main St. Telephone Number E-mail Address: Salisbury, NC 28144 704-636-1161 Fax Number: salisburyelks699@gmail.com RECEIVED S E P 2 2 2023 DEQ-WATER RESOURCES 401 & BUFFER PERMITTING D—� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 um om rm��«imaminy 919.707.9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.Pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: B. Project Information [15A NCAC 02H .0502(a) & (b)j 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some-so_r_t-a_y_ar_d_stick,sb-o-velhan_ Ue_e_tc) 4. Location of the property (where work is to be conducted) County: Rowan Nearest Town: Salisbury Lake/ river/ ocean adjacent to property: High Rock Lake Property size (acres): 21.8 acres Subdivision name or site address (include phase/lot number): 390 Lodge Trail, Salisbury, NC Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Long Ferry Rd. exit, east on Long Ferry Rd., R on Lodge Trail, L at fork in road, Property is at end of road. Latitude (in decimal degrees) 35.39.4884 Longitude (decimal degrees) 80.18.5237 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Partially developed lake front parcel FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avokled, or why It Is necessary): - To stabilize an eroding shgndbe arwmated it i from further erosion,I 1 7. Will work be conducted from land? ® From water? ❑ S. Total amount of Impacts below the normal pool lake level j Normal Water Level Permanent Impacts (im*Wkq al excavation, backfill, rip rap, retaining walls, etc.) In square feet: Ow sa. ft t i Temporary impacts in square feet: None i 9. Total amount of Impacts above the normal pool lake level / Normal Water Level and So feet land -ward Permanent Impacts (incud*V back fill, excavation, rip rap, retaining wak etc.) In square feet: j 3 000 so ft. - -- - i Temporary impacts (temporary clearing, construction corridor) In square feet: so It lo. Please describe the vegetation above the normal pool lake level/ Normal Water Level VW So feet landward to.be Impacted Ober of trees, for instance): - - Mimerous trees wig be removed to tn_ the Mposed rela gaftlft, j 11. Signature i i SY signing below, I, as the project pent, certify to the following: • The project proponent hereby certifies that all information contained herein is trice, arcut of and complete to the best of my knoalecige-and. belie# • Theproject poponenrt hwvblrrequests that the certifft authority review and take action on this CWA 401 certification request within the applicable reasonable period of time -? 13 Owner/Agent's nature' [1SA NCAC a2H .0502tf)1 Date 'AG"es signature is vadtd o* if an authorization letter ji rvm the owner fs provided 22. Please approximately sketch the following information on this plan and provide Armnsion for estcb �rrr►: AR proposed veptation dearig b. ; Location.of rip rap or 91 to be placed above the Full Pond/ Normal Water Level elevation c. 'i do men Oro rap-orf it ter..bye placed below the Rill Pond] MOM* level elevation FORM: SSGP 08-2020 Page 3 of 6 d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level Shoreline Plan View Lake (At FWI Pand; N,—! Water ;eceq Existing Dock / 30ftx 7ft Full �=04onrn lr�ataer Level - .141tiomal clearing If n—ry E i tA. M.., P L'E Plan View FORM: SSGP 09-2020 Page 4 of 6 FORM: SSGP 09-2020 Page 5 of 6 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing "If necessary Existing bank 10 ft. bank a height /0, I MEMO !Za a 121 .- _= FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Salisbury Elks Lodge #699 390 Lodge Trail, Salisbury, NC STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 400 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope _ (400') x ,(1') x (2) = 800 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 100 LF of Shoreline = 2 ft. Above Normal Pool Estimate 200 LF of Shoreline = 3 ft. Above Normal Pool Estimate 100 LF of Shoreline = 5 ft. Above Normal Pool Area of Impact = Length x Height x Slope = ( 100' x 2' x 2) + ( 100' x 3' x 2) + ( 200' x 5' x 2) = 400 + 600 + 2000 = 3,000 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 400' x 5 ft. = 2,000 sq. ft. Total Area of Impact Above Normal Pool Level = 5,000 sq. ft. ee&(N ioUNAVIT"I g 150cf+ , f 6f AT Sure T Guru TP-W 2M 612 /,-",-,612 056 1 612 059 oil 0312 186 ,'612 088 t0l2s=16 612183 612 055 612D232 612 053 6120233 61213234 �± C�� ConneoMIS V :tip �v> I 612 023 612 008 612D237 612D235 612205.. 612D236 61210238 6120239 6120240 612D; � 61 612 006 612D243 :g5 612 213 612185 --SMI 2� 1",405 612D249 612 232 612148 612156 Sty t6 812101 `w .` l 612 136612 153 °� e t 6120244 '` 612 059 �� 012 t15 q `612 233 , 612180 2� 612 088 f f; 6121�Si2194 � 612149 1 612 245812158 -4, t 612 091 ;'� S Z 612 230 612187 .4 Excel 2000/2003 — ; Results Display Labels 1-1 02009-2016 Dude Solutions. A8 Rights Reserved. I software Notices 600038 httP:11rowon2.conr*M1s.o= MaPjwx iH VEGETATION AND EROSION CONTROL FABRIC EXISTING GRADE I � I CLASS 2 RIP RAP I varies 2to5ft. 1 � I 2 ol I EROSION CONTROL FABRIC —f� Assume oe SAKE �---- \,\\. BOTTOM TYPICAL CONDITIONS 36" TO 72" ERODED CUT WAVE EXPOSURE FOR: SALISBURY ELKS LODGE #699 LOCATION: 390 LODGE TRAIL, TAX PARCEL 612 005 HIGH ROCK LAKE RESERVOIR: PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL MODERATE RIP RAP STABILIZATION 3 I ME. . wwl� UL a L AA- W4 -- = APWMI%Z . Now At, ......... %Wswmbk..- w4l A �7' A 0 mi Nj bing maps 390 Lodge Trail, Salisbury, NC 28146 Location: 35.663563,-80.314524 MIDDLE OAK LAIS ACRES VIEW ESTATES WILDWOOD ACRES LAKESIDE FARMS _..._ ... lip CRANE POINT Fu:�. ifr:ocls 390 Lodge Trail, Salisbury, NC 28146 Crane Creek ANCHOR DOWNS High RoSk Lake a 2000 ft 500 m ® 2023 TomTom, ®OpenSh%tMap. _.