HomeMy WebLinkAboutSW6110105_401 Certification Application_20110307Permit No. 59WW-11&1Y0.5
(to be provided by DWQ)
ojov W A r,
STORMWATER MANAGEMENT PERMIT APPLICATION FORM c
tdCDEPIR 401 CERTIFICATION APPLICATION FORM o
INFILTRATION TRENCH SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
�I.'%PROJECT,INFORMATION;%ra'fsar6Nf=x} +' RE IN:.# "a } f1 $ r Ta ili, wTti
Project name Fort Bragg SOF Opeiatoos Additions . - -
Contact person John Peterson
Phone number 501-372-2900
Date 1212212010
Drainage area number 2,
Site Characteristics
Drainage area
Impervious area
Percent impervious
Design rainfall depth
Peak Flow Calculations
1-yr, 24-hr rainfall depth
1-yr, 24-hr intensity
Pre development 1-yr, 24-hr discharge
Post -development 1-yr, 24-hr discharge
Pre/Post 1-yr, 24-hr peak flow control
Storage Volume: Non -SA Waters
Minimum volume required
Volume provided
Storage Volume: SA Waters
1.5' runoff volume
Pre -development 1-yr, 24-hr runoff volume
.Post -development 1-yr, 24-hr runoff volume
Minimum volume required
Volume provided
Soils Report Summary
Soil type
Infiltration rate
SHWT elevation
Trench Design Parameters
Drawdown time
Perforated pipe diameter
Perforated pipe length
Number of laterals
Stone type (if used)
Stone void ratio
Slone is free of fines?
36,470.00 ftz
14,810.00 ft2
40.6% %
1.00 in
3.00
in
0.13
inthr
,0.04
ft'/sec
0.00
ft'/sec
-0.04
ft'/sec
3,039.00 ft'
3,664.00 ft'
ff'
Its
fe
Bradu Loamy Sand
OK for non -SR waters
4.50
in/hr
2652
fmsl
0.40
days OK
48.00
in
270.00
ft
1
Gravel
0.4
Y
(Yor N) OK
Form SW401-Infiltration Trench-Rev.4 Parts I. 8 II. Design Summary, Page t of 2
Trench Elevations
Bottom elevation
Storage/overflow elevation
Top elevation
Trench Dimensions
Length (long dimension)
Width (short dimension)
Height (depth)
Additional Information
Maximum volume to each inlet into the trench?
Length of vegetative filter for overflow
Number of observation wells
Distance to structure
Distance from surface waters
Distance from water supply wells)
Separation from impervious soil layer
Depth of naturally oocuting soil above SHWr
Bottom covered with 4-in of dean sand?
Proposed drainage easement provided?
Capures all runoff at ultimate build -out?
Bypass provided for larger storms?
Trench wrapped with geotextile fall
Pretreatment device provided
279.40
fmd
282.90
fmsl
285.15
fmsl
270.00 .
it
7.00
ft
6.75
it
0.84
aGn
NA
it
35.00
it
1,500.00
it
5,000.00
it
NA
it
30.00
it
Y ..
(YorN)
.NA
(Y or N)
-. -Y
(Y or N)
Y
(Y or N)
Y
(YorN)
1121
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Permit No. SW6 //69/05
(fo be provided by Qt4/Q)
Form SW401-Infiltration Trench-Rev.4 Pans I. & II. Design Summary, Page 2 of 2
Permit
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Page/ Plan
Initials
Sheet No.
CG801
1. Plans (1' - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Trench dimensions,
- Pretreatment system,
- High Bow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
- Boundaries of drainage easement.
CG sheets
2. Partial plan (1' = 30' or larger) and details for the infiltration trench showing:
/
- Bypass structure,
- Maintenance access,
- Basin bottom dimensions,
- Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow,
Vegetated filter, and
- Pretreatment device.
CG301/502
3. Section view of the infiltration trench (1' = 20' or larger) showing:
- Pretreatment and treatment areas, and
-Inlet and outlet structures.
CG801
4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
Soils Report
5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWO, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
CG700-711
6. A construction sequence that shows how the infiltration basin will be protected from sediment until the
//JJ����
entire drainage area is stabilized.
�/
/�
Cates
7. The supporting calculations.
0&M
8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
N�
NA
9. A copy of the deed restrictions (if required).
Form SW40LInfiltration Trench-Rev.4 Part III. Required Items Checklist, Page 1 of 1
Permit NoUW% 1 1 0 l0 5
(to be provided by DWQ)
ipH
®CA�O
OY'KA
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM °
401 CERTIFICATION APPLICATION FORM
INFILTRATION TRENCH SUPPLEMENT
This form must be filled out, printed and submitted.
The Required
Items Checklist (Pad 111) must be printed, filled out and submitted along with all of the required information.
Project name Fort Bragg SOF Operators Additions
Contact person John Peterson
Phone number 501-372-2900
Date .12/22/2010
Drainage area number 3 '
I Ito DESIGNIINF.ORMATIO
EN
Site Characteristics
Drainage area
13.506.00
ftz
Impervious area
13,500.00
ryz ovNmtCtr�oii
Percent impervious
100.0°h
% ono``' , ,•, �V��i,,
Design rainfall depth
'1;g0
in �O: V_ %
Peak Flow Calculations''
1-yr, 24-hr rainfall depth
3.00
' in 0
1-yr, 24-hr intensity
0.13
iNhr
Pre -development 1-yr, 24-hrdischarge
0.03
ft'/sec %v0.•F�`aG-r
Post -development 1-yr, 24-hrdischarge
0.00;:'
1 NE;k•'
it /sec•'•••.r•••c
PrelPost 1-yr, 24-hr peak flow control
-0.03
ft'/sec '"niyrgUnrnPlltCiiW``0����"p
Storage Volume: Non -SA Waters
Minimum volume required
,2,673.00
it'
Volume provided
2,881.00' .
R' OK for ron-SR waters
Storage Volume: SA Waters
1.5' runoff volume
ry'
Pre -development l-yr,24-hrrunoffvolume
•'
.ry'
Post -development 1-yr, 24-hr runoff volumes
Minimum volume required
to
Volume provided
to
Soils Report Summary
Soil type
Bragg
Sand
Infiltration rate
"4.507.
in/hr
SHWT elevation
''. 265:00' "'
fmsl
Trench Design Parameters
Drawdown time
- ..0.72,
days OK
Perforated pipe diameter
60.00 '
in
Perforated pipe length
„%40.00
it
Number of laterals
2-
Stone type (if used)
Gravel
Stone void ratio
0.4
Stone is free of fines?
- Y
(Y or N) OK
Form SW401-Infiltration Trench -Rev 4 Parts 1. & 11. Design Summary, Page t of 2
Permit No. S54) 6 ll of o 5
(to be provided by D WD)
Trench Elevations
Bottom elevation
289.25
frost
OK
Storage/overlowelevation
295:71
fmsl
Top elevation
297,00,
fast
Trench Dimensions
Length (long dimension)
. 40.00.
it
Width (short dimension)
20.00-' .i
ft
Height (depth)
7.75
ft
OK
Additional Infomration
Maximum volume to each inlet into the trench?
0.31.1:
ac-in
OK
Length of vegetative filter for overflow
:NA •_-'.d.•ft
OK
Number of observation wells
.1
OK
Distance to structure
15.00
ft
OK
Distance from surface waters
1,500.00
it
OK
Distance from water supply well(s)
5,000.00.-.
it
OK
Separation from impervious soil layer
.' NA ..
it
OK
Depth of naturally occurring soil above SHWr
35.00
ft
OK
Bottom covered with 4-in of dean sand?
Y
(Y or N)
OK
Proposed drainage easement provided?
NA
(Y or N)
OK
Captures all runoff at ultimate buld-out?
Y,-
(Y or N)
OK
Bypass provided for larger storms?
:Y .,
(Y or N)
OK
Trench wrapped with geotexlile fabric?
Y
(Y or N)
OK
Pretreatment device provided
VEGETATIVE
SURFACE
Farm SW401-Infiltration Trench -Rev 4 Parts I. & 11. Design Summary, Page 2 of 2
Permit No. Seyaa//O/Oj
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials
Sheet No.
p/ /�
CG801
�P
1. Plans (1' - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Trench dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROV),
- Overflow device, and
- Boundaries of drainage easement.
CG sheets 2. Partial plan (1' = 30' or larger) and details for the infiltration trench showing:
- Bypass structure,
- Maintenance access,
- Basin bottom dimensions,
- Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow,
- Vegetated filter, and
- Pretreatment device.
CG3011502 3. Section view of the infiltration trench (1' = 20' or larger) showing:
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
CG801 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
Soils Report 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by ONO, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
CG700-711 6. A construction sequence that shows how the infiltration basin will be protected from sediment until the
entire drainage area is stabilized.
Calcs 7. The supporting calculations.
0&M 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
NA 9. A copy of the deed restrictions (if required).
Form SW401-Infiltration Trench-Rev.4 Part III. Required Items Checklist, Page 1 of 1