HomeMy WebLinkAboutNCC215079_NOT Closeout Documents_20230922 Sedimentation/Constiruction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building,225 Green Street, Suite 714,Fayetteville,NC 28301-5094
(910)433-3300
Biscoe-Rockingham 230kV Replace
County: Richmond Project: Switch 51-1 River basin: Yadkin-PeeDee
Person financially responsible:Duke Energy Progress,LLC-Randy Veltri, Project#: RICHM-2022-003
Director of Transmission Permitting NCC215079
Address: 550 S.Tryon St.,Suite 4500,Charlotte,NC
1. Project Location: Lake Point Drive(SR 1565),Rockingham
Pictures: No
2. Weather and soil conditions: sunny/partly cloudy workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: September 22,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCGO1)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Ternination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Penny Markle Others present:
Date of inspection: September 20,2023 Time arriving on site: 12:35 PM Time leaving site: 12:50 PM
cc: