Loading...
HomeMy WebLinkAboutNCC215079_NOT Closeout Documents_20230922 Sedimentation/Constiruction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building,225 Green Street, Suite 714,Fayetteville,NC 28301-5094 (910)433-3300 Biscoe-Rockingham 230kV Replace County: Richmond Project: Switch 51-1 River basin: Yadkin-PeeDee Person financially responsible:Duke Energy Progress,LLC-Randy Veltri, Project#: RICHM-2022-003 Director of Transmission Permitting NCC215079 Address: 550 S.Tryon St.,Suite 4500,Charlotte,NC 1. Project Location: Lake Point Drive(SR 1565),Rockingham Pictures: No 2. Weather and soil conditions: sunny/partly cloudy workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: September 22,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO1)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Ternination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: September 20,2023 Time arriving on site: 12:35 PM Time leaving site: 12:50 PM cc: