HomeMy WebLinkAbout20181273 Ver 2_USACE Permit_20230926Baker, Caroline D
From:
Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>
Sent:
Tuesday, September 26, 2023 4:00 PM
To:
Xu, Lin; Carolyn Lanza
Cc:
Jeff Keaton; Wiesner, Paul; Kichefski, Steven L CIV USARMY CESAW (USA); Tugwell,
Todd J CIV USARMY CESAW (USA); Isenhour, Kimberly T CIV USARMY CESAW (USA);
Polizzi, Maria; Bowers, Todd; Youngman, Holland J; Wilson, Travis W.; Leslie, Andrea J;
McHenry, David G; Jones, M Scott (Scott) CIV USARMY CESAW (USA)
Subject:
[External] NWP 27 Authorization/ NCDMS Bug Headwaters / SAW-2018-01788/
Wilkes County
Attachments:
2022 NWP 27.pdf, NWP27_NCDMS Bug Headwaters_SAW-2018-01788.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Lin and Carolyn,
Attached to this message is the requested Section 404 permit authorization for the following project:
Project Name: NCDMS Bug Headwaters Mitigation Project
USACE Action ID: SAW-2018-01788
Location: Latitude: 36.320698°N Longitude:-80.984329°W
County: Wilkes
Also attached are the corresponding regional and general conditions, and the permit compliance certification.
Please note that design plans submitted with the PCN as well as all special, general and regional conditions must be
strictly adhered to in order for this verification letter/authorization to remain valid.
This electronic copy is your official Department of the Army authorization; no paper copy will be mailed.
Thank you,
Casey Haywood
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 750-7397 work cell
From: Haywood, Casey M CIV USARMY CESAW (USA)
Sent: Tuesday, September 26, 2023 11:29 AM
To: Xu, Lin <lin.xu@deq.nc.gov>; Jeff Keaton <jkeaton@wildlandseng.com>
Cc: Carolyn Lanza <clanza@wildlandseng.com>; Wiesner, Paul <paul.wiesner@deq.nc.gov>; Kichefski, Steven L CIV
USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.miI>; Tugwell, Todd J CIV USARMY CESAW (USA)
<Todd.J.Tugwell@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA)
<Kimberly.T.Isenhour@usace.army.mil>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Bowers, Todd
<bowers.todd@epa.gov>; Youngman, Holland J <hollandyouungman@fws.gov>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; McHenry, David G
<david.mchenry@ncwildlife.org>
Subject: Provisional NWP 27 Verification/ NCDMS Bug Headwaters / SAW-2018-01788/ Wilkes County
Good morning Lin and Jeff,
This is a provisional general permit verification. Your proposed work may be authorized by the above referenced general
permit once EPA has completed their review and issues a determination for this project pursuant to CWA Section 401
(a)(2). Once received, the Corps will provide you with a final general permit verification. Your proposed work shall NOT
commence until after the 401 Certification has been issued or waived AND until a final general permit verification has
been provided to you. Attached are the corresponding regional and general conditions associated with this permit.
Please note additional special conditions may be added to the final general permit verification.
Project Name: NCDMS Bug Headwaters Mitigation Project
USAC E Action ID: SAW-2018-01788
Location: Latitude: 36.320698°N Longitude:-80.984329°W
County: Wilkes
Special Conditions:
1. The permittee understands and agrees that the document entitled "Mitigation Plan Final- Bug Headwaters"
dated September 2020, and the Memorandum dated July 7, 2023, is incorporated and made part of this
permit. Execution of the work and terms given in the approved mitigation plan are a condition of this permit.
2. Tree clearing of suitable roost trees must be avoided from April 1 to October 15, when TCB (and NLEB) is most
likely to be foraging/roosting in forested areas, and during pup season (June 1- July 31).
3. This Nationwide Permit verification does not imply suitability of this property for compensatory mitigation for
any particular project. The use of any portion of this site as compensatory mitigation for a particular project
will be determined during the permit review process for that project.
Please contact me if you have any questions regarding this provisional verification.
Thank you,
Casey Haywood
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 750-7397 work cell