Loading...
HomeMy WebLinkAbout20190044 Ver 2_Credit Release Request Form - Thoroughfare MY4 September_20230922September 22, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth Email: khogarth@wildlandseng.com Phone: 540-907-9432 Through: Wildlands Holdings III, LLC We formally request a credit release for the Thoroughfare Swamp Mitigation Bank Parcel for completion of Task 8 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task 8 and are pending review: Thoroughfare Swamp Mitigation Bank Parcel Monitoring Year 4 Report. Credits requested for release are detailed below: Credit Type % Release Credit Amount (Include Units) Notes/Comments Buffer Restoration 5% 28,413.60 Square Feet Buffer Preservation 5% 36.85 Square Feet Buffer Enhancement NA NA Generated Nitrogen Nutrient Offset 5%877.96 Pounds Delivered Nitrogen Nutrient Offset (Jordan sites only) NA NA Generated Phosphorus Nutrient Offset NA NA Delivered Phosphorus Nutrient Offset (Jordan sites only) NA NA Signature: Attachments: 1) Approved Project Credit Table – As-Built Report 2)Approved Credit Release Schedule – BPDP Table 1. Project Mitigation Credits Thoroughfare Swamp Mitigation Bank Parcel Service Area N Credit Ratio (sf/credit) P Credit Ratio (sf/credit) Credit Type Location Subject? (enter NO if ephemeral or ditch 1) Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (sf) Creditable Area (sf) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits Convertible to Nutrient Offset? Nutrient Offset: N (lbs) Nutrient Offset: P (lbs) Buffer Rural No Ephemeral Restoration 0-50 A1 24,131 24,131 1 100%1.00000 24,131.000 Yes 1,259.188 — Buffer Rural No Ephemeral Restoration 0-100 A1 24,950 24,950 1 100%1.00000 24,950.000 Yes 1,301.924 — Nutrient Offset Rural No Ephemeral Restoration 101-200 A1 46,889 46,889 1 33%3.03030 15,473.385 Yes 2,446.731 — Buffer Rural Yes I / P Restoration 0-50 A2 B 249,147 249,147 1 100%1.00000 249,147.000 Yes 13,000.823 — Buffer Rural Yes I / P Restoration 0-100 A2 B 270,038 270,038 1 100%1.00000 270,038.000 Yes 14,090.944 — Nutrient Offset Rural Yes I / P Restoration 101-200 A2 B 289,612 289,612 1 33%3.03030 95,572.056 Yes 15,112.341 — —— —— —— —— —— —— —— —— —— —— —— —— —— Creditable Area Subtotal (sf):904,767 Creditable Area Subtotal minus Nutrient Offset Area (sf):568,266 Enter Preservation Credits Below Eligible for Preservation (sf):189,422 Credit Type Location Subject?Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (sf) Creditable Area (sf) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits 49081 Buffer Rural Yes I / P 0-100 A2 5,876 5,876 10 100%10.00000 587.600 Buffer Rural Yes I / P 101-200 A2 5,046 5,046 10 33%30.30303 166.518 Buffer — Buffer — Buffer — Buffer Preservation — Buffer — Buffer — Buffer — Buffer — Buffer — Preservation Area Subtotal (sf):10,922 Preservation as % Total Area of Buffer Mitigation:1.4% Ephemeral Reaches as % Total Area of Buffer Mitigation:8.5% Square Feet Credits 568,266 568,266 0 0 10,922 754 579,188 569,020 Square Feet Credits Nitrogen:17,559.072 1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).Phosphorus:0.000 Neuse 03020201 - Excluding Falls Lake 19.16394 N/A Restoration: Enhancement: Mitigation Totals 336,501 TOTAL RIPARIAN BUFFER MITIGATION CREDITS TOTAL NUTRIENT OFFSET MITIGATION CREDITS Mitigation Totals Nutrient Offset: Preservation: Total Riparian Buffer:                            Thoroughfare Swamp Credit Release Schedule  Task Project Milestone % Credit Available  for Sale  1 Instrument and BPDP Approved by NCDWR, Conservation Easement  Recorded and Financial Assurance Posted 20  2 Mitigation Site Earthwork, Planting and Installation of Monitoring  Devices Completed 20  3 Monitoring Financial Assurance Posted and Approval of As‐Built Report 10  4 Monitoring Report #1: Approved by the NCDWR & financial assurance  renewed 10  5 Monitoring Report #2: Approved by the NCDWR & financial assurance  renewed 10  6 Monitoring Report #3: Approved by the NCDWR & financial assurance  renewed 10  7 Item B(1) of Section X in this Instrument has been completed and  approved by NCDWR 5  No remaining credits will be released until the conservation easement has been assigned to an  approved land trust or stewardship  8 Monitoring Report #4: Approved by the NCDWR & financial assurance  renewed 5  9 Monitoring Report #5: Approved by the NCDWR and final site visit by  NCDWR has been conducted 10   Total 100%