HomeMy WebLinkAboutNC0079057_Authorization to Construct_20230926DocuSign Envelope ID: 1550F8E6-EF56-4A7C-ABCB-152F7DD5294E
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JP,.
Director
Melissa Dickerson
Town Manager
Town of Manteo
407 Budleigh Street, P.O. Box 246
Manteo, North Carolina 27954
Dear Melissa Dickerson:
NORTH CAROLINA
Environmental Quality
September 26, 2023
SUBJECT:
Authorization to Construct
A to C No. 079057A01
Town of Manteo
Town of Manteo WWTP
NPDES Permit No. NCO079057
A letter of request for an Authorization to Construct was received July 24, 2023, by the
Division of Water Resources (Division). Final plans and specifications for the subject project have
been reviewed and found to be satisfactory. Authorization is hereby granted for the construction
of modifications to the existing 0.6 MGD Town of Manteo Wastewater Treatment Plant, with
discharge of treated wastewater into the Shallowbag Bay in the Pasquotank River Basin.
This authorization results in no increase in design or permitted capacity and is awarded for
the construction of the following specific modifications:
Replacement of existing chlorine disinfection with two (2) 1.5 MGD UV banks with
twenty-four (24) lamps per bank and installation of all necessary piping and controls; in
conformity with the project plans, specifications, and other supporting documentation
comprising the ATC Permit Application package submitted to the Department of
Environmental Quality.
This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No.
NCO079057 issued effective July 1, 2019, and shall be subject to revocation unless the wastewater
treatment facilities are constructed in accordance with the conditions and limitations specified in
Permit No. NC0079057.
North Carolina Department of Environmental Quality I Division of Water Resources
D � 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
NORTH CARCLINA ^ 919.707.9000
DocuSign Envelope ID: 1550F8E6-EF56-4A7C-ABCB-152F7DD5294E
Melissa Dickerson, Town Manager
September 25, 2023
Page 2 of 3
It is the Owner's responsibility to ensure that the as -constructed project meets the
requirements of all applicable regulations and statutes, the ATC Permit Application package, and
all of the requirements contained herein. Failure to comply may result in penalties in accordance
with North Carolina General Statute § 143-215.6A through § 143-215.6C.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Washington Regional Office, telephone number 252-946-6481, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a Professional Engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit and the ATC Permit Application package.
Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail
Service Center, Raleigh, NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0201. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0204.
A copy of the project plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
DocuSign Envelope ID: 1550F8E6-EF56-4A7C-ABCB-152F7DD5294E
Melissa Dickerson, Town Manager
September 25, 2023
Page 3 of 3
During the construction of the proposed additions/modifications, the Permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance with
the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina
Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in compliance with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
The issuance of this ATC does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government agencies
(local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please contact Amir Adaryani at
telephone number (919) 707-3704 or by email at amir.adaryani@deq.nc.gov.
Sincerely,
DocuSigned by:
CE9CD2D3C45B4D4...
for Richard E. Rogers, Jr.
Director, Division of Water Resources
by Douglas Dowden
Supervisor, NPDES Industrial Permitting Unit
Attachments: Engineer's Certification
cc: NPDES Files
ecopy: Thomas D. Dienes, PE
Green Engineering, PLLC
Email: t.dienes@greeneng.com
DWR Washington Regional Office, Water Quality Programs
Without Engineer's Certificate attached:
cc: Dare County Health
ecopy: DWI/James Baltzer, PE
Town of Manteo
Town of Manteo WWTP
Authorization to Construct No. 079057A01
Issued September 26, 2023
NPDES Permit No. NC0079057
Engineer's Certification
I, , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the Town of Manteo Wastewater
Treatment Plant, located in Dare County, hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the following construction:
Replacement of existing chlorine disinfection with two (2) 1.5 MGD UV banks
with twenty-four (24) lamps per bank and installation of all necessary piping and
controls; in conformity with the project plans, specifications, and other supporting
documentation comprising the ATC Permit Application package submitted to the
Department of Environmental Quality.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance, intent and in conformity with all applicable regulations and statutes and
the project plans, specifications, and other supporting documentation comprising the
Authorization to Construct Permit Application package.
Signature Registration No.
Date
i
Mail this Certification to: Attn: Ori Tuvia SEAL
NPDES Industrial Permitting Unit
DEQ/DWR/Water Quality Programs
1617 Mail Service Center
Raleigh, NC 27699-1617