HomeMy WebLinkAbout20210019 Ver 2_OBerry Road Mitigation Bank Parcel_Credit Release Request - Task 4_20230921
Wildlands Engineering, Inc. (P) 919.851.9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609
September 21, 2023
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Kaitlyn Hogarth (khogarth@wildlandseng.com, 540-907-9432)
Through: Wildlands Holdings III, LLC
We formally request a credit release for the O’Berry Road Mitigation Bank Parcel (2021-0019v2)
for completion of Task 4 per the approved credit release schedule, which is included in the
Attachments with this request. The following documents have been submitted to NCDWR for Task 4
and are pending review: Monitoring Year 1 Report.
Credits requested for release are detailed below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration 10% 26,200.200 ft2 0.10 x 262,002.000 ft2 =
26,200.200 ft2
Buffer Preservation 10% 873.340 ft2 0.10 x 8,733.400 ft2 =
873.340 ft2
Buffer Enhancement NA NA
Generated Nitrogen Nutrient
Offset
10% 2,773.318 lbs. N 0.10 x 27,733.180 lbs. N =
2,773.318 lbs. N
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
NA NA
Generated Phosphorus Nutrient
Offset
NA NA
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
NA NA
Signature:
Attachments:
1) As-Built Project Credit Table
2) UMBI approved Credit Release Schedule
Project Area
N Credit Conversion Ratio (ft2/pound)
P Credit Conversion Ratio (ft2/pound)
Credit Type Location
Subject?
(enter NO if
ephemeral or
ditch 1)
Feature Type Mitigation
Activity
Min‐Max
Buffer Width
(ft)
Feature Name Total Area
(ft2)
Total
(Creditable)
Area of Buffer
Mitigation (ft2)
Initial
Credit
Ratio (x:1)
% Full
Credit
Final Credit
Ratio (x:1)
Convertible
to Riparian
Buffer?
Riparian Buffer
Credits
Convertible
to Nutrient
Offset?
Delivered
Nutrient
Offset: N
(lbs)
Delivered
Nutrient
Offset: P
(lbs)
Buffer Rural Yes I / P Restoration 0‐100 O'Berry Creek, UT1 626,002 262,002 1 100% 1.00000 Yes 262,002.000 Yes 13,671.615 —
Nutrient Offset Rural Yes I / P Restoration 101‐200 O'Berry Creek, UT1 313,228 1 33%No —Yes 16,344.656 —
Nutrient Offset Rural No Ditch Restoration 0‐200 Ditch A, Ditch B,
Ditch C, Ditch D 218,249 1 100%No —Yes 11,388.524 —
Rural No Ditch Restoration
Diffuse Flow
Deductions 5,146 1 No —No ——
Totals (ft2):798,625 262,002 262,002.000 41,404.795 0.000
Total Buffer (ft2):626,002 262,002
Total Nutrient Offset (ft2):531,477 N/A
Total Ephemeral Area (ft2) for Credit:00
Total Eligible Ephemeral Area (ft2):87,334 0.0%Ephemeral Reaches as % TABM
Enter Preservation Credits Below Total Eligible for Preservation (ft2):87,334 25.0%Preservation as % TABM
Credit Type Location Subject? Feature Type Mitigation
Activity
Min‐Max
Buffer Width
(ft)
Feature Name Total Area
(sf)
Total
(Creditable)
Area for Buffer
Mitigation (ft2)
Initial
Credit
Ratio (x:1)
% Full
Credit
Final Credit
Ratio (x:1)
Riparian
Buffer
Credits
Buffer Rural Yes I / P Preservation 0‐100 O'Berry Creek,
UT1 201,437 87,334 10 100% 10.00000 8,733.400
Buffer Rural Yes I / P Preservation 101‐200 O'Berry Creek,
UT1 54,249 10 33%—
Preservation Area Subtotals (ft2):255,686 87,334
Square Feet Credits
262,002 262,002.000
0 0.000
87,334 8,733.400
349,336 270,735.400
Square Feet Credits
Nitrogen:27,733.180
Phosphorus:0.000
Total Riparian Buffer:
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
Nutrient Offset:531,477
TOTAL AREA OF BUFFER MITIGATION (TABM)
Mitigation Totals
Restoration:
Enhancement:
Preservation:
N/A
As-Built Project Credit Table
O'Berry Road Mitigation Bank Parcel
Monitoring Year 0 ‐ 2023
Neuse 03020201 ‐ Outside Falls Lake
19.16394
UMBI approved Credit Release Schedule
O’Berry Road Mitigation Bank Parcel
Umbrella Mitigation Banking Instrument
Table 3.0 - Credit Release Schedule for Riparian Buffer Credits and Nutrient Offset Credits
Task Project Milestone
% Credit
Available for Sale
1 Instrument and BPDP Approved by DWR, Conservation Easement
Recorded*, and Financial Assurance Posted 20
2
All mitigation activities including riparian earthwork, Planting and
Installation of Monitoring Devices Completed; easement boundaries
adequately marked, and all applicable permits obtained, site visit
performed by DWR
20
3 Monitoring Financial Assurance Posted and Approval of As-Built
Report 10
4 Monitoring Report #1: Approved by the DWR** & financial
assurance renewed 10
5 Monitoring Report #2: Approved by the DWR** & financial
assurance renewed 10
6 Monitoring Report #3: Approved by the DWR** & financial
assurance renewed 10
7
Item B (I) of Section X in this Instrument has been completed and
approved by DWR 5
No remaining credits will be released until Task 7 has been satisfied, assigning the conversation
easement to an approved land trust or long-term steward.
8
Monitoring Report #4: Approved by the DWR** & financial
assurance renewed 5
9
Monitoring Report #5: Approved by the DWR** and final site visit by
DWR has been conducted 10
Total 100%
* For specification, please see Section V in this Instrument
** DWR Approval provided upon a determination that the site is meeting performance
standards contained within the approved BPDP