Loading...
HomeMy WebLinkAbout20210019 Ver 2_OBerry Road Mitigation Bank Parcel_Credit Release Request - Task 4_20230921 Wildlands Engineering, Inc. (P) 919.851.9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 September 21, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth (khogarth@wildlandseng.com, 540-907-9432) Through: Wildlands Holdings III, LLC We formally request a credit release for the O’Berry Road Mitigation Bank Parcel (2021-0019v2) for completion of Task 4 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to NCDWR for Task 4 and are pending review: Monitoring Year 1 Report. Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 10% 26,200.200 ft2 0.10 x 262,002.000 ft2 = 26,200.200 ft2 Buffer Preservation 10% 873.340 ft2 0.10 x 8,733.400 ft2 = 873.340 ft2 Buffer Enhancement NA NA Generated Nitrogen Nutrient Offset 10% 2,773.318 lbs. N 0.10 x 27,733.180 lbs. N = 2,773.318 lbs. N Delivered Nitrogen Nutrient Offset (Jordan sites only) NA NA Generated Phosphorus Nutrient Offset NA NA Delivered Phosphorus Nutrient Offset (Jordan sites only) NA NA Signature: Attachments: 1) As-Built Project Credit Table 2) UMBI approved Credit Release Schedule Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject?  (enter NO if  ephemeral or  ditch 1) Feature Type Mitigation  Activity Min‐Max  Buffer Width  (ft) Feature Name Total Area  (ft2) Total  (Creditable)  Area of Buffer  Mitigation (ft2) Initial  Credit  Ratio (x:1) % Full  Credit  Final Credit  Ratio (x:1)   Convertible  to Riparian  Buffer?   Riparian Buffer  Credits   Convertible  to Nutrient  Offset?   Delivered  Nutrient  Offset: N  (lbs)   Delivered  Nutrient  Offset: P  (lbs)  Buffer Rural Yes I / P Restoration 0‐100 O'Berry Creek, UT1 626,002 262,002 1 100% 1.00000 Yes 262,002.000 Yes 13,671.615 — Nutrient Offset Rural Yes I / P Restoration 101‐200 O'Berry Creek, UT1 313,228 1 33%No —Yes 16,344.656 — Nutrient Offset Rural No Ditch Restoration 0‐200 Ditch A, Ditch B,  Ditch C, Ditch D 218,249 1 100%No —Yes 11,388.524 — Rural No Ditch Restoration Diffuse Flow  Deductions 5,146 1 No —No —— Totals (ft2):798,625 262,002 262,002.000 41,404.795 0.000 Total Buffer (ft2):626,002 262,002 Total Nutrient Offset (ft2):531,477 N/A Total Ephemeral Area (ft2) for Credit:00 Total Eligible Ephemeral Area (ft2):87,334 0.0%Ephemeral Reaches as % TABM Enter Preservation Credits Below Total Eligible for Preservation (ft2):87,334 25.0%Preservation as % TABM Credit Type Location Subject? Feature Type Mitigation  Activity Min‐Max  Buffer Width  (ft) Feature Name  Total Area  (sf)  Total  (Creditable)  Area for Buffer  Mitigation (ft2) Initial  Credit  Ratio (x:1) % Full  Credit  Final Credit  Ratio (x:1)   Riparian  Buffer  Credits  Buffer Rural Yes I / P Preservation 0‐100 O'Berry Creek,  UT1 201,437 87,334 10 100% 10.00000 8,733.400 Buffer Rural Yes I / P Preservation 101‐200 O'Berry Creek,  UT1 54,249 10 33%— Preservation Area Subtotals (ft2):255,686 87,334 Square Feet Credits 262,002 262,002.000 0 0.000 87,334 8,733.400 349,336 270,735.400 Square Feet Credits Nitrogen:27,733.180 Phosphorus:0.000 Total Riparian Buffer: TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset:531,477 TOTAL AREA OF BUFFER MITIGATION (TABM) Mitigation Totals Restoration: Enhancement: Preservation: N/A As-Built Project Credit Table O'Berry Road Mitigation Bank Parcel Monitoring Year 0 ‐ 2023 Neuse 03020201 ‐ Outside Falls Lake 19.16394 UMBI approved Credit Release Schedule O’Berry Road Mitigation Bank Parcel Umbrella Mitigation Banking Instrument Table 3.0 - Credit Release Schedule for Riparian Buffer Credits and Nutrient Offset Credits Task Project Milestone % Credit Available for Sale 1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded*, and Financial Assurance Posted 20 2 All mitigation activities including riparian earthwork, Planting and Installation of Monitoring Devices Completed; easement boundaries adequately marked, and all applicable permits obtained, site visit performed by DWR 20 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10 4 Monitoring Report #1: Approved by the DWR** & financial assurance renewed 10 5 Monitoring Report #2: Approved by the DWR** & financial assurance renewed 10 6 Monitoring Report #3: Approved by the DWR** & financial assurance renewed 10 7 Item B (I) of Section X in this Instrument has been completed and approved by DWR 5 No remaining credits will be released until Task 7 has been satisfied, assigning the conversation easement to an approved land trust or long-term steward. 8 Monitoring Report #4: Approved by the DWR** & financial assurance renewed 5 9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10 Total 100% * For specification, please see Section V in this Instrument ** DWR Approval provided upon a determination that the site is meeting performance standards contained within the approved BPDP