HomeMy WebLinkAboutSAW-2023-01367--NWP 29 Verification--25 SEPT 23.pdf U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2023-01367 County:Wake U.S.G.S.Quad:NC-Raleigh West GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Kris Bass Engineering Connor Brown Address: 219 E.Chatham Street Cary,North Carolina 27511 Size(acres) —9 acres Nearest Town Raleigh Nearest Waterway Glen lake River Basin Neuse USGS HUC 03020201 Coordinates Latitude:35.832903 Longitude:-78.689218 Location description: The project site is south of Parklake Avenue and north of Garden Lake Drive in Raleigh,in Wake County,North Carolina. Description of projects area and activity: This verification authorizes the temporary discharge of dredged material 0.88 acre of open waters. Applicable Law(s): ©Section 404(Clean Water Act,33 USC 1344) ❑Section 10(Rivers and Harbors Act,33 USC 403) Authorization: NWP.29 Residential Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 6/29/2023, and the enclosed plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified,suspended or revoked. If,prior to the expiration date identified below,the nationwide and/or regional general permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit,activities which have commenced(i.e.,are under construction)or are under contract to commence in reliance upon the nationwide and/or regional general permit,will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration,modification or revocation,unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(LAMA),prior to beginning work you must contact the N.C.Division of Coastal Management Morehead City,NC,at(252)808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,please contact George Lyle Phillips III at(919)588-9200 or George.L.Phillips(ausace.army.mil. Corps Regulatory Official: Cj"&-L.yC�'����/ Date: 09/25/2022 Expiration Date of Verification: 3/14/2026 G The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.anny.mil/cm_apex/f?p=l 3 6:4:0 Copy furnished:Zach Thomas/NCDEQ-DWR/3800 Barrett Drive,Raleigh,North Carolina 27609 SAW-2023-01367 SPECIAL CONDITIONS a. Suitable habitat for tricolored bat(Perimyotis subflavus) may be present at the site. On September 14, 2022, the USFWS published a proposal in the Federal Register to list the tricolored bat as endangered under the Endangered Species Act (ESA). The permittee understands and agrees that all work associated with the clearing and removal of trees and removal or modification of culverts must be completed prior to the effective date of the final listing in the Federal Register. Work associated with the aforementioned activities not completed by that time must cease and the permittee must contact the Corps'(RaleighNCREG@usace.army.mil) to determine if additional coordination with the USFWS is required under Section 7 of the ESA prior to continuing work. Action ID Number: SAW-2023-01367 County: Wake Permittee: Kris Bass Engineering, Connor Brown Project Name: Glen Lake Dredging Date Verification Issued: 09/25/2022 Project Manager: George Lyle Phillips III Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: George Lyle Phillips III Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or George.L.Phillips@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date m m M U U Y W W Z Z Y � � U (n Q LlJ GLENLAKE DREDGING W � _ � � U PROJECT OVERVIEW VICINITY MAP '- TRAFFIC CONTROL AND PEDESTRIAN PLAN (TCPED) NOTES: 0 200 400 -\ / 4 / GLEN F4RE5 S AL 056429 EmbassySvites ;y ItJMAN PARK Del/ `Hilton Raleigh CrabtreeINE�-� • PRIOR TO ANY WORK THAT IMPACTS THE RIGHT-OF-WAY CLOSING ,f N41 •• ' '� Raleigh Marriott WOQDBUR '�'%�oR D. BR ` OR DETOURING OF ANY STREET, LANE, OR SIDEWALK, THE SCALE: 1 INCH = 100 FEET Crabtree Valley ESTATES iiiiiiiilil����`` 1 ` , 7° 06/29/2023 CONTRACTOR MUST APPLY FOR A PERMIT WITH RIGHT-OF-WAY ,i' / GrabtreeVa°IeyMall V• { / / I The Cheesecake Factory SERVICES. PLEASE DIRECT ANY QUESTIONS TO ^ / �+ GLEN LAUREL � / _1RE'L HILLS RIGHTOFWAYSERVICES@RALEIGHNC.GOV. "" / f--_—__ I Unc�eJuiosRaleig°' CRABTREE WOODS f #� ip • THE STREET, LANE, SIDEWALK, CLOSURE PERMIT IS REQUIRED FOR ,' ,/ ----__ ?0 � 1 �' / i ODDS Marton Marietta ANY CLOSURE ON CITY STREETS AND ALL NCDOT STREETS WITHIN ,,�, , , OMES Corporate offic RALEIGH 'S JURISDICTION . ,' I GA �ILEYHILLS 4+� r. ;, >ti, a / � I GLEN LA �;' � • A PERMIT REQUEST WITH A TCPED PLAN SHALL BE SUBMITTED TO °��" BECKANA < N � � \ � • // / I Laurel �� Q RIGHT-OF-WAY SERVICES THROUGH THE CITY OF RALEIGH PERMIT Hills Park � `pY � z AND DEVELOPMENT PORTAL. \ � COUNTRY 0 �I EST^TESTER BLENHEIM o . a // / F P1 Ar.F CLUB HILLS CD • PRIOR TO THE START OF WORK, THE CLIENT SHALL SCHEDULE A �P�� :-y`'j` GLENLAKE 0 �L �/ / PP�� �. II _YON PARK Z < PRE-CONSTRUCTION MEETING WITH THE ENGINEERING INSPECTIONS °�� PROJECT r � / /' //' CMDESE GLEN EDEN AREA �/ S / / MEREDITH MEREDITH COORDINATOR TO REVIEW THE SPECIFIC COMPONENTS OF THE O IL , WOODS TOWNES � z APPROVED PLAN, AND ENSURE ALL PERMITS ARE ISSUED. �� �� W o • ALL TCPED PLANS SHALL COMPLY WITH ALL LOCAL, STATE, AND �' `` �� UNC Health Rex Hospital 0 FEDERAL REQUIREMENTS AND STANDARDS, INCLUDING BUT NOT LIMITED TO: ,� '- > > ,r i i W W 1 . MANUAL ON UNIFORM TRAFFIC CONTROL (MUTCD) ; �' �� �� < 2. PUBLIC RIGHTS-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG) ; 3. AMERICAN DISABILITY ACT (ADA) REQUIREMENTS; ,' _� LL 4 RALEI H STREET DESIGN MANUAL (R DM) . ' , — Z > • ALL PUBLIC SIDEWALKS MUST BE ACCESSIBLE TO PEDESTRIANS WHO �� �>` _ - - - - U CD U ARE VISUALLY IMPAIRED AND/OR PEOPLE WITH MOBILITY CONCERNS. CD In EXISTING AND ALTERNATIVE PEDESTRIAN ROUTES DURING �� zIn mW CONSTRUCTION SHALL BE REQUIRED TO BE COMPLIANT WITH THE ��' y � y 11 � Iz_ PUBLIC RIGHTS OF WAY ACCESSIBILITY GUIDELINES (PROWAG) , THE /' `� ` ; > ADA STANDARDS FOR ACCESSIBLE DESIGN AND THE MANUAL ON �� _ �, z UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) . // �� Q Ln = o • ALL PERMITS MUST BE AVAILABLE AND VISIBLE ON SITE DURING THE cy Q N I �' OPERATION . m u o zLn * WN � � � U (D� co � � � � N C/ U � 0- 0 w O 11 11 Q SHEET INDEX: SHEET Cl : COVER SHEET El : NOTES z� o z 1= SHEET E2: EXISTING CONDITIONSCn LJ SHEET El EROSION AND SEDIMENTATION CONTROL PLAN w 100% PLANS � SHEET E4: IMPACTS MAP FOR PERMIT REVIEW ONLY SHEET D1 : CONSTRUCTION DETAILS CONTRACTOR : CITY OF RALEIGH-PLANS AUTHORIZED FOR CONSTRUCTION WES L EY H AS K I N S Plans for the proposed use have been reviewed for general compliance with applicable codes.This limited review,and authorization for conatruction is not to be considered to represent total wmpli_with all legal requirements for d..l.pment and construction. The property owner,design cansuhants,and contractors are each responsible for FOSTER LAKE AND POND MANAGEMENT W rompliance with all applirable City,State and federal laws.This specific authoriratien bMew is rim a permit,nor shall it be 919.634.79 53 cons[ued to permit any violation of City.State or Federal law.All Canslruction must be in accordance with all local,State, Q and Federal Rules and Regulation. Electronic Approval:This approval is being issued eleotronielly.This approval is valid only upon.the sigruiure of a City of Raleigh Revi Offimr below.The City will retain a copy of the approved plans-Any work authorsted by this approval must DATE 6/29/2023 PROJECT ENGINEER. proceed in acc ce ordan with the plans k approval inept on file with the City.This alenronic may not be edged anoe issued.Any modification to this approval ante issued will invalidate this approval. C REVISION # of ONNOR BROWN FILE NAME: KRIS BASS ENGINEERING, PLLC 704.641 .4621 City of RaleighOeveiapmentnppraval GLEN LAKE_DREDGING.DWG City of Raleigh Review Officer C 1 PROJECT NARRATIVE: EROSION CONTROL NOTES: LEGEND: THIS PROJECT INVOLVES THE CONSTRUCTION OF AN ACCESS PATH, THE ESTABLISHMENT OF TREE PROTECTION FENCING AND SILT FENCING, THE REMOVAL OF APPROXIMATELY 3,800 CUBIC YARDS OF SEDIMENT FROM INLET OF 1 ) ALL EROSION CONTROL MUST BE SET-UP AND INSPECTED PRIOR TO m 0 m GLENLAKE. TO ACCOMPLISH THE DREDGING OBJECTIVES LISTED ABOVE, THE WATER LEVEL IN THE LAKE WILL BE COMMENCEMENT OF GRADING OPERATIONS. ACCESS ROAD o 0 w LOWERED APPROXIMATELY 4 TO 5 FEET TO EXPOSE SEDIMENT IN LOCATIONS TO BE EXCAVATED. UPON REACHING 2) ALL SLOPES SHALL BE SEEDED AND STABILIZED WITH A DENSE COVERAGE OF THE DESIRED LEVEL, THE WATER WILL BE MAINTAINED AT THAT LEVEL DURING THE DURATION OF THE PROJECT. THIS GRASS. ANY EXPOSED OR BARE SLOPES SHALL BE RE-SEEDED OR PROTECTED co o LOWERED WATER LEVEL SHALL BE MAINTAINED FOR APPROXIMATELY ONE MONTH PRIOR TO EXCAVATION TO WITH EROSION CONTROL MATTING. CONSTRUCTION ENTRANCE ALLOW THE SEDIMENT TO DEWATER. LOWERING SHALL BE DONE AT A RATE OF NOT MORE THAN 1 FOOT IN A 3) ALL BACKFILL SHALL BE SUITABLE FOR PLANT GROWTH AND GENERALLY FREE OF ,����`��\ CARo''%%,, 24-HOUR PERIOD. LOWERING SHALL BE ACCOMPLISHED USING A U-SIPHON SYSTEM. THE ACCESS PATH AND TREE DEBRIS OR OTHER MATERIAL GREATER THAN 2 INCHES IN SIZE. PROTECTION FENCING WILL ENSURE SAFE ACCESS OF CONSTRUCTION EQUIPMENT TO THE PROJECT AREA AND 4) ALL ELEVATIONS AND CHANNEL DIMENSIONS SHALL BE MET WITHIN A Q�� ' PROTECTION OF UNDERGROUND UTILITIES. DURING DREDGING, SEDIMENT SHALL BE EXCAVATED AND TOLERANCE OF 0.1 ' DREDGING AREA - V � 056429 TEMPORARILY STOCKPILED IN A STABLE AREA PRIOR TO LOADING ON TO TRUCKS FOR HAULING AND OFF-SITE 5) STABILIZATION MEASURES SHALL BE IMPLEMENTED AS SOON AS POSSIBLE DISPOSAL AT AN APPROPRIATELY PERMITTED FACILITY OR LOCATION. THE SITE IS LOCATED OFF OF PARKLAKE AVE FOLLOWING COMPLETED AREAS OF CONSTRUCTION. SPECIFIC SEEDING '%,°N''' o� ''�/R i ID i i iR�`�\B \\\ IN RALEIGH, NC. THE WORK INVOLVES CONVENTIONAL DREDGING, STABILIZATION, AND ESTABLISHMENT OF REQUIREMENTS ARE PROVIDED IN THE PLANTING PLAN. LOD LOD LOD LIMITS OF DISTURBANCE 06/29/2023 GRASS. 6) PROVIDE TEMPORARY OR PERMANENT GROUNDCOVER ON ALL EXPOSED AREAS WITHIN 7 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF SF SF SF SILT FENCE GRADING. PROVIDE A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS ENGINEER'S NOTES: WITHIN 14 WORKING DAYS OR WITHIN 90 CALENDAR DAYS (WHICHEVER IS x x x TREE PROTECTION FENCE SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 1 ) THE LOCATION AND ALIGNMENT OF ALL IMPROVEMENTS SHOWN ARE APPROXIMATE. THE FINAL LOCATION 7) ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY — — — STAGING AREA AND ALIGNMENT SHALL BE DETERMINED DURING CONSTRUCTION USING BEST PROFESSIONAL JUDGMENT SEVEN (7) DAYS OR AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS c� AND APPROVED BY THE PROJECT ENGINEER. ONE-HALF (1 /2) INCH. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED EXISTING MAJ. CONTOUR Q Q0 2) MATERIALS LISTS ARE PROVIDED AS AN APPROXIMATION ONLY. CONTRACTOR SHALL INDEPENDENTLY VERIFY OR REPLACED, AS NECESSARY. c THE NUMBER AND AMOUNT OF STONE, BACKFILL, OR OTHER ITEMS NECESSARY TO PROPERLY COMPLETE THE 8) ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL EXISTING MIN. CONTOUR Q U JOB. PHASES OF THE CONSTRUCTION UNTIL THE COMPLETION OF ALL z 3) THE LATEST VERSION OF THE FOLLOWING STANDARDS APPLIES TO THESE SPECIFICATIONS: CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. zi zi zi BUFFER ZONE 1 < _ A. NCDOT "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES" DATED JANUARY 2018 ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN — w B. NCDENR "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 2013" ORDER TO CONTROL EROSION AND/OR OFF-SITE SEDIMENTATION. ALL z2 z2 z2 BUFFER ZONE 2 " Q 4) THE CONTRACTOR SHALL CALL THE "CALL BEFORE YOU DIG" TOLL FREE NUMBER TO MAKE SURE THAT ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS Z 12:� UTILITIES ARE LOCATED AND MARKED. ANY DAMAGE TO EXISTING UTILITIES IS THE SOLE RESPONSIBILITY OF THE COMPLETE AND THE SITE IS STABILIZED. SEWER EASEMENT C CONTRACTOR. 9) THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING C o 5) ANY DAMAGE RESULTING FROM ACTIONS OF THE CONTRACTOR TO STRUCTURES, SIDEWALKS, OR GROUNDS OF MUD TO OFF SITE AREAS. THE CONTRACTOR SHALL DAILY REMOVE SS SS SS SANITARY SEWER Q ON SITE WILL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR, TO A QUALITY MEETING OR MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. U EXCEEDING THEIR PREVIOUS STANDARDS. — — — — — — — — — — — — — — — — — — — — — PARCEL BOUNDARY 0 7) THE CONTRACTOR IS TO ENSURE PUBLIC SAFETY DURING ALL PHASES OF CONSTRUCTION. LLJ 8) THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ANY STOCKPILED MATERIALS DURING GENERAL NOTES: BUILDING FOOTPRINTLij CONSTRUCTION. O 9) THE CONTRACTOR IS RESPONSIBLE FOR CLEARING AND DISPOSING OF ANY MAN-MADE MATERIALS 1 ) TREES, SHRUBS, AND HEDGES: THE CONTRACTOR SHALL PROTECT ALL TREES STORM SEWER OR OTHER DEBRIS THAT LIE WITHIN THE CONSTRUCTION LIMITS, AS REQUESTED AND APPROVED BY THE AND SHRUBS OUTSIDE OF THE LIMITS OF DISTURBANCE. THE CONTRACTOR U/ PROJECT ENGINEER. IS ALSO REQUESTED TO SAVE ALL OTHER EXISTING TREES AND SHRUBS LAKE SHORELINE Z LLJ 10) THE CONTRACTOR IS RESPONSIBLE FOR LOCATING, MARKING, AND PROTECTING SEWER LINES AS WHERE POSSIBLE. TREE ROOTS EXPOSED AND/OR DAMAGED DURING LLJ NECESSARY WITHIN THE LIMITS OF DISTURBANCE OF THE PROJECT FOR THE DURATION OF CONSTRUCTION. CONSTRUCTION SHALL BE PRUNED USING EQUIPMENT SPECIFICALLY — — — — — — STOCKPILE AREA __1 O DESIGNED FOR PRUNING. 0 Z 2) GRASSED SURFACE RESTORATION: ALL EXISTING GRASSED AREAS ���1��� CD GENERAL CONSTRUCTION SEQUENCE: DISTURBED DURING CONSTRUCTION ARE TO BE SEEDED AND MULCHED PER �\, TREE z as 1 ) INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES THE SPECIFICATIONS UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR "_ AND THE CONSTRUCTION ENTRANCE AND SILT FENCING AS CALLED FOR AS DIRECTED BY THE ENGINEER. O SANITARY SEWER MANHOLE w `W ON THE PLANS. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO 3) ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH CITY OF z CD THE AREA NECESSARY TO INSTALL THE PERMITTED MEASURES. RALEIGH AND/OR NCDOT STANDARD DETAILS AND SPECIFICATIONS. zU� 2) SCHEDULE AN INITIAL SITE STORMWATER CONTROL INSPECTION FROM THE 4) ANY DISTURBANCE WITHIN THE RIGHT-OF-WAY WILL BE REQUIRED TO BE w CITY OF RALEIGH. REPLACED TO THE CITY OF RALEIGH AND/OR NCDOT STANDARDS AND = �' - 3) UPON APPROVAL OF THE INITIAL SITE STORMWATER CONTROL INSPECTION, INSPECTED. Q N I LL COMMENCE PERMITTED LAND DISTURBING ACTIVITY. 5) CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES IN m v o z o 4) PERFORM ALL EXCAVATION AND GRADING TASKS AS SHOWN ON THE PLANS. ACCORDANCE WITH THE LATEST CITY OF RALEIGH STANDARD DETAILS. w N � CO 5) SEED AND MULCH ALL DISTURBED AREAS PER THE APPROVED PLANS AND �, I,_; > � � [-- Q00� — _Q SPECIFICATIONS. SEEDING AND LIVE STAKING NOTES: N "' U Ij_ 0-) 6) ONCE GRADING IS COMPLETE AND THE SITE IS STABILIZED, REQUEST AN AS-BUILT o Li INSPECTION AND OBTAIN APPROVAL TO REMOVE TEMPORARY MEASURES. DO l . RE-SEED ALL SLOPES AND DISTURBED AREAS AS DIRECTED. MATERIAL ESTIMATES: o NOT REMOVE TEMPORARY MEASURES WITHOUT PRIOR STORMWATER INSPECTOR TEMPORARY SEEDING OF: APPROVAL. 120 LBS/ACRE RYEGRAIN - SEPTEMBER THROUGH MARCH LOD- 0.98 AC Q 7) ONCE GRADING IS COMPLETE, TEMPORARY MEASURES ARE REMOVED, SILT FENCE- 180 LF AND THE SITE IS STABILIZED, SCHEDULE A STORMWATER FINAL INSPECTION. 40 LBS/ACRE BROWNTOP MILLET-APRIL THROUGH AUGUST TREE PROTECTION FENCE- 140 LF PERMANENT TURF SEEDING (SPRING/SUMMER ONLY) OF: EXCAVATION- 3,800 CY 15 LBS/ACRE KY BLUEGRASS TEMP/PERMANENT SEEDING- 0.11 AC Cn o 5 LBS/ACRE CENTIPEDE o 25 LBS/ACRE BERMUDAGRASS (HULLED). w � w Cn 0 2. APPLY FERTILIZER (10-20-20) AT A RATE OF 500LBS/AC AND LIME AT 2000LBS/ACRE. SPREAD STRAW MULCH ON ANY DISTURBED AREAS AT A RATE OF 2 TONS /ACRE. 100% PLANS SOIL PREPARATION REQUIREMENTS: ANCHOR STRAW BY TACKING WITH BIODEGRADABLE NETTING OR A MULCH FOR PERMIT ALL DISTURBED AREAS SHALL BE PREPARED PRIOR TO PLANTING BY DISC OR SPRING-TOOTH ANCHORING TOOL. REVIEW ONLY CHISEL PLOW TO MINIMUM DEPTH OF 12 INCHES. MULTIPLE PASSES SHALL BE MADE ACROSS CITY OF RALEIGH -PLANS AUTHORIZED FOR CONSTRUCTION Li PLANTING AREAS WITH THE IMPLEMENT AND THE FINAL PASS SHALL FOLLOW TOPOGRAPHIC 3. COVER ALL SLOPES 3(H): 1 (V) AND GREATER WITH EROSION CONTROL MATTING Plans for the proposed use have been reviewed for general compliance with applicable codes_This limited review,and o CONTOURS. PRIOR TO ALL SEEDING, PLANTING, AND STABILIZATION, THE PLANTING OVER STRAW AND SECURE WITH BIODEGRADABLE STAKING (DETAIL 5/Dl ). authorization for construction is not to be considered to represent total compliance with all legal requirements for development and construction. The property owner, design consultants, and contractors are each responsible for SURFACE SHALL BE ROUGHENED MECHANICALLY SUCH THAT PLACED SEED AND FERTILIZER MULCHING SHALL BE PLACED UNDERNEATH COIR MATTING AT A RATE OF 2 comiliancewith all applicable City,State and Federal laws.This specific authorization below is not a permit.norshallitbe DATE 6/29/2023 construed to permit any violation of City,State or Federal Law.All Construction must be in accordance with all Local,State, WILL NOT WASH D O W N S L O P E. FOLLOWING SOIL PREPARATION, PLANT AND STABILIZE TONS/ACRE. and Federal Rules and Regulations. This a pproval of th is electronic document is onhr valid if the document has not been REVISION # 01 SLOPES ACCORDING TO THE PLANTING PLAN AND TECHNICAL SPECIFICATIONS. modified and the digital signature below is valid: FILE NAME: AREA FOR RESEEDING: 0.11 AC GLEN LAKE_DREDGING.DWG Clty of Ralleigh Development Approval El / / U U m LLJ\ / Z Lt_I W _ 1 — 9 I — — — — _ / 3/p �SEAL / O 32p - - - - - - - - - - - - - - - - - - - - - - - - - - - / `L°' S \ _ 056429 II SS / / \ G) 300 06/29/2023 \ N s P ARKLAKE AVE CURB DROP INLET o \ co SS N _ _ _ m — — — — — — - - - - - - - - - `L CID 6 30" RCP&FES 310 60" RCP INLET \ N Q N 310 / \ J U SS \ i� a_ _ i . . CD 300 300 w \ Ss / � / ^ J SS INV OUT-285. 14' v J " River Birch ss U/ �� � O RIP RAP SCALE , S MINOR CONTOUR, TYP N W o Q 3p0 Brad fo 4SS S s U II O �<�' ` SS / N � OJ O °o 0 290 �LJ U � w Zgo SS INV I N-283.84' / o -) / U z � o j z � 0 / �U C/� DREDGING PROJECT / UU X LIMITS OF DISTURBANCE / °o CD LAKE RISER z a mW It w W O r / 0 72" RCP / z ~" / w 0 / U� Lo 0 N / m c� Nz U -Y to 290 % U w °� Cni rn LJ C) SANITARY SEWER AND N (n EASEMENT, TYP > MAJOR CONTOUR, TYP / �� I °o Q LAKE OUTLET / 0 I-OD o /� 290 Cf) o z � o a- N BUILDING FOOTPRINT, TYP 300 / > wC/� 3pp � SS � SS N 300 �__--- SS / 100% PLANS / FOR PERMIT REVIEW ONLY It ® I i S SS / SS CIITY OF RALEIGH-PLANS AUTHORIZED FOR CONSTRUCTION LLJ Plans for the proposed use have been reviewed for general compliance with applicable ondim,This limited review,and. SS authorization for construction is not to be considered to represent total compliance with all legal requirements for development and construction. The property owner, design consultants, and contractors are each responsible for compliance with all applirahlp City,State and Federal laws.This specific authorization below is not a permit,nor shall it he DATE 6/29/2023 0 60 120 construed to permit any violation of City,State or Federal Law.All Construction must be in accordance with all Local,State, p / / and Federal Rules and Regulations. This a pproval of this electronic document is only valid if the document has not been R EVI S I O N Feet / / modified and the digitalsgnatum below isvalid, FILE NAME: GLENLAKE_DREDGING.DWG SCALE: 1 INCH = 30 FEET — I / City of Raleigh Development Approval E 2 I �\ - - _ _ _ _ _ _ — — — — — — — — — — — — — — — — SS , NOTE: ACCESS ROAD IS TO BE BUILT UP FROM EXISTING m GRADE T PROVIDE A MORE SHALLOW SLOPE FOR � G O O O S O S O O .. Z Z Y LLJ MACHINERY TO SAFELY ACCESS THE LAKE, AND TOPPED co Q w — � TRUCKS ENTERING HIGHWAY SIGN PARKLAKEAV WITH ABC STONE. THIS ACCESS IS TO REMAIN PLACED 150-250 FEET AHEAD OF FOLLOWING DREDGING ACTIVITIES FOR FUTURE ��NOARo CONSTRUCTION ENTRANCE ° DREDGING ACCESS. ALL STONE FROM THE °� ss' CONSTRUCTION ENTRANCE AND ACCESS ROAD WILL BE ' ' ' _ SEAL 056429 0+00 W1111 REMOVED, AND ALL AREAS STABILIZED AT THE END OF � E....CONSTRUCTION ENTRANCE /''' ���lflllllll���18 E , ,yi!:::: CONSTRUCTION . THIS WILL RESULT IN 2.3-6.4 FT OF(SEE DETAIL SW-20. 1 O/D1 ) - - - 06/29/2023 - - - — PERMANENT ADDITIONAL COVER OVER THE SEWER - - - - - - - - - - - - - - - - EASEMENT. SS � SS ACCESS ROAD WITH FILL SIDE j SS s— ss SLOPES- CAP WITH ABC STONE / / — '' (SEE DETAIL 4/Dl ) SS 300 Z Q Cs 0 TREE PROTECTION FENCE, TYP = � SS / Q z 7" River Birch(SEE DETAIL TPP-01 /D1 ) I x SS / Q = �� . . CD J i � Q SS SS i 0STAGING AREA " _ Q,yl / SS T 30� 4 Bradi`� W z . _ ss ��d� 3855 ak W 0 1 Willow a +00 SS U / I of Ell / 290 0 0 W i SILT FENCE Zgo D SEE DETAIL SW-20.01 /D1 / Q z �( ) 1+26 O STOCKPILE AREA 0 WO 0::� O LO D= 0.98 AC U W U � z w `W CD DREDGING AREA= 0.88 AC z U� LLI 3,800 CY ESTIMATED REMOVAL Q � o U� r` / Q = N � Ln N U U � z �LLJ � � �U)U/ � � �� w � � "C N c U 0 0- o j 0 O � SS a_ - SS Q 0 N z N zo 0 C > U w Cr) � w N to 100% PLANS FOR PERMIT REVIEW ONLY CITY OF RALEIGli-PLANS AUTHORIZED FORCONSTRUC710N W \— Q Plans for the proposed use have been reviewed For general compliance oath applicable codes_This limited review,and � _- authorization for construction is not to be considered to represent total compliance with all legal requirements for 9� O development and construction. The property owner, design consultants, and contractors are each responsible for 0 40 80 compliance with all applicable City,State and Federal laws.This specific authorization below is not a permit,nor shall it he DATE 6/29/2023 construed to permit any violation of City,State or Federal Law.All Construction must be in accordance with all Local,State, Feet and Federal Rules and Regulations. This approval of this electronic document is only valid if the document has not been REVISION 01 modified and the digital signature below is valid: FI LE NAM E: � GLEN LAKE_DREDGING.DWG SCALE: lINCH = 20 FEET City of Raleigh Development Approval �� _ - - - - - - NOTE: ACCESS ROAD IS TO BE BUILT UP FROM EXISTING GRADE TO PROVIDE A MORE SS , — SHALLOW SLOPE FOR MACHINERY TO SAFELY ACCESS THE LAKE FOR ROUTINE — DREDGING. THIS ACCESS ROAD WILL BE EARTHEN, AND STABILIZED WITH GRASS AND m �i SS CRITICAL ROOT ZONE, TYP EROSION MATTING FOLLOWING CONSTRUCTION . Ld LLJ Z Y co Q W w PARKLAKETHIS PERMANENT BUFFER IMPACT IS ALLOWABLE UPON AUTHORIZATION UNDER NEUSE S ,,,,,,IIIIIIII,,,,, BUFFER RULE ,•�`��HcaRo� 18 ELM — 18" ELM ° oFES o CRZ IMPACTED: 22% / CRZ IMPACTED: 11 % SEAL (SS) VEHICLE ACCESS ROADS AND BOAT RAMPS (EXCLUDING - 056429 = PARKIN AREA LEADING T SURFACE WATER DOCKS, G S) G O SU C F � 18 18 OAK E y j AND OTHER WATER DEPENDENT ACTIVITIES: p. BR� ` / ,�II�, I � nl�� " CRZ IMPACTED: 28% � =� <o '"'�° 1 E� FISHING PIERS,— �- = — - (i) SINGLE VEHICULAR ACCESS ROAD AND BOAT RAMP TO THE SURFACE WATER 06/29/2023 \ \ — RIPARIAN ZONE 2 BUT NOT CROSSING THE SURFACE WATER THAT ARE RESTRICTED TO THE MINIMUM WIDTH PRACTICABLE NOT TO EXCEED 15 FEET WIDE _ 7" RIVER BIRCH PERMANENT ZONE 2 BUFFER IMPACTS , r, CRZ IMPACTED: Oho ss - / / — 55 Icy 300 Z 2 300 Q Q0 �Z2 55 / ZZ � N I r "I' 4 BRADFORD PEAR _ / 55 >�z2 -Z2 Q � ti� CRZ IMPACTED: 0% Z2 2 . ..i��s� �i" River Birch \ � 5 — Z2� Z2 z2 ^ RIPARIAN ZONE 1 Z� �'Z1 — 0 38" OAK Z�� Z1 � — CD 2 Z Z1 71 2 2/ 1 Z1 ZI ti , 55 CRZ IMPACTED: 5� 4" Bradt` /d e' yI 3 ea\°��i'' � � 10—,11112II WILLOW OAK _ 7 ��� 3855 ak / �- Q CRZ IMPACTED: 15% U PERMANENT ZONE 1 BUFFER IMPACTS - TEMPORARY ZONE 1 BUFFER IMPACTS 0 oo Q v M P A C TS TABLE / _ �� LAKE SHORELINE U ZONE 1 ZONE 2 OPEN WATER U TEMPORARY 854 SF 0 SE 38, 235 SE / IMPACTS - a s PERMANENT 569 SF 672 SF 0 SF / 'n / OPEN WATER IMPACTS LLI a: IMPACTS / z / LLJ Q z � OPEN WATER IMPACTS / � Ln 0 ° Q N I Ln In M LLJ � ZONE 1 TEMPORARYRIPARIAN BUFFER IMPACTS / / o w ZONE 2 PERMANENT RIPARIAN BUFFER IMPACTS o / / o > � Cn w o/ / 0 ZONE 2 RIPARIAN BUFFER IMPACTS / / / / / / 100% PLANS R PERMIT REVIEW ONLY CITY OF RALEIGH-PLANS AUTHORIZED FOR CONSTRUCTION Li O L00 Plans for the proposed use have been reviewed For general compliance with applicable codes.This limited review,and — authorizatian for construction is not to be considered to represent total compliance with all legal requirements for Q development and constru€tion. The property owner, design consultants, and cortracmrs are each responsible For 0 40 80 compliance with all applicable City,State and Federal laws.This specific authorization below is nut a permit,nor shall it be DATE 6/29/2023 construed to permit any violation of City,State or Federal Law.All Construction must be in accordance with all Local,State, Feet and federal Rules and Regulations. This approval of this electronic document is only valid if the document has not been REVISION 01 modified and the digital signature below isvalid: FILE NAME: SCALE: lINCH — 20 FEET GLENLAKE_DREDGING.DWG City of Raleigh Development Approval E 4 8'MAX. m m m VARIABLE AS DIRECTED BY THE ENGINEER C) U STEEL POST Q STEEL POST Ld Z W Z Y PLASTIC OR 0 ?� 0 WARNING SIGN WIRE TIES Cl) Q LL1 LLI _ WOVEN WIRE FABRIC Q Q () 0 20'MIN. METAL WIRE FENCE MIN.10 GA. " AND SUFFICIENT TO KEEP N 5" \\��\ `N R0 WARNING SIGN TREE PROTECTION AREA v FILL SLOPE \ \\\\\\II C All///// i LINE WIRES \ 00o SEDIMENT ON SITE DO NOT ENTER MIN. 12-1/2 GA. MIN \ O ....... •., ,�9 �i/ ORANGE,UV RESISTANT 0 000000 0 0 o 0 000 0 000 00 0 00 o HIGH-TENSILE STRENGTH 00 opp0o 00 o0ogo o0 oo00 00 0og o ( ) 00 00 0 0 00 0 0 oQ� 0 g oo INTERMEDIATE �Q 0 0 $000 00 00 00 0 0o GRADE POLY BARRICADE FABRIC TYPICAL WIRES SEAL _ 00� �� 0 ��� „- 056429 00 00000000 000$o NOTES: C? coM -II =III=IIPI' - o 008 00 0 0 1.THIS DETAIL APPLIES ONLY TO ENTRANCES MIN =II -111-i' EXISTING o000000 0 2"_3"STONE TO BE USED moo OF INDIVIDUAL SINGLE FAMILY RESIDENTIAL UNITS ROADWAY o0�00000p (SURGE STONE OR o0 12' GRADE i4„� � t 0000,000 0 o RAILROAD BALAST) o0 0 2. SILT FENCE SHOULD BE INSTALLED TO ENSURE / MIN SILT FENCE GEOTEXTILE FABRIC 0000 000 0 0 000000 CONSTRUCTION ENTRANCE IS USED. - 000000 000000 00 000000 - - - - - - - - - - - - - - - 000 0 0 00 0 000 0 0 0000 0o i i i i -III- III- i i-i i i-i i i i i i-i i i-i i i-i i i-i i i-i i i-i i i-i i -iii-i i i-i i i-i p ///NOR •D.• "`" \\X\ 000000000 00 0000000O00000000p0 - 0 0 00 000 0 0 0 0 0 0000 0g 0 0 00 00 0000 I' MAINTENANCE: CLEAN OUT AT 50/p CAPACITY 0 oL III,- _ = LIFE OF FENCING: 6-9 MONTHS SIDE VIEW 06/29/2023 NII'- - ORANGE,UV RESISTANT PLAN 1� - - HIGH-TENSILE STRENGTH SILT FENCE(SEE NOTE 2) = - POLY BARRICADE FABRIC(TYPICAL) - 8'MAX. VARIABLE AS DIRECTED BY THE ENGINEER OR SIDE VIEW FRONT VIEW LANOVIDE H GUAGEIINBO WARNINGPLASTIC WIRE TIES ENGLISH AND SPANISH, AS SHOWN EXISTING ROADWAY NEW CONSTRUCTION NOTE: FOR TREE PROTECTION ONLY / 40" NOTES: MIN.10 GA. MIN.12-1/2 GA. > N RAILROAD BALLAST 1. TREE PROTECTION FENCING MUST BE INSTALLED AT A MINIMUM RADIUS OF THE CRITICAL ROOT ZONE TREE PROTECTION AREA LINE WIRES INTERMEDIATE Q QD (SEE DETAIL TPP-02 FOR EXAMPLES) WIRES 2. THE TREE PROTECTION FENCING MUST REMAIN IN PLACE FOR THE DURATION OF THE PROJECT 0 0000000 0000000000 0 00000000000o SILT FENCE FABRIC LLI 0 0 0 0 0 000 0 0 00 0 00 o0g o 0000 0o0po III-I I-I 6"MIN. UNLESS OTHERWISE APPROVED BY URBAN FORESTRY STAFF. DO NOT ENTER N 00 0 0 0 0 0000000000 00 �o 00 >00 0 =ll=III- INSTALLED TO SECOND Y 3. APPROVED IMPACT PROTECTION DEVICES MUST BE REMOVED AFTER CONSTRUCTION WHEN APPLICABLE. co WIRE FROM TOP GRADE -i I I =I = I=III- I = Q U -III-III-� 'I 11= I-I - I=I 4. SIGNS SHALL BE PLACED AT 50'MAXIMUM INTERVALS.PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' I-III-III - I I-III= ON CENTER FOR THE REMAINDER ZONA DE PROTECCON _ _ _ _ _ _ _ _ _ _ _ _ _ III III III III I 5. FOR TREE PROTECTION AREAS LESS THAN 200'IN PERIMETER,PROVIDE NO LESS THAN ONE SIGN PER PROTECTED AREA.6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. PARA ARBOLES-NO ENTRE = Q = CITY OF RALEIGH 7. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH BASED ON ACTUAL FIELD CONDITIONS. FRONT VIEW � /^ 8. SIGNS ARE TO BE MADE OF DURABLE,WEATHERPROOF MATERIAL WITH LETTERS A MINIMUM OF 2 1/2"HIGH,CLEARLY LEGIBLE _ - e o v CD STANDARD DETAIL CROSS SECTION AND SPACED AS SHOWN. WARNING SIGN DETAIL _ III W REVISIONS DAT2812020 NOT TO SCALE CITY OF RALEIGH CITY OF RALEIGH " ail III Q STANDARD DETAIL STANDARD DETAIL NOTES: Z Q RESIDENTIAL CONSTRUCTION 1.FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. ENTRANCE REVISIONS DATE.812020 NOT TO SCALE CONTACT INFORMATION: REVISIONS DATE 812020 NOT TO SCALE 2.END OF SILT FENCE NEEDS TO BE TURNED UPHILL. CITY OF RALEIGH PARKS,RECREATION AND � W CULTURAL RESOURCES DEPARTMENT 3.SEE NC DEQ SEDIMENT DESIGN MANUAL FOR CONSTRUCTION STANDARD TREE STANDARD TEMPORARY SPECIFICATIONS,WHERE PRACTICE APPLIES AND PLANNING z SW-20.10 PROTECTION DETAIL URBAN FORESTER: CONSIDERATIONS. TREES RALEIGHNC.GOV (SEDIMENT/SILT)FENCE W O 4.SILT FENCE SHOULD NOT BE USED ALONE BELOW GRADED � TPP-01 WWW.RALEIGHNC.GOV SW-20.01 SLOPES GREATER THAN 10'IN HEIGHT. U 0 o -1 +00 0+00 1 +00 2+00 3+00 EROSION CONTROL MATTING SHALL BE ~ -0+50 0+50 1 +50 2+50 2" THE WOOD STAKE SHALL BE THE NORTH AMERICAN W w NOTE: FILL MATERIAL USED TO CREATE THE ACCESS ROAD SHALL BE PLACED IN 12 INCH DEEP TRENCH, STAKED, GREEN ECO-STAKE OR APPROVED EQUAL WITH THE U D 320 320 FREE OF DEBRIS OR STONES GREATER THAN 2" DIAMETER. FILL BACKFILLED AND COMPACTED FOLLOWING DIMENSIONS: O TOP OF STREAMBANK LEG LENGTH 11.00 IN 27.94 CM MATERIAL SHALL BE SUFFICIENTLY COMPACTED TO ENSURE SAFE ( ) 1/ a_ DRIVING CONDITIONS. THE TOP OF THE ACCESS ROAD WILL BE WOOD STAKE HEAD WIDTH 1.25 IN (3.18 CM) CAPPED WITH ABC STONE, WHICH WILL BE REMOVED AFTER TOE OF SLOPE 2' HEAD THICKNESS 0.40 IN (1.02 CM) /� 315 315 CONSTRUCTION. EROSION CONTROL MATTING SHALL BE LEG WIDTH 0.60 IN (1.52 CM) (TAPERED TO POINT) Z V J PLACED IN 12 INCH DEEP TRENCH, STAKED, LEG THICKNESS 0.40 IN (1.02 CM) W Z BACKFILLED AND COMPACTED BOTTOM OF CHANNEL -V TOTAL LENGTH 12.00 IN (30.48 CM) -1 O 310 310 0+50 2' TRENCH7 CDU SECTION VIEW STAKE WITH CD NAIL TYPICAL TRENCH STAKE a� Offset=-7.50 Offset=7.50 \-2'TRENCH z mW 305 305 Elev = 308.00 10 Elev - 308.00 STAKE WITH EROSION CONTROL MATTING NOTES tn. NAIL 1. BANKS SHALL BE SEEDED (PERMANENT&TEMPORARY) PRIOR TO PLACEMENT OF LLJ e M 309 309 MATTING. LLJ ° 308 308 2. WOODEN STAKES SHALL BE PLACED IN A DIAMOND SHAPE PATTERN PER THE PLAN z 307 307 CROSS-SECTION VIEW. Q 300 300 0306 3063. TRENCH STAKES AND WOOD STAKES SHALL BE PLACED A MAXIMUM DISTANCE APART z U) }305 3055 OF 3'. _ >304 "s 304 4. EROSION CONTROL MATTING (ECM) SHOULD BE USED TO AID PERMANENT VEGETATED W �a) o TRENCHNO w303 T' 303 STABILIZATION OF SLOPES 2:1 OR AREAS SPECIFIED IN THE PLANS. Q LO O 302 302 TRENCH U� = r-- = N • TOP OF BANK • • • • • • • • TOP OF BANK 5. RCM SHOULD BE USED WHEN MULCH CANNOT BE ADEQUATELY TACKED AND WHERE U/ Q N I L 295 295 300 300 IMMEDIATE GROUND COVER IS REQUIRED TO PREVENT EROSION DAMAGE. Q = a_ 299 299 6. 6" MINIMUM OVERLAP IN THE HORIZONTAL m U In -20-10 0 10 20 • • • • • • • • WOOD STAKE LLJ N Offset • • • • • • • EROSION CONTROL MATTING MAINTENANCE NOTES U� Cn 1. INSPECT ECM AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) - O-) LLJ � 0-) C) 290 290 • • • • • • • • RAINFALL EVENT. REPAIR IMMEDIATELY. 1-- Q - -0 TOE OF SLOPE • • • • • • • • 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT N U) U L1_ 0-)N E • • • • • • • • OCCUR BENEATH THE ECM. Cn 3. ANY AREAS OF THE ECM THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE w 285 285 • • • • • • • • GROUND SHALL BE REPAIRED AND STAPLED. o 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL a_ EROSION CONTROL BE FIXED AND THE ERODED AREA PROTECTED. Q MATTING TO BE EXTENDED 5. MONITOR AND REPAIR THE ECM AS NECESSARY UNTIL GROUND COVER IS TO TRENCH AT TOE OF SLOPE ESTABLISHED. 280 280 -1 +00 -0+50 0+00 0+50 1 +00 1 +50 2+00 2+50 3+00 rT ACCESS ROAD PLAN VIEW D 1 NOT TO SCALE Station Cf) z Z � o � C/) � W U LLJ Q 5 EROSION CONTROL MATTING D 1 NOT TO SCALE CITY OF RALEIGH PLANS AUTHORIZED FOR CONSTRUCTION Ld Plans for the proposed use have been reviewed for general compliance with applicable codes.This limited review,and. authorization for construction is not to be considered to represent total compliance with all legal requirements for development and construction. The property owner, design consultants, and contractors are each responsible for compliance with all applirahlp City,State and Federal laws.This specific authorization below is not a permit,nor shall it he DATE 6/29/2023 construed to permit any violation of City,State or Federal Law.All Construction must be in accordance with all Local,State, and Federal Rules and Regulations. This a pprcval of this electronic document is only valid if the document has not been REVISION 01 100% PLANS modified and the d`gFtalsgnatum below isvalid, FILE NAME: FOR PERMIT GLENLAKE_DREDGING.DWG REVIEW ONLY City ofPaleigh Development Approval DI