HomeMy WebLinkAboutNCC232892_ESC Approval Submitted (2)_20230926 _=F;;E STATE>,,
ROY COOPER 'u 4 s 01
Governor 4
ELIZABETH S.BISER ,z.�� a?a
Secretary .'far owwv oEw
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
September 8, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
D.R. Horton, Inc.
ATTN: Ms. Debrah Green
8025 Arrowridge Blvd., Suite 200
Asheville, NC 28723
RE: Project Name: VALLEYWOOD FARMS SUBDIVISION PHASE-1
Acres Approved: 12.6
Project ID: HAYWO-2024-002
County: Haywood
City: Waynesville
Address: Sunnyside Rd.
River Basin: French Broad
Stream Classification: UT to Raccoon Creek- Class B
Submitted By: Jason Smith, PE
Date Received by LQS:August 9, 2023
Plan Type: Residential
Dear Ms. Green,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications.The Modifications Required for Approval are listed on the attached page.This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is processed,you will receive the COC via email. As the Financially Responsible
Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program
staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
DE North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
--;) Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa,North Carolina 28778
NORTH CAROLINA
oePanmemmen.ronromaiumr\ r 828.296.4500
Letter of Approval with Modifications
D.R. Horton, Inc.
ATTN: Ms. Debrah Green
September 8, 2023
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Fred Walker, PE
Engineer III
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications Required for Approval
ec: Jason Smith, PE (jmsmith@jmsmithengineering.com)
Jason Via (via.jason@outlook.com)
cc: Regional Office file
Letter of Approval with Modifications
D.R. Horton, Inc.
ATTN: Ms. Debrah Green
September 8, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: VALLEYWOOD FARMS SUBDIVISION - PHASE I
Project ID: HAYWO-2024-004
County: Haywood
1. Provide a new Financial Responsibility/Ownership form for HAYWO-2022-005
Queen Subdivision with the disturbed acreage revised to not include the acreage
proposed for Phase-1 of this project. Also provide revised plan sets for HAYWO-
2022-005 to show the new LOD that does not incorporate this project. {G.S. 113A-
54.1.(a)}
2. Revise construction sequence to instruct contractor to remove offsite tracked
sediment from the subdivision entrance at the end of each workday. {15A NCAC
04B .0106(a)(2)}