HomeMy WebLinkAboutNCG140043_Monitoring per Order of Consent_20230919 WILLIAMS MULLEN
fii
Ethan R.Ware
Direct Dials 803.567.4610 �F LJ2f
eware@williamsmullen.com ''EMLR-
Storpwafer Program
September 19, 2023
VIA F.-:MAIL & U.S. MAIL
Mark Robertson
Water Enforcement Branch
Enforcement and Compliance Assurance Division
United States Environmental Protection Agency, Region 4
61 Forsyth Street, S.W.
Atlanta,Georgia 30303-8960
Robertson Mark(aleea.aov
Danny Smith
Mike Lawyer
Supervisor, Stormwater Program
Division of Energy, Minerals, and Land Resources
North Carolina Department of Environmental Quality
1612 Mail Service Center
Raleigh,North Carolina 27699-1612
Dannv.SmithO.ncdenr.gov
Mike.LawverAdeq_nc.gov
Re: Necessary Quarterly Monitoring yao-r 3
Concrete Supply Company, LLC, South Plant
Administrative Order on Consent, Docket No. CWA-04-2022-0310
Charlotte, North Carolina
Dear Mr. Robertson and Mr. Lawyer:
Please find enclosed a copy of the quarterly monitoring at permitted outfalls of Concrete
Supply Company, LLC,South Plant, in accordance with Part 111. Par. 35.a of the above-referenced
Administrative Order on Consent("Order"). Monitoring occurred unless there was no qualifying
rain event causing a discharge of storm water during this time,as evidenced by rain gauge readings.
Feel free to call if there are any questions.
Sincerely,
d0 A41-b1',a*Q-
ERW/ct
Enclosures Ethan R. Ware
1230 Main Street,Suite 330,Columbia,SC 29201 1 P.O. Box 8116 Columbia,SC 29202
T 803.567,4600 r 803.567 4601 1 williamsmullen.com I A Professional Corporation
Concrete Supply Co LLC
Certification
I certify under penalty of law that this document and all attachments were
prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel property gather and evaluate the
information submitted. Based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
Signature: JL 44� Tel: (704) 372-2930
Name: Johnie Alexander Date: r YI.2'3
Title: Environmental Manager
• itY.
STORMWATER POLLUTION PREVENTION PLAN
QUARTERLY- GOOD HIOUSKEEPING/PM/BMP INSPECTION
PLANT LOCA IcaN:-y 1e DATEtTIME.Ti ,/.)3
WEATHER: ec�
(Inspection frequency: MUST be performed QUARTERLY who aeili tive)
f
NAME: 1 r e tLI-S SIGNATURE:
AREAS TO CHECK: Raw material storage areas with water sprinideripmistels.Truck rinse/wash and drum
washout areas,Truck wash chemicals and Admix tanks,Oil tank/sheds product storage,Catch basins and pipes.
Outfalls.Yard for spillage/debris.
Baseline BMPS Inspection:Good House Keeping,Equipment,Preventive Maintenance/Inspections,Spill Control
Kits Inspection, Employee Training lease use additional sheets if necessa
Good Housekeeping/PM Inspection Checidist Romarks what Action is Needed
(clea nuphepair/replace/n one)
Is trash bin lid dosed?&Is the Lid In working condition? YES NO
Is trash removed from the site on a timely basis? YES NO
Is the site swept'As Needed Basis"at a minimum Quarterly? YES NO
Is there any debris on the yard? YES NO
Are outside areas kept in a neat and orderly condition? YE NO
Is the maintenance shop orderly for the equipment,materials and
tanks t drums//totes? YES NO
is there an evidence of dripstleaks from Trucks/Equipment/
Tanks I Drums/Totes? YES NO
Fines scraped uptremoved from equipment areas? YES NO
Are the secondary containments in good conditions with NO leaks/
Cracks/settlement? YES NO
Is the secondary containment discharge pipe dosed and locked? YES No
Are traffic areas free from equipment,materials,and other objects? YES NO
Are ehemicalsfoilstfuels stored in proper containers? YES NO
Are any storage containers leaking or deteriorating with rust? YES
Are stoneisand areas kept neat and orderly manner? YE NO
Do you see any leaks from the baghouses? YES No
Are admix tanks in good condition and not leaking? YES NO
Are Admix tanks located inside a secondary containment? YES NO
Are sediment traps/stone darns in good condition YES NO
Are ditches,pipes,swales and catch basins in good condition? YES NO
Is there a vegetation growth in the ponds? YES NO ---
Are ponds cleaned regularly for accumulated sediment? YES NO
---------------
Are washwmter recycling basins are cleaned for accumulated
sediment? YES NO
is the facility required to do BMP feasibility(technical and
economic)study? YES No
Do you hear any unusual noise in the equipment? YES !t0
Page 112
QUARTERLY — GOOD HOUSKEEPING/PM/BMP INSPECTION
Good Housekeeping/PM Inspection Checklist Remarks what Action is Needed
(Satisfactory) (cleanup/repair/replace/none)
Are washwater recycling basins pumps working property? YES NO
Check effects of return concrete and slurry drying areas on the
ouffall? ES NO
Are equipment(pH and other)in washwater recycling basins YES NO
working properly.
Are effective cleanup procedures used for sprlled materials? YES NO
Are spill control kits in good condition with all the required NO
materials?
Are there any unauthorized discharges from the facility? YES NO
Is process water from truck washing,drum cleaning going to
outfalls? YES NO
Are there any signs of erosion on slopes,ponds,or earthen YES NO berms.
Should any new BMPs be implemented to protect stormwater_qL NO
ua
Have all new employees received Good Housekeeping Training? RYIE9NO
Did you provide at a minimum annual Stormwater Training to all NO
employees that could affect the stormwater quality
Check for any changes in the Plant operation that could affect YES NO
SWPP Plan Update?
Check pH readings from lab report to the pH at process water pits YE NO
Check if any other area not mentioned above needs attention YES NO
BMP Inspection Checklist Remarks what Action is Needad
(Satisfactory) (cleanup/repairfreplacelnone)
Are oil pumps in working order with no leaks? YES NO
Are dust collectors are working property? NO
Are compressor bleed is contained? YES NO
Are all secondary containment dikeshvalls in good condition? YES NO
Are all stone and sand barriers orderly? YES NO
Is sediment in wash pits orderly and controlled? YE NO
Are nprap/hay bales/berms working properly? -- - YES No
Is there a site erosion? fro
Is sedi rent from the return concrete storage areas contained? YES NO
Are there any leaky equipment/vehicles on the property? YES O
Is SWPP Plan/Site Map update Necessary? YES NO
Additional Remarks/Recommendations: �]
rd
Plan Manager Signature: -- - Date: — .
NOTES:Use the additional s commendations section to descnMa Calihmencies in Housekeeping
Measures.and Preventive Maintenance. Use other side if additional space is needed.
Page 2/2
C11 -
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guirhater oil ftllleg jut this lorarr please ri.rrt hops://dcq.nc.gowabrntudi�dsionvrncrgy-mineral-Iand-trosourccs:
npdesstomnvatcr-gps
Permit No.: NICI ! I 1 i ! / / or Certificate orCovcragc : NICIG!
Facility Name: -O f
County: ys , Phone No.
Inspector; _ ti
Date of Inspection: _Z2 :1
Time of Inspection:
Total Event Precipitation(inches):
All permits require qualitative monitoring to be performed during a"inensurable stone event." —�
A 'measurable storm event"is a storm event that results in an actual discharge from the penuiticd site
! otitfall. The previous measurable storm event must have been at lens(72 hours prior. The 72-hour storm
interval does not apply if the penllittec is able to document that shorter interval is representative for
local storm events during the sampling period,and the pennittee obtains approval from the local DEIv)LR
ffic f
Regional office.
By this signature. )ccrtily that this report is accurate and complete to the best of my knowledge:
(Signature,of Penmttee at sl ec) a=gn �a
eSUM
$ z9—�
3ism
1. Outfall Description: 3
Outfall No. � Structure(pipe.ditch,etc.):
Receiving Stream: —1—
Describe the industrial activities that occur within the outlall drainage area:
ggoo�
=0 10
�o
u v
Pages I or2
$LPU-_q_,L,nt mndrticJ tit.n VLaI K
Dame 'I rf O
2.
Color: Describe the color of tltc dischar-Ic usin basic colors(red. brown.blue,etc.)and tint
(light,medium,dark)us descriptors:
D�
3. Odor: Describe any distinct odors that the discharge ntav have(i.e..smell:strongly of oil.weak
chlorine odor.etc.):
4. Clarity: Clumse the number which hest describes Elie clarity of the discharge, where I is clear
and 5 is very cloudy:
D2 3 4 5
S. Floating Solids: Choose the number which best describe%the amount of floating solids in the
starmw:aer discharge.where I is no solids and 5 is the surface covered with Iloating solids:
'_ 3 4 5
6. Suspended Solids: Choose the number which best describes the antount ofsuspended solids in
the stormwater discharge.where I is nosolids and 5 is extremely muddy:
J 1/ ? 3 4 5
7. Is there any foam in the st�oorrmw•ater discharge? o Yes 90-
8. Is there an oil sheen in the stomnvnier discharge? oYes No.
9. Is there evidence of erosion or deposition at the outf Ell? o Yes P'do. on-
10.
m
Other Obvious Indicators of Stnrnnvrtcr Pollution:
List and describe R r
3�
I�
M
0
�QON
m'GGVYY�
�s
W
Note; Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be
indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 o1*2
modified m O VIots
a49 Springbrook Rd,Charlotte, NC 26217
Waypoont,
ANALYTICAL Main 704.529.6364
www.waypolntanalytical.com
9/15/2023
Concrete Supply Company
Johnnie Alexander
3823 Raleigh Street
Charlotte,NC,28206
Ref: Analytical Testing
Lab Report Number.23-25MO52
Client Project Description:South Plant Facility
Dear Johnnie Alexander.
Waypoint Analytical,LLC(Charlotte)received sample(s)on 9f7/2023 for the analyses presented in the
following report.
The above referenced project has been analyzed per your instructions. The analyses were performed in
accordance with the applicable analytical method.
The analytical data has been validated using standard quality control measures performed as required by the
analytical method. Quality Assurance,method validations,instrumentation maintenance and calibration for all
parameters were performed in accordance with guiderines established by the USEPA(including 40 CFR 136
Method Update Rule May 2021)unless otherwise indicated.
Certain parameters(chlorine,pH,dissolved oxygen,sulfite...)are required to be analyzed within 15 minutes of
sampling. Usually, but not always,any field parameter analyzed at the laboratory is outside of this holding time.
Refer to sample analysis time for confirmation of holding time compliance.
The results are shown on the attached Report of Analysis(s).Results for solid matrices are reported on an as-
received basis unless otherwise indicated.This report shall not be reproduced except in full and relates only to
the samples included in this report
Please do not hesitate to contact me or client services if you have any questions or need additional information.
Sincerely,
Jamie Corporeal
Laboratory Project Manager
Laboratoys fawity in any claim retabng to analyses performed shall be rimiled to,at t analysis in gaeslicn at laborarcys eXoerrse,_o[Meie/undot tlrachargesPaid forparfom o�� �the
Springbrvolc Rd,Charlotte,NC 282l7 Waypoint.
ANALYTICAL Main 704.529.6364
www.waypotntana"cal.com
Certification Summary
Laboratory ID:WP CNC:Waypoint Analytical Carolina,Inc.(C), Charlotte,NC
State _ _ Program Lab ID
North Carolina State Program — — — ---- — _ Expiration Date
37735 07/31/2024
North Carolina State Program
South Carolina State 9012 Program 9 112/31/2023
South Carolina 07/31/2024
State Program 99012
12/31l2023
Page 1 of 1
00016MI-250,M2
Way�oint. 449 SpTingbrook Rd,Charlotte,NC 28217
ANALYTICAL Main 704.529.6364
www.waypointanalytical.com
Sample Summary Table
Report Number. 23-250-0052
Client Project Description: South Plant Facility
Lab No client Sample ID Matrix Date Collected Date Received
94455 Pipe 001 AqueOUS 09/07/2023 15:45 09/07/2023 16:00
Wa�/L}7®1�R-y v 4495pringbrook Rd,Charlotte,NC28217
Syr ��AANALYTICAOL' Main 704.529.6364
01058 wwN-+vaypointanalyticaLcom
Concrete Supply Company Project South Plant Facility
Johnnie Alexander
3923 Raleigh Sweet Information: Report Date: 0911S12023
Charlotte, NC 28206 Received:09/07/2023
Report Number:23-250-0052 REPORTOFAIVALYSrS
Lab No: 94455
Sample;ID:Pipe 001 Matrix:Aqueous
Sampled:9/7/202315:43
Test Results Units
MQL DF Date/nme By Analytical
Analyzed Method
HEM:Q0 and Grease <5.5 mg/L
5.5 1 09/13/23 11:08 W 16648
PH 6.6 S.U.
Total Suspended Solids 1 09/07/23 15:45 FLD FIELD
10.9 mg/L 3.3 1 09113/2312:35 JMD 254OD•2015
DeSnitions DF Dilution FaUar MQL McBrod QuantitatFan Limit
1 _
Waypint-'W 449 sprincirrook Rd,Charlotte,NC 28217
ANALYTICAL Main 704.529.6364
wwwmaypointanatytical.com
Shipment Receipt Form
Customer Number;01058
Customer Name: Concrete Supply Company
Report Number. 23-250-0052
Shipping Method
Fed Ex US Postal tom,Lab i Other: �—
i- UPS 1 Client t:,Courier Thermometer ID: RT-1514C
Shipping container/cooler uncompromised? 10)Yes No
Number of coolers/boxes received 1
Custody seals intact on shipping container/cooler? Yes
No ram, Not Present
Custody seals intact on sample bottles? Yes
No Not Present
Chain of Custody(COC)present? ill Yes 1 - �No
COC agrees with sample label(s)? (01 Yes ,No
COO properly completed (61 Yes i )No
Samples in proper containers? (0)Yes , ')No
Sample containers intact? 10,Yes i I No
Sufficient sample volume for indicated test(s)? ,el Yes I No
All samples received within holding time? to,Yes ( 'No
Cooler temperature in compliance? (61 Yes ( >No
Cooler/Samples arrived at the laboratory on ice. 10,Yes l No
Samples were considered acceptable as cooling
Process had begun.
Water-Sample containers properly preserved ice,Yes 'No
WA
Water-VOA vials free of headspace ,Yes t ,No *1 N/A
Trip Blanks received with VOAs Yes t-) No y,N/A
Soil VOA method 5035-compliance criteria met , ,Yes ,No ,0;WA
High concentration container(48 hr) Low concentration Encore samplers(48 hr)
High concentration Pre-weighed(methanol-14 d) Low conc pre-weighed vials(Sod Bis-14 d)
Special precautions or Instructions included? t l Yes i0,No
Comments: — -- -�
Signature_[p tlyn Cummins _ ,—Date �b9�07/2023'17:18 20
�n C�-�J}aW OF CUSTODY RECORD
?��t��y�j/ga
' rA of (fit PAGE .J.0FI_„ OUOTERTOENSUgeyROp Rntl,np„ YE$ NO WA
ANA1.Y11CAI .I 1� Sarn*o INTACT upon mrr an `�
449 Spdnpvhroek Road•Charlotte.NC ZD217 Project Name: Reca�d IN ICE?
Phone 70415Z9:P�S4 •� �Fox:�7�04f5Z 09 Short Hold Analysis NS) (No) UST ProJoCt: (Y08) (No) PROPER PRESERVATIVES Ind,wtaaT —
Client Company Name; 'Please ATTACH any project specific reporting(QC LEVEL 1II III IV) ROGONed WITHIN HOLDING TIMES7
Report TOICOntact Name; provisions andlor OC Requirements CUSTODY SEALS INTACT?
Reporting Address: Invoice To. VOLATILES reed WIOUT HEADSPACg7
Address; PROPER C014TAINERS used'+
TEMP ThermlD-=-tr Obsorvod„ .'L-ciCorr. .e/ •C
Phone; Fox(Yos)(No): Purchase Order NDJSllling Refaroncu "-- '—T'---
Emall Address: ;TO BE fILLEVIN BY CLIENTISAMPLING PERSO qNEL
R04"Sled Due Date U 4 Day U Z Days U 3 Days U 4 Days J 5 Days
EDD Type:POF—Exeol`Othof "Working na:'i' OG-9Days ]Standard 10 pays �;! I•y:rN A1ust Bo Certification: NC_ _ SC__
Site Location Name; r.r•A wroTed
Samples r,.M1.�+l after 15tOD KID 0o processed nod Ws,n•:.::a,y Other NIA
Site Location Physical Address: Tvmaround area As Gaged on beSmeSS days,excluding"e)ands and holidays. Water Chlorinated: YES._IN
(SEE REVERSE FOR rERNs a CONDITIONS REGARDING BEIMCES ��
RENDERED BY YJAYPOMT ANALYfICAt.LLC IO CLIFNq Somplos ldod Upon Collectlan: YES-. NO—
..._-.. .. .N ..
I TIME MATRIX SAMPLE CONTAINER ANALYSIS R EQUEST ED _
CLIENT DATE COLLECTED I (SOIL, - i SAMPLE DESCRIPTION COLLECTED MILITARY WATER, TNES O pRESERVA•
R •TYPE 1� ``
HOURS ! SLUOGS) SEE BELOW NO. SIZE /.��J/� REMAF i4!7�; ji yJzz �I I`��7z� I � >"�i� �J�- __ — - - �;• �•-� -.o?�.. _
a
1 Art, ?j1CP° ! xi
. 1 .
1 �
! i �IsV
I
Sampler's Signature _ 1�—V--l.—Your
Sampleo By/ - tAonUpon iledin whing,th 5 Chain olm authorizallon for Waypolnt MelytlCal toproceed with the anal eas as mquoota abovo.A ymust bd .9
s Ittod in writing to 010 Waypolnt Anelyllcat ProJOct MOnOgOr.There will be Chorgoe for any changes after Banco$have been Inlualixad, I Site Arrival Time:
ovlmn tlY.ISgor Re�hodeY.lSlyua,V1 _. _. .. �..
1 9 D.Lo Mterp Dery��,23 ... I A.dddional Comments: r,tla Doperturerime:
Ib
I a IsplaTue , I Nemp4 ey l50ntwo, ) use - I
1 Flaid 74eh Pee:
mauNw4 by IS,Snatusl -� ap TU4Pan1�NyLxA1tlY ... saw
1 Mk I` orgo:
N ae•Ae 01 SN"M NdT@ ALL SAMPLE CGl/U.4i'SNOULO BE'TA'P ryj� s ( . .
EACd FOA7RANSVONTATION IOINE U,hUFUlOAt: I :{b'ay
SAMPLES ARE NOTAOCEPTEDAI:DVLRIf1E0 AGAINST CDC UNIT RECENED A7THELABORATORY.
:)fo4 Ee uUPS :I ILrxWaeere4 VICeI4ArurACaior15urim U'Ge.
NPDE$i US7~- •GFt NDWATGR DRINKING WATER: SOLID WASYE: fr fiCRA: 6RWNFLU I I ANDFILL 611(CRc U NC❑SC ' UNC USC •LING USC Cl NC Cl SC
IUNC OSC IONC ❑SC IUNC ❑SC '❑NC OSC !ONC OSC
❑ I O ... U __ _ '❑ 0 ❑