Loading...
HomeMy WebLinkAboutNCG070065_Compliance Inspection Report Letter_20230925 ROY COOPER Governor ELIZABETH S. BISER Secretary WILLIAM E. TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality September 25,2023 Hydro Conduit,LLC Attn: Michael Shook 208 Randolph Street Thomasville,NC 27360 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCG070000 Hydro Conduit,LLC Hydro Condit,LLC, Certificate of Coverage NCG070065 Cabarrus County Dear Mr. Shook: On August 31, 2023, a site inspection was conducted for the Hydro Conduit, LLC facility located at 2268 Speedrail Drive,Cabarrus County,North Carolina.A copy of the Compliance Inspection Report is enclosed for your review.The site superintendent was also present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG070000 under Certificate of Coverage NCG070065. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Codde Creek, class C waters in the Yadkin Pee-Dee River Basin. As a result of the inspection,the facility was found to be noncompliant with the conditions of the NCG070000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or need assistance with understanding any aspect of your permit,please contact me at(704) 663-1699 or via e- mail at jerry.eplin@ncdenr.gov. Sincerely, h plin,PE Assistant Regional Engineer DEMLR Enclosure: Compliance Inspection Report c: DEMLR NPDES Stormwater Permit Laserfiche File North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Mooresville Regional Office 1 610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115 r 704-663-1699 Compliance Inspection Report Permit:NCG070065 Effective: 06/01/23 Expiration: 05/31/28 Owner: Hydro Conduit LLC DBA Rinker Materials SOC: Effective: Expiration: Facility: Hydro Conduit, LLC dba Rinker Materials County: Cabarrus 2268 Speed Rail Dr Region: Mooresville Harrisburg NC 28075 Contact Person:Brian Carter Title: Phone:336-475-1371 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 08/31/2023 Entry Time 01:20PM Exit Time: 02:35PM Primary Inspector:Matthew J Gigante Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG070065 Owner-Facility:Hydro Conduit LLC DBA Rinker Materials Inspection Date: 08/31/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 31,2023 the facility was inspected for stormwater compliance.At the time of the inspection, all portions of the stormwater pollution plan were present and up to date.Analytical and qualitative monitoring data were present, and samples were taken per the permit timeframes. While viewing the sampling points with the site representative, it was noted that outfall 1 was being sampled at the west side from a clean water pipe that flows into the site.According to the outfall and stormwater flow map, outfall 1 should be sampled from the east side of the site closer to where the ditch line discharges off the property. The facility must: 1) Immediately begin sampling outfall 001 from the correct location. 2)These samples should be collected at the first opportunity, and the results provided to DEQ via email to matthew.gigante@deq.nc.gov and jerry.eplin@deq.nc.gov. Page 2 of 3 Permit: NCG070065 Owner-Facility:Hydro Conduit LLC DBA Rinker Materials Inspection Date: 08/31/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location(USGS)map? 0 ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? E ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #Does the Plan include a BMP summary? 0 ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? 0 ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ #Does the facility provide and document Employee Training? N ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ #Is the Plan reviewed and updated annually? N ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: All portions of the stormwater pollution prevention plan were present and up to date. Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Qualitative monitoring data was present and being conducted per permit requirements. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical Monitoring data was present. However, samples from Outfall Number 1 were being collected from an incorrect location. Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? N ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ #Has the facility evaluated all illicit(non stormwater)discharges? E ❑ ❑ ❑ Comment: Based upon the inspection, it appears that the analytical samples for Outfall 1 were being collected on the west side of the channel where clean water enters the site rather than the east side, where the sample should be collected according to the outfall map in the stormwater pollution prevention plan. Page 3 of 3