Loading...
HomeMy WebLinkAbout_External_ FW_ SAW-2023-01609 (NCDOT _ WBS 49907 _ Replace existing Pipe _ Burnt Mill Road _ Forsyth County _ Div 9)Wanucha, Dave From: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil> Sent: Thursday, September 21, 2023 11:07 AM To: Euliss, Amy Cc: Wanucha, Dave Subject: [External] FW: SAW-2023-01609 (NCDOT / WBS 49907 / Replace existing Pipe / Burnt Mill Road / Forsyth County / Div 9) Attachments: 20230808 SAW-2023-01609 permit plans.pdf, NWP-3.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Amy, On August 8, 2023, the US Army Corps of Engineers, Wilmington District received your e-mail notification detailing the impacts associated the construction of SAW-2023-01609 NCDOT WBS 49907, replacing existing culvert under Burnt Mill Road (unnamed tributaries to West Fork Deep River) in Forsyth County, North Carolina. And supplemental information you provided on August 15, 2023, including a photograph of the existing project site. This project will include the replacement of the existing 52-foot-long culvert with a new culvert that is 60 feet in length. This nominal increase in structure length is due to design improvement to stabilize the damaged inlet of the existing structure and will include placement of an 8-foot-long or 0.001 acre added segment of culvert to include a sill for grade control at the outlet of the proposed culvert. This project will also include the placement of a total of 43 linear feet of bank stabilization to protect the new culvert and existing Burnt Mill Road fill slope. Also, this project will include placement of a total of 35 linear feet or 0.003-acre temporary impacts associated with dewatering structures in unnamed tributaries to West Fork Deep River for the removal of the existing culvert and placement of the new culvert. Plans detailing this project are attached to this e-mail. Based on the information provided in your application and the updated details as revised on August 15, 2023, (details of existing site conditions including photograph) your work is authorized by Nationwide Permit (NWP) 3 Maintenance and does not require a pre -construction notification (PCN), provided it is accomplished in strict accordance with the attached conditions and your submitted description. Any violation of the attached conditions or deviation from your submitted description and attached plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. Attached are copies of the NWP 3, and the applicable permit conditions. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. This response to your notification does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. As indicated in the Corps conversation with NC Department of Environmental Quality (DEQ) personnel, this project will require an individual 401 Water Quality Certification and State Stream Buffer Certification. Please be aware that no in -stream work is authorized under the non -reporting NWP-3 until NC DEQ provides NCDOT with both the Water Quality and Stream Buffer Certifications. Any questions related to water quality certification specific to this project should be directed to North Carolina Division of Water Resources. Please let me know if you have any questions regarding this permit or the conditions. You can call me or e-mail. Stephen A. Brumagin NCDOT Project Manager U.S. Army Corps of Engineers, Charlotte Field Office, Wilmington District Work cell 704 798-6471 From: NCDOT_REG <NCDOT_REG@usace.army.mil> Sent: Tuesday, August 8, 2023 3:19 PM To: Amy, Euliss <aeuliss@ncdot.gov> Cc: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil> Subject: SAW-2023-01609 (NCDOT / WBS 49907 / Replace existing Pipe / Burnt Mill Road / Forsyth County / Div 9) Good Afternoon, Your Pre -Construction Notification (PCN) NWP request has been received, assigned action ID SAW-2023-01609 and forwarded to Steve Brumagin for further processing. Please refer to the action ID in all correspondence. Thank you, Josephine Schaffer From: laserfiche.ncdenr.gov@mccicloud.io <laserfiche.ncdenr.gov@mccicloud.io> Sent: Tuesday, August 8, 2023 12:55 PM To: NCDOT_REG <NCDOT REG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [URL Verdict: Neutral][Non-DoD Source] PCN - Forsyth - DOT A new project has been received on 8/8/2023 12:54 PM for Burnt Mill Road pipe replacement. The link below will take you to the project folder. httos://edocs.dea.nc.iaov/laserfiche/index.asox?db=WaterResources#id=2908436:view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. PEI