Loading...
HomeMy WebLinkAbout_External_ NCDOT STIP Project BR-0250_ Avery_ Caldwell_ and Watauga Counties -- Start of Study NoticeWanucha, Dave From: Archual, Adam J. <aarchual@GFNET.com> Sent: Monday, September 18, 2023 1:57 PM To: Phillips, Meagan C; Barrier, Phillip; Kidd, Allison; Clerk, Avery; martha.hicks@averycountync.gov; Buchanan, Paul; Edmisten, Mike L; danbrigman@averyschools.net; brianking@averyschools.net; arich@caldwellcountync.org; Dibernardi, Dino; Brown, Ricky K; Phipps, Don; Mccarraher, Jay; Geouque, Deron T; jason.walker@watgov.org; anita.fogle@watgov.org; lary.turnbow@watgov.org; Holt, Will; Garland, Shane; Elliott, Scott; lyonsj@wataugaschools.org; Wanucha, Dave; McHenry, David G; Barren, Loretta (FHWA); somerviIle.amanetta@epa.gov; loretta.a.beckwith@usace.army.mil; hollandyouungman@fws.gov; Poe, Michael L; Dishman, Ivan H; Shaw, Ramie A; Hining, Kevin J; Weisz, Robbie N; Huffman, Susan O; Steele, Christopher J; Brumfield, Ryan M; Morgan, Stephen R; Sealy, Stephen G; Gulledge, R. Joel; Robbins, Jamille A; Reese, Michael P; Harris, David B; Lancaster, Jamie J; Pilipchuk, John L Cc: Pierce, Nicholas A; Hanks, Brian; Carroll, Trey H; Nelson, Eric B. ("Rick"); Archual, Adam Subject: [External] NCDOT STIP Project BR-0250, Avery, Caldwell, and Watauga Counties -- Start of Study Notice Attachments: BR-0250 SOS Package.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon: North Carolina Department of Transportation is starting the project development, environmental and engineering studies for the construction of Project BR-0250, which proposes to replace three timber bridges in NCDOT Division 11: 1. Bridge 149, carrying Herman Buchanan Road (SR 1186) over Horse Creek — about 4 miles west-northwest of Newland, in Avery County 2. Bridge 252, carrying Spring Meadow Road (SR 1549) over UT To Zacks Fork Creek — about 3 miles northeast of Lenoir, in Caldwell County 3. Bridge 231, carrying Ball Branch Road (SR 1337) over Norris Fork — about 4 miles north of Boone, in Watauga County Please find location maps in the attached PDF. NCDOT staff may locate the PDF document on Connect: https://connect. ncdot.gov/site/Preconstruction/division/div11/BR-0250/Protect% 2ODevelopment/BR- 0250% 20Sta rt% 20of % 20Study/BR-0250/ 20SOS/ 20Package. pdf We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. Your comments may be used in the preparation of environmental documentation. Currently, the project is State funded, and a Minimum Criteria Determination Checklist will be prepared. The project is scheduled for construction in FY 2024. If you have any questions concerning the project, please contact the NCDOT Project Engineer, Nick Pierce, at (919) 707- 6547 or napierce@ncdot.gov (cced). You may also send questions or comments to me by response to this email. Please include the project number (BR-0250) in all correspondence and comments. We respectfully request responses by October 20th so that your input can be used in the documentation of this project. If you have no comment at this time, then a response is not required. Adam Archual I Sr. Environmental Planner & Architectural Historian Gannett Fleming I One Glenwood Avenue, Suite 900, Raleigh, NC 27603 O 984.389.2398 1 C 770.262.9361 1 aarchual@gfnet.com Excellence Delivered As Promised gannettfleming.com I Stay connected: Linkedln I Facebook I Twitter