Loading...
HomeMy WebLinkAboutNCC215916_Modification Review_20230925 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 9/21/2023 2:45:09 PM (ADD TO FILE Submittal) Approve by bethany.georgoulias 9/25/2023 9:15:33 AM (Construction COC ADD TO FILE Review-NCC215916) 0 Approval indicated on plan sheet uploaded. Legally responsible person updated 9/25/2023. • The task was assigned to bethany.georgoulias.The due date is: September 26,2023 5:00 PM 9/21/2023 2:45:09 PM Ago DEQMODIFICATION Permit for Construction Activities 0i0rl 0000 Certificate of NCC215916 Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters) Information associated with this permit: Project Name FDB Project Galaxy-Early Grading Address 11751 Holly Springs New Hill Road, Holly Springs, NC County Wake Latitude 35.6553 Longitude -78.8735 Permittee Listed Fujifilm Diosynth Biotechnologies USA, Inc. Legally Responsible Thomas Schmalzbauer Individual At the time of Modification Request(not looked up again at review) NC Reference No. NCG01-2021-5916 E&SC Plan ID 21-2021 Original NOI Tracking 69506 No.* Date COC Issued* 10/28/2021 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Modification* Closed-Out Lots/Outparcels in E&SC Plan Additional Lots/Outparcels Approved-E&SC Revised Other Revision(s)to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons(List) Expanded project area and change to Legally Responsible Person Addional Explanation More information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers. Project boundaries expanded,approved by local AHJ,and new responsible person You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Documentation Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.) Fuji_EastContractorParking_RevisedApprovedSheets.pdf 16.03MB NCDEQ-Legally-Responsible-Change-Form-Signed.pdf 620.26KB Must be PDF format Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOl on 2/3/2023 and will not be answered in applications submitted prior to that date. North Carolina General Statute 143-215.613(1)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of that permit. Signature oxem?'"alte ro Type Name* Jordan Ulrich Title* Vice President of Project Delivery Organization* Fujifilm Diosynth Biotechnologies USA, Inc. Date* 09/21/2023 Email Address* jordan.ulrich@fujifilm.com Email for confirmation Telephone Number* 4192669596 Contact number if we need to reach you Note:Original permittee and site contact are copied on modification correspondence. Additional Email jamie.gollings@jacobs.com (Optional) Additional email for confirmation Original Permittee thomas.schmalzbauer@fujifilm.com Email Original Site Contact thomas.schmalzbauer@fujifilm.com Email Review Date 09/25/2023 Rescinded Since Submitted?