Loading...
HomeMy WebLinkAbout20180196 Ver 2_Catfish Pond II Mitigation Bank Parcel_Credit Release Request Task 6_20230914 Wildlands Engineering, Inc. (P) 919.851.9986 • 312 West Millbrook Road, Suite 225 • Raleigh, NC 27609 September 14, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth (khogarth@wildlandseng.com, 540-907-9432) Through: Wildlands Holdings V, LLC We formally request a credit release for the Catfish Pond II Nutrient Offset and Buffer Mitigation Bank for completion of Task #6 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #6 and are pending review: Monitoring Year 3 Report Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 10 34,283.400 ft2 0.10 x 342,834.000 ft2 = 34,283.400 ft2 Buffer Preservation NA NA Buffer Enhancement 10 5,204.141 ft2 Cattle Exclusion. 0.10 x 52,041.411 ft2 = 5,204.141 ft2 Generated Nitrogen Nutrient Offset 10 4,328.771 lb-N 0.10 x 43,287.706 lb-N = 4,328.771 lb-N Delivered Nitrogen Nutrient Offset (Jordan sites only) NA NA Generated Phosphorus Nutrient Offset 10 278.806 lb-P 0.10 x 2,788.063 lb-P = 278.806 lb-P Delivered Phosphorus Nutrient Offset (Jordan sites only) NA NA Signature: Attachments: 1)Approved Project Credit Table (As-Built) 2) Approved Credit Release Schedule (BPDP) Approved Project Credit Table (As-Built) Catfish Pond II Mitigation Bank Parcel Monitoring Year 0 - 2021 Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter NO if ephemeral or ditch 1) Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (ft2) Total (Creditable) Area of Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Convertible to Riparian Buffer? Riparian Buffer Credits Convertible to Nutrient Offset? Delivered Nutrient Offset: N (lbs) Delivered Nutrient Offset: P (lbs) Buffer Rural Yes I / P Restoration 0-50 Catfish Creek, UT1, Mountain Tributary 829 829 1 100%1.00000 Yes 829.000 Yes 43.258 2.786 Buffer Rural Yes I / P Restoration 51-100 Catfish Creek, UT1, Mountain Tributary 265,793 265,793 1 100%1.00000 Yes 265,793.000 Yes 13,869.434 893.299 Buffer Rural No Ditch Restoration 0-50 Ditch D 76,212 76,212 1 100%1.00000 Yes 76,212.000 Yes 3,976.844 256.139 Buffer Rural Yes I / P Enhancement via Cattle Exclusion 0-100 Catfish Creek, UT1, Mountain Tributary 92,318 92,318 2 100%2.00000 Yes 46,159.000 No —— Buffer Rural Yes I / P Enhancement via Cattle Exclusion 101-200 Catfish Creek, UT1, Mountain Creek 35,651 35,651 2 33%6.06061 Yes 5,882.411 No —— Nutrient Offset Rural Yes I / P Restoration 101-200 Catfish Creek, UT1, Mountain Tributary 608,259 1 33%No —Yes 31,739.768 2,044.286 Nutrient Offset Rural No Ditch Restoration 51-200 Ditch D 221,304 1 33%No —Yes 11,547.938 743.777 Totals:1,300,366 470,803 Enter Preservation Credits Below Eligible for Preservation (ft2):156,934 Credit Type Location Subject?Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (sf) Total (Creditable) Area for Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits Buffer Preservation 0 0 — Preservation Area Subtotal (ft2):0 Preservation as % Total Area of Buffer Mitigation:0.0% Ephemeral Reaches as % Total Area of Buffer Mitigation:0.0%Square Feet Credits2 342,834 342,834.000 127,969 52,041.411 0 0.000 0 470803 470,803 394,875.411 470803 Square Feet Credits2 Nitrogen:43,287.706 1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).Phosphorus:2,788.063 2. No credit is claimed for 73,616 ft 2 (1.69 acres) which includes the Ditch D channel, the forested area along Ditch D, credits removed for non-diffuse flow, areas more than 200' from top of bank, and internal crossings. Mitigation Totals Nutrient Offset:829,563 Restoration: Enhancement: Preservation: Total Riparian Buffer: TOTAL NUTRIENT OFFSET MITIGATION Neuse 03020201 - Upper Falls Lake 19.16394 297.54099 TOTAL AREA OF BUFFER MITIGATION (TABM) Mitigation Totals Approved Credit Release Schedule (BPDP) Catfish Pond II Mitigation Bank Parcel Bank Parcel Development Package Task Project Milestone % Credit Available for Sale 1 Instrument and BPDP Approved by NCDWR, NCDMS Full Delivery Mitigation Plans approved by the IRT and DWR, Conservation Easement Recorded and Financial Assurance Posted 20 2 NCDMS Full Delivery As-Built Report Submitted to NCDWR, all Mitigation Site Earthwork, Planting and Installation of Monitoring Devices Completed for both the Catfish Pond Full-Delivery Site (DMS ID #100039) and the Bank Parcel. 20 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10 4 Monitoring Report #1: Approved by the NCDWR & financial assurance renewed 10 5 Monitoring Report #2: Approved by the NCDWR & financial assurance renewed 10 6 Monitoring Report #3: Approved by the NCDWR & financial assurance renewed 10 7 Item B(1) of Section X in this Instrument has been completed and approved by NCDWR 5 No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship 8 Monitoring Report #4: Approved by the NCDWR & financial assurance renewed 5 9 Monitoring Report #5: Approved by the NCDWR and final site visit by NCDWR has been conducted 10 Total 100%