HomeMy WebLinkAboutNC0004464_CEI_20230925DocuSign Envelope ID: 8EC442CD-OD92-4277-9EE4-E855516FF86C
ROY COOPER
Co,ernor
ELIZABETH S. B1SER
Secretary
RICHARD E. ROGERS, JR.
Director
o-`"` sreve4
l��QWM'�a
NORTH CAROLINA
Environmental Quality
SENT VIA ELECTRONIC MAIL ONL Y.• NO HARD COPY WILL BE MAILED.
September 25, 2023
D Marche Pittman
Polk County
Email: mpittman@polknc.org
SUBJECT: Compliance Inspection Report
Woodland Mills WWTP
NPDES WW Permit No. NC0004464
Polk County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Woodland Mills WWTP
on 9/06/2023. This inspection was conducted to verify that the facility is operating in compliance with
the conditions and limitations specified in NPDES WW Permit No. NC0004464. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Rachel Rose with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
rachel.rose@deq.nc.gov.
Sincerely,
DocuSi�g/ne�d by -
[IV
G�3
SACE19D3940C494...
Rachel Rose, Environmental Specialist
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Laserfiche
Juanita James, (ORC, James & James Environmental)
D_EQ� firth[arollna9egartmenlofFm9ronmrntalQualhVlDivlsWnaFWaterResaurcrs
Ashcvllk Rc9ianal Mcc 1 2090 U.S. Highway 70 1 8wanna—. North Carallna 25776
o�n.mixnno....i o.iNJ-� 62&296.45C0
DocuSign Envelope ID: 8EC442CD-OD92-4277-9EE4-E855516FF86C
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0004464 111 121 23/09/06 I17 18 LC] I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I n, I 71 I 74 79 I I I I I I I80
701 I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:30AM 23/09/06
19/01/01
Woodland Mills WWTP
4021 NC Hwy 108
Exit Time/Date
Permit Expiration Date
Mill Spring NC 28756
11:00AM 23/09/06
23/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Juanita Reed James/ORC/828-697-0063/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
D Marche Pittman,PO Box 308 Columbus NC 287220308//828-894-3301/8288942263
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar 0 Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
s o
Mara G Chamlee —.Sis any: DWR/ARO WQ/828-296-4500/ 9/25/2023
[AA4697633A650J5A-
Rachel Rose DWR/ARO WQ/828-296-4500/
DocuS 9/25/2023
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
oo..sis�ea by: 9/ 2 2 /2 02 3
Fau,ia
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
DocuSign Envelope ID: 8EC442CD-OD92-4277-9EE4-E855516FF86C
NPDES yr/mo/day Inspection Type (Cont.)
NC0004464 I11 12I 23/09/06 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Rachel Rose and Mara Chamlee, with the Asheville Regional Office (ARO), met with Ms. Juanita
James (ORC, James & James Environmental) and Hannah Turner (General Manager, James & James
Environmental) for a Compliance Evaluation Inspection of the Woodland Mills WWTP on September
6, 2023. This inspection was conducted to determine whether the facility is being operated and
maintained in compliance with NPDES Permit No. NC0004464.
Overall, the facility is well -maintained and in good condition.
The average flow of the facility is approximately 600 GPD in summer and 2,000-3,000 GPD during
the school year. The local mill is now part of the regular flow of the facility.
The following items were noted during the inspection:
Operations & Maintenance: The ORC mentioned that the low lighting for the facility makes it difficult
to evaluate the facility, especially in the spring/summer months. It is suggested to install additional
lighting to help with proper maintenance and evaluation of the facility.
Standby Power: The control panel for the WWTP does not have the correct connection requirements
to be powered by a generator. A water tower is available for the school allowing for flow to still reach
the plant if the power went out, so updating the control panel to be able to connect to the backup
generator is suggested if funds are available.
Disinfection & De -Chlorination: The solids at the beginning of the chlorine contact chamber were
high. It was scheduled to have the solids wasted to the head of the plant the week after the
inspection. It is suggested to have the contact chamber pumped or wasted soon if it is not already
done.
Page#
DocuSign Envelope ID: 8EC442CD-OD92-4277-9EE4-E855516FF86C
Permit: NC0004464 Owner -Facility: Woodland Mills WWTP
Inspection Date: 09/06/2023 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
■
❑
❑
❑
application?
Is the facility as described in the permit?
■
❑
❑
❑
# Are there any special conditions for the permit?
❑
■
❑
❑
Is access to the plant site restricted to the general public?
■
❑
❑
❑
Is the inspector granted access to all areas for inspection?
■
❑
❑
❑
Comment: The permit had some missing components of the facility and permitting was contacted
about the discrepancy. The new permit will have an updated list of components.
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: The process controls analyzed include pH and TSS. The lighting for the facility could
be improved. See summary for details.
Record Keeping
Yes
No
NA
NE
Are records kept and maintained as required by the permit?
■
❑
❑
❑
Is all required information readily available, complete and current?
■
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
■
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
■
❑
❑
❑
Is the chain -of -custody complete?
■
❑
❑
❑
Dates, times and location of sampling
■
Name of individual performing the sampling
■
Results of analysis and calibration
■
Dates of analysis
■
Name of person performing analyses
■
Transported COCs
■
Are DMRs complete: do they include all permit parameters?
■
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
■
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
❑
❑
■
❑
operator on each shift?
Is the ORC visitation log available and current?
■
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
■
❑
❑
❑
Page# 3
DocuSign Envelope ID: 8EC442CD-OD92-4277-9EE4-E855516FF86C
Permit: NC0004464 Owner -Facility: Woodland Mills WWTP
Inspection Date: 09/06/2023 Inspection Type: Compliance Evaluation
Record Keeping
Yes
No
NA
NE
Is the backup operator certified at one grade less or greater than the facility
0
❑
❑
❑
classification?
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Comment:
Bar Screens
Yes
No
NA
NE
Type of bar screen
a.Manual
b.Mechanical
❑
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
■
❑
❑
❑
Is disposal of screening in compliance?
■
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment: The lift station has a comminutor that also screens for grit and debris.
Equalization Basins
Yes
No
NA
NE
Is the basin aerated?
0
❑
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
■
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Are audible and visual alarms operable?
0
❑
❑
❑
# Is basin size/volume adequate?
■
❑
❑
❑
Comment:
Aeration Basins
Yes No
NA NE
Mode of operation
Ext. Air
Type of aeration system
Diffused
Is the basin free of dead spots?
0 ❑
❑ ❑
Are surface aerators and mixers operational?
❑ ❑
0 ❑
Are the diffusers operational?
■ ❑
❑ ❑
Page# 4
DocuSign Envelope ID: 8EC442CD-OD92-4277-9EE4-E855516FF86C
Permit: NC0004464 Owner -Facility: Woodland Mills WWTP
Inspection Date: 09/06/2023 Inspection Type: Compliance Evaluation
Aeration Basins
Yes
No
NA
NE
Is the foam the proper color for the treatment process?
0
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/I)
❑
❑
❑
Comment: The diffusers are set on an automatic timer cycle of 30 minutes on, 30 minutes
off.
The
settleability was recorded at approximately 90% at the time of the inspection.
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
❑
❑
0
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
■
❑
❑
❑
Is the drive unit operational?
❑
❑
0
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
E
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
0
❑
❑
❑
Comment: The sludge blanket measured to be at 2 ft. out of 8 ft. of water at the time of the
inspection. The weirs are sprayed weekly and the facility pumps the sludge on an
as -needed basis. The facility was last pumped in May of 2023 by Mike's Setpic
Service.
When a pumping service comes, the secondary clarifier, the chlorine contact chamber,
and the aerobic digester are all pumped.
Aerobic Digester
Yes
No
NA
NE
Is the capacity adequate?
■
❑
❑
❑
Is the mixing adequate?
❑
❑
❑
Is the site free of excessive foaming in the tank?
0
❑
❑
❑
# Is the odor acceptable?
■
❑
❑
❑
# Is tankage available for properly waste sludge?
■
❑
❑
❑
Comment: The aerobic digester is aerated, however, the diffusers were not on at the time of the
inspection because the facility was wasting at the time of the inspection.
Disinfection -Tablet
Are tablet chlorinators operational?
Yes No NA NE
■ ❑ ❑ ❑
Page# 5
DocuSign Envelope ID: 8EC442CD-OD92-4277-9EE4-E855516FF86C
Permit: NC0004464 Owner -Facility: Woodland Mills WWTP
Inspection Date: 09/06/2023 Inspection Type: Compliance Evaluation
Disinfection -Tablet Yes No NA NE
Are the tablets the proper size and type? 0 ❑ ❑ ❑
Number of tubes in use? 1
Is the level of chlorine residual acceptable? ❑ ❑ ❑
Is the contact chamber free of growth, or sludge buildup? S ❑ ❑ ❑
Is there chlorine residual prior to de -chlorination? ❑ ❑ ❑
Comment: The solids level in the contacts chamber were high, however, it was scheduled to have
the solids wasted to the head of the plant the next week after the inspection. Whenever
a pumping service is scheduled, the contact chamber is usually pumped along with the
aerobic digester and secondary clarifier.
De -chlorination
Type of system ?
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de -chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de -chlorinators operational?
Number of tubes in use?
Comment:
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Yes No NA NE
Tablet
❑
❑
■
❑
❑
❑
■
❑
•
❑
❑
❑
■
❑
❑
❑
•
❑
❑
❑
1
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ❑ ■
Comment: The meter was last calibrated on September 19, 2022 by Laboratory Instrument
Service and the next calibration service has been scheduled.
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ■ ❑
Page# 6
DocuSign Envelope ID: 8EC442CD-OD92-4277-9EE4-E855516FF86C
Permit: NC0004464 Owner -Facility: Woodland Mills WWTP
Inspection Date: 09/06/2023 Inspection Type: Compliance Evaluation
Effluent Pipe Yes No NA NE
Comment: The effluent pipe is still tied into a storm drain for the storm water coming from the
parking lot of the school.
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
Yes No NA NE
❑ ■ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Comment: A backup portable generator is available at the school, however, it can only connect to
the pump station. See summary for details.
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment: The permit requires grab samples.
Yes No NA NE
❑ ❑ ■ ❑
❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
Page# 7