HomeMy WebLinkAboutNC0064246_NC0064246 Draft Factsheet 2023_20230926NCDEQ / DWR / NPDES
EXPEDITED FACT SHEET - NPDES PERMIT RENEWAL
NPDES Permit NCO064246
Caroline Robinson / Compliance & Expedited Permitting Unit / caroline.robinsonkdeq.nc.gov / Sept 2023
FACILITY INFORMATION
Applicant/Facility Name
Jones Estates Pace LLC (Kellen Buss, Director)
Pace Mobile Home Park WWTP
Applicant Address/Mailing
2310 South Miami Boulevard Suite 238, Durham, NC 27703
Address
Facility Physical Address
15026 Buffalo Road, Clayton, NC 27527
Permitted Flow (MGD)
0.015 MGD
Type of Waste
100% Domestic, < 1 MGD
Facility Class
WW-2
County
Johnston
Permit Status
Renewal
Regional Office
RRO
STREAM CHARACTERISTICS
Receiving Stream
Unnamed Tributary
Stream
C-NSW
to Buffalo Creek
Classification
Stream Segment
27-57-16-(3)
Outfall Lat.
350 42' 38" N
7Q10 - Summer (cfs)
0
Outfall Long.
780 22' 53" W
7Q10 - Winter (cfs)
0
Drainage basin
Neuse River Basin
30Q2 (cfs)
0
Subbasin
03-04-06
Average Flow (cfs)
0.21
HUC
0302020115
Yes, added to the 303 (d) list
in 2018 for fair, poor, or
IWC (%)
100% (summer and
303(d) List
severe Noclassification of
winter)
the fish community and in
2022 for pH exceeding
criteria. Remains on the list.
BASIC INFO FOR EXPEDITED PERMIT RENEWAL
Does permit need Daily Max NH3 limits?
No-- already present
Does permit need TRC limits/footnote?
No — already present
Does permit have toxicity testing?
No — not a complex wastestream
Does permit have any Special Conditions?
Neuse nutrient conditions
Does permit have instream monitoring?
Yes — U & D for Temperature and Dissolved Oxygen
New expiration date:
Oct 31, 2028
FACILITY SUMMARY
Jones Estates Pace LLC operates a 100% domestic wastewater treatment plant for 135 residents. The Pace
Mobile Home Park WWTP is a minor facility (flow < 1 MGD) with a design capacity and permitted
wastewater discharge of 0.015 MGD. The original NPDES permit for this facility was issued in December
1985. This facility received SOC S22-004, which became effective on June 1, 2023 and expires on February
15, 2024. This facility utilizes the following treatment components:
• Continuous flow meter system
• Manual bar screen/splitter box
• Equalization tanks
• Dual aeration chambers
• Dual clarifiers
Fact Sheet for Permit Renewal
Sept 2023 - NPDES Permit NCO064246 - Page 1
• Aerated sludge holding tank
• Dual air blowers
• Tablet chlorinator
• Tablet dechlorinator
• Audible visual alarms
• Electrical hook-up for portable generator
• Portable generator (kept off -site)
RENEWAL SUMMARY
This renewal contains the following changes:
• Updated the Supplement to Permit Cover Sheet treatment components section since the plant is
currently under rehabilitation.
• Added Neuse nutrient reopener condition for all Neuse River discharge permits to Part L A. (6).
• Updated eDMR language for electronic data submission in Part L A. (7)
COMPLIANCE HISTORY
Pace Mobile Home Park WWTP has had multiple fines and limit and monitoring violations from August
2018 to September 2023. The facility is currently under SOC effective 6/l/2023. This facility has an unpaid
and overdue permit annual fee for period year 2023. Most recent inspection (June 2023) showed the facility
to be in noncompliance.
COMMENTS ON DRAFT PERMIT
• Cheng Zhang (Raleigh Regional Office, Environmental Specialist II) noted that the plant is
currently under rehabilitation, and he made several edits in the treatment components section on the
Supplement to Permit Cover Sheet.
Fact Sheet for Permit Renewal
Sept 2023 - NPDES Permit NCO064246 - Page 2