Loading...
HomeMy WebLinkAboutNCC223550_MODIFICATION Supporting Doc (ADDL LOTS)_20230921 Engineering Department Wake Forest Town Hall—3rd Floor 301 S Brooks Street TOWN of Wake Forest, NC 27587 WAKE FOREST P:919-435-9510 www.wakeforestnc.gov EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL September 20,2023 Lennar ATTN: Robert Smart 1100 Perimeter Park Dr Morrisville, NC 27560 RE: Project Name: Rosedale Phase 2B Lots 96-101, 151-154, 178-181 Permit Number: 2023-00002343 Location: 1860280811 (Unverified) Acres Approved:3.00 Submitted By: Agnieszka Nau Date Approved: September 20,2023 Dear Robert Smart: This office has reviewed the subject erosion and sedimentation control plan.We find the plan to be acceptable and hereby issue this Letter of Approval.The land disturbance permit will be issued after you have obtained a Certificate of Coverage,as outlined below, and provided a copy to this office.The land disturbance permit shall expire two(2)years from the date of issuance and can be renewed in one-year increments. Per Section 12.3.2 of the Unified Development Ordinance(UDO),a copy of the approved erosion control plan shall be on file at the job site.Also,this letter provides you notice of our right to periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the UDO. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973,this office may require revisions to the plans and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal,State,and Local water quality laws, regulations,and rules.This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form.You are requested to file an amended form if there are any changes in the information. Created with idtPlans Review Rosedale Phase 2B Lots 96-101, 151-154, 178-181 Page 1 of 2 9/20/23 Be aware that your project is subject to the NPDES General Stormwater Permit NCG01000 (Construction Activities).The Town does not distribute the NCG01 permit; instead,you will have to obtain the permit from NC DEMLR.To receive a Certificate of Coverage,you must submit an electronic Notice of Intent with this approval letter.The NCGO1 permit requires that the following documentation be kept on file at the job site: • The approved E&SC plans as well as any approved deviations • The NCG01 permit and the Certificate of Coverage • Records of inspections made during the previous 12 months Sincerely, GI9a46is4- Jessica Watkins Engineering Technician Created with idtPlans Review Rosedale Phase 2B Lots 96-101, 151-154, 178-181 Page 2 of 2 9/20/23