Loading...
HomeMy WebLinkAbout20230415 Ver 1_DCM Permit_20230511Permit Class NEW Permit Number 50-23 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission r r t nit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Stacy L. Peedin,187 Tom Crocker Lane, Selma, NC 27576 Authorizing development in Carteret County at adj. to Pettiford Creek Bay, at 220 Dom Dr., in Swansboro , as requested in the permittee's application dated 2/20/23, including attached workplan drawings (5), Sheets 1-5 of 5 all dated 1/26/23. This permit, issued on May 10, 2023 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes the demolition of the existing docking facility and the construction of the docks, piers, boathouses, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharged at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on May 10, 2028 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. (for) Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Stacy L. Peedin Permit No. 50-23 Page 2 of 3 ADDITIONAL CONDITIONS 3) Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes a maximum of four (4) formalized boat slips. 6) The boathouses shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouses shall not exceed the dimensions on the authorized workplans. 7) The authorized boathouses shall be single story, and shall not be designed to allow for second story use. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 10) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with NCAC 15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. Sedimentation and Erosion Control 11) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. USACE Conditions 13) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines20l7.pdf. Stacy L. Peedin ADDITIONAL CONDITIONS General Permit No. 50-23 Page 3 of 3 14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 15) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. 16) The permittee and/or their contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2023-00636). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4501 and assigned the project DWR Project No. 20230415. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 515-5400 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $250 was received by DCM for this project.