HomeMy WebLinkAboutNCC202691_NOT Closeout Documents_20230919 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: Brunswick Project: The Coast Academy River basin: Lumber
Person financially responsible:Brunswick County Board of Education-Craig Project#: BRUNS-2020-072
Eckert,Director of Capital Projects&Planning
Address: 35 Referendum Drive,Bolivia,NC 28422
1. Project Location: 1109 Old Ocean Hwy,Bolivia
Pictures: No
2. Weather and soil conditions: 70's,clear,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Secretary Title:
Inspection report: Sent Report Date given/sent: February 24,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.The E&SC file will be closed.Termination of coverage under the NPDES General
Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee
via a Notice of Termination(NOT).The NOT is available at deq.nc.gov/NCG01.Please note
that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Garrett Elmo ya,..att-CV111.6' Others present:
Date of inspection: February 23,2023 Time arriving on site: 10:15 AM Time leaving site: 10:30 AM
CC: