HomeMy WebLinkAbout760004_Compliance Evaluation Inspection_20230522 Division of Water Resources
Facility Number - O Division of Soil and Water Conservation
O Other Agency
Type of Visit: Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: t Arrival Time:� Departure Time: County:�� Region
Farm Name: (�����'�'Y ,�Q(� �fy—A Owner Email:
Owner Name: ('(>(�'n�;(1n QA(� ��� Phone:
Mailing Address: • 6 v v '0 1J
Physical Address: 1--Jv`1 1 �l c V B�1G
Facility Contact: �bYl� M MCLI, Title: Phone:
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
o \ O/ I t 11
Location of Farm: LatitudeZj 2 ) 1 Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow
Wean to Feeder Non-Layer Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes x No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge fi•om any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than fi•om a discharge?
Page 1 of'3 511212020 Continued
Facili Number: jDate of Inspection:
Waste Collection&Treatment
4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes No ❑ NA ❑ NE
a.If yes,is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): � � op
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [ ] No ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ( No ❑ NA ❑ NE
Lly
waste management or closure plan? I
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes ] No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes ( No ❑ NA ❑ NE
maintenance or improvement? �T
11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): t Cg_� ` 5e C
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0 No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE
Required Records&Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ] No ❑ NA ❑ NE
the appropriate box. J�
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements []Other:
,2�' Waste
11.. Does record keeping need improvement? ❑ Yes No ❑ NA ❑ NE
� Application Weekly Freeboard Waste Analysis O's .,�;c ❑' Weather Code
Rainfal Stockin 120 Minute Inspections Monthly and V Rainfall Inspections Sludge Survey
` ZnZe C�
22. Did the facility fail to insta nd maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No NA ❑ NE
Page 2 of 3 V 2/2020 Continued
Facility Number: jDate of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes v4- No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes (O No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately. 7�
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes EgNo ❑ NA ❑NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes MNo ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE
Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
cco'o C
C ckG 10rLL-h 0n (�u e ew bD&S3 C om�u-ke_k 4 -N-nf dL,,,<
r�-Oa7��
q p iP�-S on
.1
Reviewer/Inspector Name: OILY- Phone.0' �(' l �— C1
Reviewer/Inspector Signatur Date: r i�
Page 3 of 3 5/ 212020