HomeMy WebLinkAboutSWA000041_180 Day Expiration Reminder_20230628 �.�.c STATE
�y
ROY COOPER
Governor
r �?
ELIZABETHS.BISER
Secretary $
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
June 28,2023
The Farm at Mills River,LLC
Attn: Billy Taylor
1005 Cane Creek Road
Fletcher,NC 28732
Subject: Expiration Date Reminder—Less Than 180 Days
Fast Track Authorization to Construct Permit No.SWA000041
Nesbitt Farms Subdivision—Phase II
Henderson County
Dear Mr. Taylor
The Post-Construction Stormwater Fast Tract Authorization to Construct(ATC) Permit
SWA00004 I expires in less than 180 days on December 20,2023An expiration date reminder letter was
previously sent on December 20,2022, one year in advance of this expiration date, advising of your
obligations under this permit as well as the available options to keep this project under an active post
construction stormwater permit. Since a renewal application has not been submitted a minimum of 180
days prior to this expiration date,please proceed with one of the following options:
1. Apply for and receive a permit through the standard permitting process by submitting for
review a new application package that includes but is not limited to:
a. a new Permit Application Form(SWU-101)
b. a$505.00 fee
c. a completed Supplement-EZ form
d. a recorded or completed O&M-EZ form
e. as-built plans and calculations for any completed SCMs
f. the full or partial designer certifications for any SCMs or project areas that have
been completed(per Permit Condition 3.e)
g. a completed rescission form to be acted upon once the new permit is approved.
The various required forms can be found on the Post-Construction section of the website:
deq.nc.gov/SW .
2. If construction has not started and there are no longer plans to construct the project such
that a permit is no longer needed,please submit a permit rescission request form,which can
be found on the Post-Construction section of this website.
North Carolina General Statutes and the_Stormwater rules require sites that have started construction to
remain covered under an active post construction stormwater permit. Failure to maintain a permit subjects
D E Q�� North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612
NORT CAROLI+
D ^dm,tai�Iw6m'el ou.Z 919.707.9200
the owner to enforcement action as set forth in NCGS 143 Article 21, including the assessment of civil
penalties of up to $25,000 per day. Any enforcement actions taken by the Division will consider the
status of construction as well as any applications submitted for review.
If you have any questions regarding this matter,please contact Jim Farkas in the Central Office at
jim.farkas@deq.nc.gov or(919) 707-3646.
Sincerely,
fLO- ae &
xDouglas R. Ansel, Interim Direction
Division of Energy,Mineral and Land Resources
/jf \\\WaterResources\DEMLR-Stonnwater\SW Permits\SWA000041
cc:
Warren M.Sugg,PE;Civil Design Concepts,PA
Asheville Regional Office Stonnwater File
D Q
'D North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612
NORTH ZOLINA
oaP.ro,remm�n��m,�u.iKV /"� 919.707.9200