Loading...
HomeMy WebLinkAboutWI0700012_Monitoring (Report)_20230906 (2)dutrien- CERTIFIED MAIL August 31, 2023 NC Division of Water Resources Groundwater Resources Section Attn: Michael Rogers 1636 Mail Service Center Raleigh, NC 27699 Subject: Underground Injection Control Program Quarterly Groundwater Monitoring Report May 2023 — July 2023 Injection Well Permit #WI0700012 PCS Phosphate Company, Inc.l Tank Farm Remedial Action System Dear Mr. Rogers, DECEIVED SEP 06 2023 NO DEq/DWR Central Office Please see attached for the groundwater monitoring report associated with Injection Well Permit #W10700012 and the Tank Farm Remedial Action Plan. This report includes the sampling and reporting requirements of the above referenced permit as well as the reporting requirements of the Tank Farm Remedial Action Plan. Enclosed are a) piezometer level monitoring field sheets, b) the operation and maintenance reports. Please do not hesitate to contact me at (252) 617-5374 if you have any questions regarding this information. Sincerely, ��++ �� d�,i,-E�rn�- l.U.��ia. Brittany Curtis Environmental & Technical Services Specialist Nutrien — Aurora Attachments PC: 12-07-02 (w/ attach) ec: J.C. Stroud T. E. Herring J. A. Casey H. B. Mills 1530 NC Hwy 306 South, Aurora, NC USA 27806 1 Effective January 1, 2018, PCS Phosphate Company, Inc. is an indirect subsidiary of Nutrien Ltd. PCS Phosphate Company, Inc. remains the legal operating entity and permittee. nutrien.00m RECEIVED SEP 06 2023 NC DEQ/DWR PCS PHOSPHATE - TANK FARM REMEDIAL ACTION PLAN Central Office QUARTERLY OPERATIONAL AND MAINTENANCE REPORT FOR THE INJECTION AND WITHDRAWAL WATER WELLS May 2023 — July 2023 The Tank Farm Remediation System consists of a series of seven- (7) injection water wells located on the south side of the Tank Farm Area and a series of fourteen (14) withdrawal water wells located on the north side of the Tank Farm Area. Infection Water Well Svstem The injection water well system is operated with mine depressurization water (DPW). Daily operational data is collected by the Shipping Department and reported to the Environmental Affairs Department. The total monthly and quarterly volumes of water injected as well as the month end water level in the Water Level Control Tank are: DPW WATER GALLONS TOTAL GALLONS AVERAGE GPM TANK LEVEL FEET, MSL May 258,857 258,857 5.8 6.4 June 234,082 234,082 5.2 6.3 July 232,720 232,720 5.2 5.5 TOTALS 725,659 725,659 1 =�l Withdrawal Well Svstem The withdrawal water well pumps are monitored daily by the area Maintenance Department and preventative maintenance work is performed as needed. The total monthly and quarterly withdrawal water volumes for the period are: SAND FORMATION GALLONS CROATAN FORMATION GALLONS TOTAL GALLONS AVERAGE GPM May 491,558 585,800 1,077,358 13.1 June 743,212 486,598 1,229,809 11.3 July 285,448 472,099 757,547 10.6 TOTALS 1,520,217 1,544,497 3,064,714 2 Operation Notes: 5/24/2023: Pump Stuck in well casing. 7/2/2023: Changed Filter Nutrien - Tank Farm Remediation System Quarterly Monitoring Date: 7 - o. (o - a 3 Time: 0 .3o _ File:12-07-02 Tech: ( ; H R ; S uRP t•! ) RECEIVED System Gauge Pressures SWW-1 NIA SWW-7 N/A CWW-1 NIA CWW-7 NIA SEP 06 2023 NC DEQ/DWR Central Office Ditch 12.91 Barge Slip 10.59 . 0 Water Level Control Tank ! j_ 3 </ %=MSL Sand Layer Peizometers Level Indicators Well ID TOC Elevation MSL' TOC Sic Wtr Level Level Relative To MSL Ft. Well ID TOC Elevation MSL' TOC Sic Wtr Level' Level Relative To MSL Ft. S z-1 10.47 3. 1 7 C z-1 10.51 IS-6 '" S z-2 11.21 (0 • 1 . p C z-2 10.25 /, v S z-3 11.87 '} . -] % z-3 11.43 13 .43216. O 0 S z4 11.45 . O CPW 10.67 1 �• 4 . GPS S ,z-5 11.45 9. 10 3-0- 5 MWTF-1A ` 14.35 . S 0 • So Spz-6 11.23 10. 0 • 7 7Q MWTF-1B ` 14.36 S z-7 11.59 1 - I. L+ MWTF-1C' 14.44 1 . g S z-8 11.57 G .7 4-9,5 MWTF-2A 14.05(.-47 S -9 11.66 3 •'70 MWTF-2B 14.02 .3 S z-10 12.16 . MWTF-2C 9.82 '8,7(o . (a SPW 11.00 % 0 t0 . 6 0 MWTF-3A 12.21 3. 4 8 , i (p MWTF-3B 12A8 r7-517 p1 a0 MWTF-3C 12.19 6 • 48