Loading...
HomeMy WebLinkAboutNCG050280_Rescission Insp Rpt_20230919 Compliance Inspection Report Permit:NCG050280 Effective: 06/01/23 Expiration: 05/31/28 Owner: Berry Plastics Corporation SOC: Effective: Expiration: Facility: BPRex Healthcare Packaging, Inc. County: Nash 6941 Corporation Pkwy Region: Raleigh Battleboro NC 27809 Contact Person:Chris Gettings Title: Phone: Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 09/19/2023 Entry Time 01:55PM Exit Time: 02:45PM Primary Inspector:Thaddeus W Valentine Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG050280 Owner-Facility:Berry Plastics Corporation Inspection Date: 09/19/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: The facility is in the process of closing permanently and is dismantling equipment and moving everything out. Chip Gaynor ((919)675-8392 chipgaynor@berryglobal.com), who applioed for a stormwater permit rescissiomn, was on site. There were a number of issues found that will prevent the rescission from being approved. They are: There is a large petroleum stain on the asphalt and adjacent grassed area on the East side of the building where a roll off dumpster was stationed. This will need to be cleaned up and disposed of properly.and documented as is required by their permit. There is a large area of black powdery stains at the South side loading docks that will need to be cleaned up, disposed and document who cleaned it up when and where was it dosposed. There are drums, tanks and poly tanks inside the building that will need to be disposed of with documentation. There is an indoor drain pit that will need to be cleaned out professionally and the bulk and liquids disposed of and documented.Glycol is one of the chemicals used on site. There are 3) large silos that held resin on site that will need to be cleaned out professionally and document when did who cleaned it what and how much of that was disposed of where. There is a shipping container located outside of teh building on teh East side that will need allthe hazardous waste removed and documented. The secondary containment in the shipping container is covered in hazardous waste that will need to be cleaned out and disposed of before it leaves the site. This will need to be documented. The rescission request is not recommnded and the facility is advised to reapply for the rescission once everything has been cleaned out and cleaned up. Page 2 of 3 Permit: NCG050280 Owner-Facility:Berry Plastics Corporation Inspection Date: 09/19/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: In order Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: in order Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ 0 ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: In order Page 3 of 3