Type of Visit: ompliance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ,D-Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: 0 County:
Farm Name: �! dzz±6 p-�� ! Owner Email:
Owner Name: Q&1%aAAD 44c° Phone:
Mailing Address:
Physical Address:
Facility Contact: �n���itle:
Onsite Representative:
CI
Certified Operator: / ' 621WIVZ.1f011 ;6u,
Back-up Operator:
5�Region• L7`F--U
Phone:
Integrator:�4LC�G 7 �/
Certification Number: 5 ✓ �,Y
Certification Number:
Location of Farm: Latitude: Longitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes,e'Fo ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes _EE['No ❑ NA ❑ NE
❑ Yes —Eff No ❑ NA ❑ NE
Page I of 3 511212020 Continued
Facility Number:7 Date of Inspection: / i3
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Ee-No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):_
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes 0'No
❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes -E�No
❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes e-No
❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes ,❑-No
❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes �No
❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes "8 No
❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes F;TNo
❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals
(Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): Gez,i " fL'&O rm
i
13. Soil Type(s): t -, 114,6 G l5 4
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes -0 No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes -❑' No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes &No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes ❑ No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes gNo
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists El Design ❑Maps ❑LeaseAgreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [E�No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes 1:�'No
❑ Yes [3I4O
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: -
Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes -En No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ,EjNo ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes allo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes J: jNo ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes E]-No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes ErNo ❑ NA ❑ NE
❑ Yes �allo ❑ NA ❑ NE
❑ Yes ]EI—No ❑ NA ❑ NE
32. Were any additional problems noted which cause non-compliance of the permit or CAWNIP?
❑ Yes
D No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
EFNo
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
❑,No
❑ NA
❑ NE
�� n p a- J ,�%X /� � ,., �G�,(�eir�,�L �._¢1,�`22,i^7�� �'_ / G•'�j �
Reviewer/Inspector Name:
Phone: q!C> 15'35— 9 79
Reviewer/Inspector Signature:
Date: 4FI,-
Page 3 of 3 511212020
FAOILITY#: V d-,� FARMNAME: LAGOON LEVEL
PERMIT (M9)
- DUE EVERY 5 YEARS C/
- - EXPERIATION DATE NUMBER OF ANIMALS
. Apyq
- CURRENT NUMBER OF ANIMAL
- OIC CARD YES OR NO
WASTE UTILIZATION PLAN (WUP) (#20)
SOILTYPES
CROP TYPES
- ODOR CONTROL CHECKLIST YES OR NO
- Irrigation Plan Maps YES OR NO
WASTE REPORT (#21)
-GOOD FOR
'6/0/DAYS BEFORE OR AFTER /
DATE a/<N/ �� NITROGEN LEVEL ,. a %
DATE /C6/ c// NITROGEN LEVEL 7 U
DATE NITROGEN LEVEL �9, � � 1---9-0
(FSOOIL REPORT (*21)
- EVERY 3YEARS: DATE `/ 12-,;?
- P-1 (NO MORE THEN 400) t
- PH (Noteif4orles )
- Cu/ZN (NO MORE THEN 3000) CU ZN
(IF PEANUTS NO MORE THEN 300)
IRR2 (#2 )
Not over PAN CROP TYPES
FLOW
NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGE N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
CALBRIATION (ma)
- EACH REEL SHOULD BE CALI R�RATE 2EVERY OTHER YEAR
- DATE OF CALIBRATION
- FLOW RATES L 66
RAIN FALL (#21)
-INITIAL AFTER 1" RAIN EVENT
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED.
ZI
OZ SLUDGE(#21&26)
-DUE EVERY YEAR: DATE f�
O: 4/%. P: 3 "5 % RATIO OF SLUDGE
O: P: �( % RATIO OF SLUDGE
—
O: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
OTHER FORMS (u22 AND #21)
RAIN BREAKER FORM CROP YEILDS MORTALITY.
*If fields are grazed there will be no crop yields
VISUAL CHECK
FOUNDATION OR PIT LEAKS _ PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE
AREASTREES OR GRASS NEED TO BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT
CROPS NO PONDING REELS_ FEED BINS_ LAGOON GARBAGE
Bermuda grass: Opens March 1st- Ends September 30t
Small Grain Over seed: Opens October 1n-Ends March 31st
Corn: Opens February 15t - Ends June 30w
Cotton: Opens March 15ffi - Ends August 1st
Rye: Opens September IA- Ends March 31 st
Oats: Opens September 1-f- Ends April 15u Wheat: Opens September 1st - Ends April 30*
Soybeans: Opens April 1-t- Ends September 15t -
Fescue: Opens August 1st- Ends July 31�
Sorghum Hay: Opens March 15t^ - Ends August 31 st