Loading...
HomeMy WebLinkAboutSWA000028_NOD_20230920 o t c STATE pp� NI. 1i.3 ROY COOPER J Governor ELIZABETH S.B1SER *tom I1.n� Secretary WILLIAM E.TOBY VINSON,A NORTH CAROLINA Interim Director Environmental Quality September 20,2023 CERTIFIED MAIL 70191120 0002 0066 3491 RETURN RECEIPT REQUESTED The Farm at Mills River ATTN: Billy Taylor 1005 Cane Creek Road Fletcher,NC 28732 Subject: NOTICE OF DEFICIENCY NOD 2023-PC-0231 Fast Track Authorization to Construct Permit No. SWA000028 Nesbitt Farms Subdivision—Phase 1 Henderson County Dear Mr. Taylor: On September 14,2023,the Division of Energy,Mineral and Land Resources(DEMLR)conducted a review of permit file for the subject project to determine compliance with Stormwater Management Permit Number SWA000028 issued on August 2, 2018. DEMLR file review found that the site is not in compliance with the terms and conditions of this permit, issued pursuant to the requirements of the stormwater rules, 15A NCAC 2H.1000. As indicated,the following deficiencies must be resolved: 1. Failure to comply with permit requirements and operatinz without an active permit. Permit Conditions 3.d and 3.e and 15A NCAC 02H.1043(1)(c), .1043(5): The Fast Track Authorization to Construct(ATC)permit issued for this site expired on August 8,2023. Per the cited Permit Condition 3.d, a complete renewal application was required to be submitted at least 180 days prior to the expiration date,however,a renewal application was never submitted within this timeframe. Letters reminding you of this expiration date were sent on December 20,2022 and February 8,2023 and advised of your obligations under this permit as well as the available options to keep this project under an active post construction stormwater permit. Furthermore, per Permit Condition 3.e,the expiration of the ATC permit is considered a compliance issue and therefore disqualifies the project from the Fast Track program per 15A NCAC 02H.1043(1)(c). In order to address this deficiency, an application package was received on August 3,2023 and is currently under review to ensure the requirements of the post construction stormwater program have been met such that a new permit can be approved. In order to address this deficiency, one of the following two options must be submitted: 1. A complete application package must be submitted through the standard permitting process to ensure this site is covered under an active post construction stormwater permit. The application package must include but is not limited to: a. a new Permit Application Form(SWU-101) b. a$505.00 fee c. a completed Supplement-EZ form d. a recorded or completed O&M-EZ form e. as-built plans and calculations for any completed SCMs f. the full or partial designer certifications for any SCMs or project areas that have been completed(per Permit Condition 3.e) North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORTH CAgOLIN� � oewnmotaw�m a.nry 919.707.9200 g. a completed rescission form to be acted upon once the new permit is approved. The various required forms can be found on the Post-Construction section of the website: deq.nc. ovg /SW. 2. If construction has not started and there are no longer plans to construct the project such that a permit is no longer needed,please submit a permit rescission request form,which can be found on the Post-Construction section of this website. This Office requires that you respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address.Your response must include a written Schedule of Compliance that outlines the actions you will take to correct the deficiency(ies)noted above and identified in the attached inspection report and a timeline for completion of those actions. The Schedule of Compliance must include the following: • Permit Application Timeline. An agreement to respond to all notices or requests for additional information within 30 days and to continue efforts to ensure new permit is obtained. • Status of Construction. A detailed explanation of the construction status,including timeline for SCMs to be finalized,the construction of built-upon area, and project completion. Please also provide confirmation that the site is following their erosion and sediment control plans and construction stormwater plans. • As-Built Documentation. An explanation of the efforts that will be made to provide the required as-built plans and calculations for the SCMs and full or partial certifications for the any SCMs or project areas that have been completed(per Permit Condition 3.e). If we do not receive your Schedule of Compliance within 30 calendar days of receipt,you will be in violation of 15A NCAC 2H.1000 and NC General Statute 143-214.7,which could result in the initiation of enforcement action and may include recommendations for the assessment of civil penalties up to $25,000 per day for each violation pursuant to N.C.G.S. 143-215.6A. Please reference the State assigned project number on all correspondence. Should you have any questions regarding these matters,please contact Jim Farkas in the Central Office at postconstructiongdeq.nc.gov or at 919-707-3646. Sincerely, Mike Lawyer, CPSWQ, Stormwater Program Supervisor Division of Energy,Mineral and Land Resources DES/jf: \\\WaterResources\DEMLR—Stormwater\SW Permits\SWA000028 cc: Matthew C.Kirchner,PE;Eagle Engineering Jesse M.Gardner,PE; Civil Design Concepts,P.A. Mooresville Regional Office Stormwater File