Loading...
HomeMy WebLinkAboutSW3230301_Calculations_20230919 Kerns Ridge vM I IJ1 CREED PROJECT NO.: 08433-0001 = C DATE: 09/19/22 T.M.: JCB REVISED: 09/19/23 P.M.: JCB I WET POND#1 CALCULATIONS I DESIGN OBJECTIVE Avret pond shall be designed to capture the design stoma and release it slowly over a period of two to five days via a properly designed outlet structure.The first outlet in the structure is designed to be above the bottom of the pond,thus creating a permanent pool of water.Stomnvater shall have an adequate flowpath to bring about removal ofTSS through dilution and settling.The pond shall be designed in a manner that protects the device,the areas around the device and the receiving stream from erosion.The pond also must be maintained properly to prevent the resuspension of captured sediments. SITE CHARACIERISTICS Drainage Area 416,869 ft2 Post-development impervious area 171,150 ft2 Post-development impervious percentage 41% Design rainfall depth 1.0 in DESIGN VOLUME Mnumun volume required 14,556 113 3630 x rainfall depth x drainage area x(0.05+0.9 x impervious percentage) Volume provided 15,534 113 See Stage-Storage table below ELEVATIONS Temporary pool elevation 713.50 find Permanent pool elevation 712.50 find Top of 6ft vegetated shelf elevation 713.00 find Bottom of61i vegetated she lfelevation 712.00 find Sediment cleanout,top elevation(bottom of pond) 708.00 find Sediment cleanout,bottom elevation 707.50 find Sediment storage depth provided 0.5 ft SURFACE AREAS Temporary pool area 16,998 ft2 See Stage-Storage table below Main pool area REQUIRED 7,462 ft2 SA/DAratio x Drainage Area Nhin pool area PROVIDED 11,360 ft2 See Stage-Storage table below SA/DAratio 1.79 From SA/DAtable for Piedmont/Nbuntains(50%impervious,3.0 feet average depth) Bottom of vegetated shelf area 10,332 ft2 See Stage-Storage table below Bottom of main pool area 5,412 ft2 See Stage-Storage table below VOLUMES Temporary pool volume 15,534 113 See Stage-Storage table below Msin pool volume 34,339 113 See Stage-Storage table below Forebay volume 5,370 113 See Stage-Storage table below Forebay%of Min pool volume 15.64% OK Kerns Ridge v M I I u1 CREED PROJECT NO.: 08433-0001 = C DATE: 09/19/22 T.M.: JCB REVISED: 09/19/23 P.M.: JCB WET POND#1 CALCULATIONS 1 - MAIN POOL STAGE-STORAGE TABLE Elevation Area(sfl Area Volume Volume (msl) (ac) (cu-11) (ac-it) 708.00 4937 0.1133 0 0.0000 709.00 6084 0.1397 5495 0.1261 710.00 7297 0.1675 12170 0.2794 711.00 8570 0.1967 20087 0.4611 712.00 9537 0.2189 29127 0.6687 712.50 11360 0.2608 34339 0.7883 FOREBAY STAGE-STORAGE TABLE Elevation Area(sfl Area Volume Volume (msl) (ac) (cu-ff) (ac-it) 709.50 1305 0.0300 0 0.0000 710.00 1458 0.0335 690 0.0158 711.00 1783 0.0409 2306 0.0529 712.00 2133 0.0490 4259 0.0978 712.50 2317 0.0532 5370 0.1233 TENPORARYPOOLSTAGE-STORAGE TABLE Elevation Area(sfl Area Volume Volume (nisi) (ac) (cu-ff) (ac-it) 712.50 14189 0.3257 0 0.0000 713.00 15517 0.3562 7417 0.1703 713.50 16998 0.3902 15534 0.3566 S A/DA TABLE DATA Coastal SA/DAtable used? N Mbuntains/Piedmont SA/DAtable used? Y SA/DAratio 1.79 From SA/DAtable for Piedmont/Mountains(50%impervious,3.0*et average depth) Average depth 3.02 ft IVhln pool volume/Ain pool surface area DRAWDOWN CALCULATIONS Diawdown through orifice? Y Diairrter of orifice(if circular) 2.00 in Area of orifice 0.02 ft2 Coefficient of discharge(CD) 0.60 (witless) Diving head(1-10) 0.33 it Design volume drawdown time 2.96 days OK draws down in 2-5 days.