HomeMy WebLinkAbout090126_30 day poa_20230906PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9-126 County: Bladen Facility Name: Jessup #2 Certified Operator Name: Brandon Norris Operator Number 1004381 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 Y 31 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste 9/5/2023 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. RH Jessup Swine Farms, Inc Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) 910-862-4549 9/6/2023 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 835.2 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 835.2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1092 1A Coastal Bermuda 2.75 259.73 714.3 Mar -Oct 10921 1 B Coastal Bermuda 1.79 259.73 464.9 Mar -Oct 1092 2A Coastal Bermuda 5.51 259.73 1431.1 Mar -Oct 1092 2B Coastal Bermuda 4.96 259.73 1288.3 Mar -Oct 1092 3A Coastal Bermuda 5.51 259.73 1431.1 Mar -Oct 1092 3B Coastal Bermuda 3.10 259.73 805.2 Mar -Oct 1092 4A Coastal Bermuda 4.69 259.73 1218.1 Mar -Oct 1092 4B Coastal Bermuda 1.38 259.73 358.4 Mar -Oct 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 7711.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 835.2 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 7711.4 lb. PAN y. Overall PAN balance (w - x) _ -6876 lb. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 11 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 31.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 32.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 111784 ftz e. line c/12 x line d x 7.48 gallons/ft3 69679 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 169620 ft3 h. current herd # 5145 certified herd # 5145 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 6/5/2023 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 169620 ft3 0 ft3 70933 ft3 299889 gallons 2.26 Ibs/1000 gal. 835.2 Ibs. PAN PoA (30 Day) 2/21/00