Loading...
HomeMy WebLinkAbout20150745 Ver 1_More Info Letter_20150814NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor August 14, 2015 Certified Mail Return Receipt Requested 7012 1640 00019605 9168 Fuller Land Development Attn: Alex Capps 8801 Fast Park Dr.; Ste. 301 Raleigh, NC 27617 Subject: REQUEST FOR ADDITIONAL INFORMATION North Grove Subdivision Dear Mr. Capps: Donald R, van der Vaart Secretary DWR #15 -0745 Wake County On August 5, 2015, the Division of Water Resources (Division) received your application dated July 24, 2015 requesting a Riparian Buffer Authorization from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until the following information is received: 1. Provide the project boundary on a USGS 1:24,000 topographic map and most recent published county soil survey. [15A NCAC 02H .0502(b)] 2. The application states that the Division did an on -site stream determination on May 2, 2013. The letter and maps generated from this site visit from the Division need to be included with this application. A search of our stream determination database to try and locate this letter did not reveal anything called North Grove Subdivision or Berkshire at Millbrook. [15A NCAC 02B .0233(8)(b)(iv)] 3. Submit a Level Spreader Supplemental Form with all required items including the stormwater calculations and length of the level spreader. Detailed drawings should also be included on the plans for the level spreader and bypass channel. In addition, an Operation and Maintenance Agreement that is signed and sealed by a professional Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http: / /portal.ncdenr.org /web /wq /aps 1628 Mail Service Center, Raleigh, NC 27699 -1628 Phone: (919) 791 -4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788 -7159 An Equal Opportunity 1 Affirmative Action Employer — Made in part by recycled paper North Grove Subdivision DWR# 15 -0745 On -Hold engineer should be submitted. These forms can be found on the Division of Energy, Mineral and Land Resources' website in the Best Management Practices Manual. [15A NCAC 02B .0233(5)] Pursuant to Title 15A NCAC 02H .0502(c) and Title 15A NCAC 02B.0233 (8), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending four copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699 - 1617. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity. Please contact Cherri Smith at 919 - 791 -4251 or cherri.smith@ncdenr.gov if you have any questions regarding the application and Jason Robinson at 919 - 791 -4249 or Jason.t.robinson @ncdenr.gov if you have any questions regarding the level spreader comments. Si ere , Danny Smith Supervisor, Water Quality Regional Operations Section cc: DWR RRO 401 /Buffer Authorization file DWR 401 & Buffer Permitting Unit file Andrew Petty; The Curry Engineering Group; 205 S. Fuquay Ave.; Fuquay- Varina, NC 27526