September 19, 2023
Smyrna Ready Mix Concrete, LLC
Attn Jeff Hollingshead, CEO
1000 Hollingshead Circle
Murfreesboro,TN 27129
Subject: Compliance Evaluation Inspection
NPDES General Stormwater Permit NCG140135
Ready Mix Concrete Jacksonville Plant 49
Onslow County
Dear Mr. Hollingshead:
On September 7, 2023, Brian Lambe from the Wilmington Regional Office of the Division of Energy, Mineral, and
Land Resources(DEMLR),conducted a compliance evaluation inspection SRM Ready Mix Concrete Jacksonville
Plant 49. The site drains to Sandy Run Branch,which is currently classified as Class SC, NSW Waters in the White
Oak River Basin.
The following observations were noted during the DEMLR inspection (please see the attached addendum for
additional information about your permit):
1)Stormwater Pollution Prevention Plan(SPPP)
A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded,and properly implemented.
The copy of the SPPP onsite was not updated as required by permit.
2)Qualitative Monitoring
Qualitative monitoring has been conducted and recorded in accordance with permit requirements.
3)Analytical Monitoring
Analytical monitoring has not been conducted and recorded in accordance with permit requirements.
2022 produced no flow results for two sampling periods.2022 should have had three total sampling periods
due to new permit and change to quarterly sampling. During inspection,the pond,outfall 2 was overgrown
and could not locate outfall.
Request reinspection. Please contact this office immediately to schedule an inspection with Brian Asberry and
Quinn Vaughan onsite.
Thank you for your assistance and cooperation during this inspection. Please be advised that violations of the
NPDES Stormwater General Permit may be subject to a civil penalty assessment of up to$25,000.00 per day
for each violation. If you have any questions,comments,or need assistance with understanding any aspect of
your permit, please do not hesitate to contact Daniel Sams or me at 910-796-7215 or brian.Lambe@ncdenr.gov
Sincere)
!,,
Bria Lambe
vironmental Specialist
Land Quality Section
Cc: Brian Asberry and Quinn Vaughan via email
D_E QZ� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
06
/ Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405
^�*^^�—\ / 910.796,7215
Compliance Inspection Report
Permit:NGG140135 Effective: 07/01/22 Expiration: 06/30/27 Owner: Smyrna Ready Mix Concrete LLC
SOC: Effective: Expiration: Facility: Jacksonville-Plant 20014
County: Onslow 222 Bell Fork Rd
Region: Wilmington
Jacksonville NC 28540
Contact Person:Jim White Title: Phone: 615-355-1028
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 09/07/2023 Entry Time 12:45PM Exit Time: 01:30PM
Primary Inspector:Brian P Lambe Phone:
Secondary Inspector(s): V
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NGG140135 Owner-Facility:Smyrna Ready Mix Concrete LLC
Inspection Date: 09/07/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary.
Please schedule a reinspection with this office.
Met with David, but Brian Asberry is the plant manager, not onsite. Quinn Vaughn is the SRM environmental manager.
SPPP incomplete.
Sampling incomplete.
Page 2 of 3
Permit: NCG140135 Owner-Facility:Smyrna Ready Mix Concrete LLC
Inspection Date: 09/07/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑
#Does the Plan include a General Location (USGS)map? 0 ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑
#Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑
#Does the Plan include a BMP summary? 0 ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan(SPRP)? ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
#Is the Plan reviewed and updated annually? 0 ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑
Comment: SPPP must be updated regularly according to the permit
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring? ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: 2022 documented no flow for two sample periods New permit took effect July 1 2022 requiring
quarterly sampling Unclear on sample location Pond is overgrown could not locate box outlet
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ 0 ❑ ❑
#If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑
Comment: SPPP not updated Wick discharges not documented
Could not locate Dond discharge point
Page 3 of 3