HomeMy WebLinkAboutNCG140021_Inspection_20230907 dM STAg�'
ROY COOPER
Governor
ELIZABETH S.BISER
Secretary
WILLIAM E. TOBY VINSON, Jr. NORTH CAROLINA
Interim Director Environmental Quality
September 19, 2023
S&W Ready Mix Concrete Company, LLC
Attn Hank Gay
PO Box 872
Clinton NC 28329-0872
Subject: Compliance Evaluation Inspection
NPDES General Stormwater Permit NCG140021
S&W Pender County Burgaw Facility
Onslow County
Dear Mr. Gay:
On September 7, 2023, Brian Lambe from the Wilmington Regional Office of the Division of Energy, Mineral, and
Land Resources(DEMLR),conducted a compliance evaluation inspection S&W Pender County Burgaw Facility
located in 3464 US Highway 117 S, Pender County, North Carolina. The site drains to Pike Creek,which is
currently classified as Class C,Sw Waters in the Cape Fear River Basin.
The following observations were noted during the DEMLR inspection (please see the attached addendum for
additional information about your permit):
1)Stormwater Pollution Prevention Plan(SPPP)
A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded,and properly implemented.
2)Qualitative Monitoring
Qualitative monitoring has been conducted and recorded in accordance with permit requirements.
3)Analytical Monitoring
Analytical monitoring has not been conducted and recorded in accordance with permit requirements.
No sampling events have been recorded via eDMR. Mr Gay reports he has registered but has not uploaded
data.
Thank you for your assistance and cooperation during this inspection. Please be advised that violations of the
NPDES Stormwater General Permit may be subject to a civil penalty assessment of up to$25,000.00 per day
for each violation. If you have any questions,comments, or need assistance with understanding any aspect of
your permit, please do not hesitate to contact Daniel Sams or me at 910-796-7215 or brian.Lambe@ncdenr.gov
re ,
Br' n Lambe
nvironmental Specialist
Land Quality Section
xoa,x p E Q`J/ North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
_/v Wilmington Regional office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405
�—2-M—" 'W \ 910.796.7215
Compliance Inspection Report
Permit:NCG140021 Effective: 07/01/22 Expiration: 06/30/27 Owner: S&W Ready Mix Concrete Company LLC
SOC: Effective: Expiration: Facility: Pander County- Burgaw Facility
County: Pander 3464 US Hwy 117 S
Region: Wilmington
Burgaw NC 28425
Contact Person:Hank Gay Title: Phone:910-592-0180 Ext.4
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 09/07/2023 Entry Time 09:30AM Exit Time: 10:15AM
Primary Inspector:Brian P Lambe q / Phone:
Secondary Inspector(s): C`,/J���)-
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG140021 Owner-Facility:S&W Ready Mix Concrete Company LLC
Inspection Date: 09/07/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The S &W Burgaw plant was inspected on on 9/7/2023 with Brian Lambe representing NCDEMLR and Hank Gay
representing S &W Ready Mix. The plant supervisor is Steve Grover. The plant currently operates intermittently, around
20% of the time.
There is a stormwater pond on the north rear corner of the property. The pond water appears to be very clean. The south sidt
was recently mowed. The north side has trees and bushes, but provide privacy and visual screening for the plant.
THe SPPP has Feul Storage and spill protection section documenting no spills.
The monthly site inspection documents the site conditions and SPPP requirements per permit
An annual inspection is conducted as well.
Recycle system is operated onsite. The system did not overflow during recent hurricane 8"of rain.
Employee Training conducted on 2/27/2023.
DAQ permit 05819R09 is in compliance.
Page 2 of 3
Permit: NCG140021 Owner-Facility:S&W Ready Mix Concrete Company LLC
Inspection Date: 09/07/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? E ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? E ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ Q ❑
# Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment? ❑
#Does the Plan include a BMP summary? ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ El ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? ❑ ❑
#Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment:
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring?
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 El ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: Sampling results have not been submitted via eDMR.
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑
#Were all outfalls observed during the inspection? E ❑ ❑ ❑
#If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3