Loading...
HomeMy WebLinkAboutNCG140022_Inspection_20230907 STAtt K p Wb�n ROY COOPER Governor ELIZABETH S.BISER , Secretary WILLIAM E. TOBY VINSON, Jr. NORTH CAROLINA Intertm Director Environmental Quality September 19, 2023 S&W Ready Mix Concrete Company, LLC Attn Hank Gay PO Box 872 Clinton NC 28329-0872 Subject: Compliance Evaluation Inspection NPDES General Stormwater Permit NCG140022 S&W Onslow County Holly Ridge Facility Onslow County Dear Mr. Gay: On September 7, 2023, Brian Lambe from the Wilmington Regional Office of the Division of Energy, Mineral,and Land Resources(DEMLR),conducted a compliance evaluation inspection S&W Onslow County Holly Ridge Facility located in NC Hwy 50 W, Onslow County, North Carolina. The site drains to Flat Swamp,which is currently classified as Class C,Sw Waters in the Cape Fear River Basin. The following observations were noted during the DEMLR inspection (please see the attached addendum for additional information about your permit): 1)Stormwater Pollution Prevention Plan(SPPP) A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded,and properly implemented. 2) Qualitative Monitoring Qualitative monitoring has been conducted and recorded in accordance with permit requirements. 3)Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. No sampling events have been recorded via eDMR. Mr Gay reports he has registered but has not uploaded data. Thank you for your assistance and cooperation during this inspection. Please be advised that violations of the NPDES Stormwater General Permit may be subject to a civil penalty assessment of up to$25,000.00 per day for each violation. If you have any questions, comments,or need assistance with understanding any aspect of your permit, please do not hesitate to contact Daniel Sams or me at 910-796-7215 or brian.Lambe@ncdenr.gov Z Lnmental cialist Land Quality Section po"01111111, E QJ� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405 u 910.796.7215 Compliance Inspection Report Permit:NCG140022 Effective: 07/01/22 Expiration: 06/30/27 Owner: S&W Ready Mix Concrete Company LLC SOC: Effective: Expiration: Facility: Onslow County-Holly Ridge Facility County: Onslow NC Hwy 50 W Region: Wilmington Holly Ridge NC 28445 Contact Person:Hank Gay Title: Phone:910-592-0180 Ext.4 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 09/07/2023 Entry Time 11:OOAM Exit Time: 11:45AM Primary Inspector:Brian P Lambe Phone: Secondary Inspector(s): p Reason for Inspection: Comp am V Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140022 Owner-Facility:S&W Ready Mix Concrete Company LLC Inspection Date: 09/07/2023 Inspection Type:Compliance Evaluation Reason for Visit: Complaint Inspection Summary: Last yearly inspection by S&W 11/22/2022 Monthly inspections recorded. SPPP updated 12/22/2022 Training documented 3/12/2022 Complaint from adjacent landowners regarding dust and road condition. Complaint also reports continued problems with the facility being flooded during rain events. Emphasis on dust control furing dry periods and when trucks are operating has been reitterated. The flooded condition leads to muddy roads. S&W is considering reopening the secondary entrance to create a one way traffic pattern. The exit would be on concrete rather than the gravel entrance used currently, minimizing road sediment.Additional measures may be needed, such as sweeping the concrete or truck washdown, but that is to be determined. Page 2 of 3 Permit: NCG140022 Owner-Facility:S&W Ready Mix Concrete Company LLC Inspection Date: 09/07/2023 Inspection Type:Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ #Does the Plan include a General Location(USGS)map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? M ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ #Does the facility provide and document Employee Training? E ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ #Is the Plan reviewed and updated annually? ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? N ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: eDMRs not uploaded. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment. Page 3 of 3