Loading...
HomeMy WebLinkAboutNCG050222_Compliance_Inspection_Letter_20230919 ROY COOPER Governor ELIZABETH S.BISER Secretary ° qUAM WILLIAM E. TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality September 19,2023 Packaging Corporation of America Attn: Pete Anzenberger 1302 N Salisbury Ave Salisbury,NC 28144 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCG050000 Packaging Corporation of America Packaging Corporation of America, Certificate of Coverage NCGO50222 Rowan County Dear Mr.Anzenberger: On September 12, 2023, a site inspection was conducted for the Packaging Corporation of America facility located at 1302 N Salisbury, Rowan County,North Carolina. A copy of the Compliance Inspection Report is - enclosed for your review. John Ewald was also present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG050000 under Certificate of Coverage NCG050222. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Town Creek, class C waters in the Yadkin Pee-Dee River Basin. As a result of the inspection, the facility was found to be compliant with the conditions of the NCG050000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (704) 663-1699 or via e-mail at jerry.eplin@ncdenr.gov. Sincerely, Jerry W. Eplin,PE Assistant Regional Engineer DEMLR Enclosure: Compliance Inspection Report c: DEMLR NPDES Stormwater Permit Laserfiche File North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Mooresville Regional Office 1 610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115 704-663-1699 Compliance Inspection Report Permit:NCG050222 Effective: 08/22/23 Expiration: 05/31/28 Owner: Packaging Corp of America SOC: Effective: Expiration: Facility: Packaging Corporation OfAmerica County: Rowan 1302 N Salisbury Ave Region: Mooresville Salisbury NC 281448543 Contact Person:Joe Kenney Title: Phone:704-633-3611 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 09/12/2023 Entry Time 09:30AM Exit Time: 10:25AM Primary Inspector:Matthew J Gigante Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCGO60222 Owner-Facility:Packaging Corp of America Inspection Date: 0 911 2/2 02 3 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: A stormwater compliance inspection was conducted on September 12, 2023. The inspection was conducted alongside John Ewald with Packaging Corporation of America Salisbury facility. All portions of the stormwater pollution prevention plan were present and up to date. Monitoring data was present and completed per permit requirements.All outfalls were observed during the inspection with no visible issues noted. This inspection was also in part conducted to view the south side of the site in reference to a question raised by Packaging Corporation of America about sheet flow and if another outfall should be added. It was determined that the south area once designated as sheet flow, does not sheet flow. Stormwater from the south delivery docks,a small portion of the west(front) of the site, and some roof drains discharge from a point located at the building's south corner. It is recommended that this point be added as a sampling outfall. Page 2 of 3 Permit: NCG050222 Owner-Facility:Packaging Corp of America Inspection Date: 09/12/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ #Does the Plan include a General Location (USGS)map? 0 ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? E ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? E ❑ ❑ ❑ #Does the Plan include a BMP summary? 0 ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? 0 ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? N ❑ ❑ ❑ #Is the Plan reviewed and updated annually? E ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: All portions of the stormwater pollution prevention plan were present and up to date. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? E ❑ ❑ ❑ Comment: Qualitative monitoring data was present and being conducted per permit requirements. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? E ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ #Has the facility evaluated all illicit(non stormwater)discharges? E ❑ ❑ ❑ Comment: All outfalls were observed on site with no visible issues at the time of the inspection. Page 3 of 3