Loading...
HomeMy WebLinkAboutSW6230902_Design Calculations_20230913 Bowman N O R T H C A R O L I N A Erwin Road Residential 1504 Erwin Road Proposed Residential Development and Associated Infrastructure Dunn, North Carolina COORDINATES: 35°18'55.1"N, 78°38'22.2"W Project No.: 220124-01-004 Stormwater Management Report Prepared By: Bowman NO R T H CAROL IN A 4006 Barrett Drive, Suite 104 CA�V r �� Raleigh, NC 27609 tiQ�tisS/LJ PREPARED FOR: 4` BEAL ai gnat�a��titi Stout Land Development, LLC 1786 Metromedical Drive Matt Lowder, PE Fayetteville, NC 28304 NC License No. 24434 Ben Stout (919) 553-6570 (910) 779-0019 mlowder@bowman.com ben@benstoutconstruction.com AUGUST 18, 2023 TABLE OF CONTENTS Erwin Road Residential—Dunn, NC 1 1 P a g e Bowman Stormwater Management Narrative PAGE • Project Data 3 • Site History 3 • Project Description 4 • Design Requirements 5 • Methodology 5 • System Summary 6 • Conclusion 6 Appendix A: Figures 10 • Soil Report • Topography Map • FEMA Flood Map No. 3720150600J • Surface Water Classification Maps • Hydrologic Unit Code (HUC) • NOAA Point Precipitation Depth Estimates • NOAA Point Precipitation Intensity Estimates • Pre-Development Drainage Basin Map • Post-Development Drainage Basin Map • Wetlands Inventory Map Appendix B: Stormwater Wet Pond Calculations 12 • CN Values • Time of Concentration Calculations • Wet Pond — Design, Details, and Hydrographs • Grass Channels • Spread Calculations Appendix C: Storm Drainage System Calculations 13 • 100-System Appendix D: Erosion and Sediment Control Calculations 14 • Rip Rap Calculations • Skimmer Basin • Riser • Temporary Diversion Ditches Erwin Road Residential—Dunn, NC 2 Bowman a 04TII _w k 0 1 I .. STORMWATER MANAGEMENT NARRATIVE This report documents the hydraulic and hydrological analysis performed by Bowman Consulting for the proposed Erwin Road Residential site expansion in Dunn, North Carolina. The report consists of a review of available hydrologic data, methods analysis, development of existing and proposed hydraulic models, and presentation of the impacts of the proposed development in the project. PROJECT DATA Table 1:Site Information Project Name Erwin Road Residential Parcel Identification Number (PIN) 1506795869 Parcel Address 1504 Erwin Road River Basin Cape Fear Total Parcel Area 9.04 acres (± 393,826 SF) EXISTING 0 acres (±0 SF) Impervious Area PROPOSED 1.88 acres (±82,050 SF) Area of Land Disturbance 8.90 acres (± 387,684 SF) TMDLs None Watershed Protection Overlay None SITE HISTORY The proposed site is located in Dunn, North Carolina and is within City of Dunn limits. The site is located South of US HWY 421, West of Downton Dunn, and North of Erwin Road. The site is currently undeveloped wooded and open space area. Soils located within the project site as defined by NRCS (National Resources Conservation Service) are described in Table 2. Table 2:Hydrologic Soil Groups Group Description Bb Bibb soils, frequently flooded NoB Norfolk loamy sand, 2 to 6 percent slopes NoC Norfolk loamy sand, 6 to 10 percent slopes Erwin Road Residential—Dunn, NC 31 Bowman a 0 4 T I I .__w k 0 1 I ." The hydrologic soil group (HSG) designations for these soils are groups B, C, and D, respectively. Group B soils are described as coarse and having a moderate infiltration rate when thoroughly wet. This consists of moderately deep or deep and moderately well to well drained soils that have a moderate rate water transmission. Group C soils are defined as having a slow infiltration rate when thoroughly wet.These soils are fine and have a layer that impedes the downward movement of water. Group D soils are best described as having a very slow infiltration rate and high runoff potential when thoroughly wet. A Web Soil Survey Map for the site is included in Appendix A. For the purposes of design, the same hydrologic group was utilized for both Pre- and Post- Development conditions. PROJECT DESCRIPTION Stout Land Development, LLC is proposing to develop±8.90 acres of disturbed area within the 9.04-acre parcel. The proposed development consists of 27 houses each with a footprint of 1,230 SF, stormwater control measures, and associated pavement, including parking areas, driveways, and curbs. Watershed Protection Overlay Based on Harnett County GIS, the site is not located within a watershed protection area. Floodplains A portion of the Erwin Road parcel is located within Zone 'X' and 'AE', per the FEMA Panel 3720150600J located in Appendix A. No proposed fill will be placed in the floodplains. Because the post-developed conditions will not result in a net increase in runoff from the site, no adverse downstream impacts are expected to occur. DESIGN REQUIRMENTS Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual. Post-development rates for the site were designed to not exceed pre-development discharge rates for the 1-year, 2-year, 10-year, and 100-year twenty-four (24)-hour duration storm events. Stormwater quantity control will be provided by the use of a new wet pond and two grass channels as part of the development. Water Quality and Water Quantity Since the project site is located in the Cape Fear River Basin, the following criteria below was considered for the design of SCMs in regard to water quality and quantity: Erwin Road Residential—Dunn, NC 4 1 P a g e Bowman ,.017l� 1. 100% of all impervious and built-upon-area (BUA) will be treated by a stormwater control measure. 2. High density developments must manage and attenuate the first inch of runoff for water quality in an approved Stormwater Control Measure(s) (SCM). The peak flow rate of the first inch water quality volume from the SCM must also be shown to be less than the predeveloped peak rate for the 1 year-24-hour storm event. 3. The increase in the 1-inch design volume shall be released over a 2-to-5-day period. METHODOLOGY Hydrology and storm water modeling calculations were performed using the latest version of Hydraflow modeling software. Simulations were set up based on information provided within the North Carolina Department of Environmental Quality Stormwater Design Manual. The Soil Conservation Service (NRCS TR-55) hydrologic method was utilized for the estimation of stormwater runoff peak rates and the generation of hydrographs for the routing of stormwater flows. Input and results can be found summarized in tables throughout this report and in the appendices. SYSTEM SUMMARY The post developed design of the site has been laid out in such a way to provide a drainage area that will require stormwater management.The stormwater system is comprised of a singular SCM. The primary SCM is a stormwater wet pond that is fully sized for the design storm that utilizes a storm drain pipe network to collect runoff from impervious surfaces on the site. The SCM will also comprise of two grass channels that will collect any runoff from the green areas of the proposed site. CONCLUSION Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual. Post-development discharge rates for the site were designed to not exceed pre-development discharge rates for the 1-year, 2-year, 10-year.and 100-year,twenty-four(24)-hour duration storm events. Stormwater quantity control will be provided by the implementation of a new wet pond and two grass channels as part of the development. Erwin Road Residential—Dunn, NC 5 1 P a g e Bowman a 04TII _w k 0 1 I ,k Peak Runoff Analysis • Pre-Development Conditions The existing site is currently undeveloped wooded and open space area. There is one drainage area analyzed in this report with its own study point, composite runoff curve number and single point of analysis. SCM Pre-Developed Area covers a portion of the parcel at 8.74 acres (±380,520 SF) including the 20' easement for the existing sanitary sewer pipe. This area slopes generally from Southeast to Northwest, with average slopes in the range of 2-10% and consists of pervious area. The characteristics for the pre-development basin are shown below and the drainage maps can be found in Appendix A. Additional calculations for the basin can also be found in Appendix B. Table 5:Pre-Development Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] Pre-Developed Area 8.74 53.3 14.85 • Post-Development Conditions The post-development condition contains a single drainage area directed to the stormwater wet pond and one bypass drainage area from the pre-development condition. SCM Post-Developed Area consists of 5.05 acres (+220,108 SF) of the proposed residential houses, road, and other infrastructure required. The wet pond collects runoff with catch basins and drainage pipes that connect to the stormwater wet pond. The characteristics for the post-development drainage areas are shown below and calculations can be found in Appendix B. A drainage map identifying the basin can be found in Appendix A. Table 6:Post Development Area Summaries Area Composite Time of Basin ID Curve Concentration [acres] Number (CN) (Tc) [min.] SCM Post-Developed Area 5.05 73.8 5 Table 7:Post Development By-Pass Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] SCM Post-Developed Bypass Area 3.68 54.8 10 Erwin Road Residential—Dunn, NC 6 P a g e Bowman NORTH CAROLINA • Comparison of Peak Discharges The pre- and post- development peak discharges are shown below. Full calculations and hydrographs can be found on Appendix B. Table 8: Total Site Downstream Impact Wet Pond SCM Pre-Dev. Total Site Peak Flow Post-Dev. Total Site Peak Flow Storm Event (cfs) (cfs) 1-yr 24-hr 0.396 0.381 2-yr 24-hr 1.968 1.534 10-yr 24-hr 11.08 9.777 1 00- r 24-hr 1 33.28 1 33.04 Site Stabilization During construction phase, the permanent stormwater wetlands will be utilized as temporary sediment basins. Skimmers will be used in the temporary sediment basins to dewater the basin from the surface. After final grading is completed, permanent vegetation shall be applied in accordance with the seeding requirements from the NCDEQ and the landscape plan for this site. Erwin Road Residential—Dunn, NC 7 1 P a g e Bowman NORTH CAROLINA APPENDIX A Figures Hydrological Soil Report Topography Map FEMA Flood Map No. 3720150600J Surface Water Classification Maps Hydrologic Unit Code (HUC) Wetlands Inventory Map NOAA Point Precipitation Depth Estimates NOAA Point Precipitation Intensity Estimates Pre-Development Drainage Basin Map Post-Development Drainage Basin Map Erwin Road Residential—Dunn, NC 8 P a g e 3 Hydrologic Soil Group—Harnett County,North Carolina 3 m mN mm M M 714420 714470 714520 714570 714620 714670 714720 35°19 2"N 35°19'2"N orndalcPD Dr M 421 a M % 35°18'48"N 35°18'48"N 714420 714470 714520 714570 714620 714670 714720 3 3 m m Map Scale:1:2,150 W printed on A portrait(8.5"x 11")sheet " Meters N 0 30 60 120 180 Fe 0 100 200 400 600et Map projection:Web Mercabor Comer coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 U}DA Natural Resources Web Soil Survey 5/15/2023 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Harnett County,North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p C The soil surveys that comprise your AOI were mapped at Area of Interest(A01) 0 C/D 1:24,000. Soils D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons � A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil 0 A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed 0 B scale. Transportation 0 B/D Rails Please rely on the bar scale on each map sheet for map 0 C measurements. '.,,r Interstate Highways 0 C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts q distance and area.A projection that preserves area,such as the ® Aerial Photography Albers equal-area conic projection,should be used if more • A/D accurate calculations of distance or area are required. +'* B This product is generated from the USDA-NRCS certified data as B/D of the version date(s)listed below. x C Soil Survey Area: Harnett County, North Carolina Survey Area Data: Version 20,Sep 8,2022 0 C/D Soil map units are labeled(as space allows)for map scales r D 1:50,000 or larger. r Not rated or not available Date(s)aerial images were photographed: Apr 24,2022—May Soil Rating Points 9,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background p A/D imagery displayed on these maps.As a result,some minor B shifting of map unit boundaries may be evident. B/D UU� Natural Resources Web Soil Survey 5/15/2023 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Harnett County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Bb Bibb soils,frequently A/D 3.7 21.2% flooded NoB Norfolk loamy sand,2 to A 9.1 52.6% 6 percent slopes NoC Norfolk loamy sand,6 to A 4.6 26.2% 10 percent slopes Totals for Area of Interest 17.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. usDA Natural Resources Web Soil Survey 5/15/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Harnett County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.-None Specified Tie-break Rule: Higher uSDA Natural Resources Web Soil Survey 5/15/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 U.S. DEPARTMENT OF THE INTERIOR The National Map ERWIN QUADRANGLE ` U S G S U.S. GEOLOGICAL SURVEY ��+ Topo NORTH CAROLINA science for a changing world J I 7.5-MINUTE SERIES -78.7500' -78.6250° 35.3750° 705000M E 06 07 08 09 10 11 12 13 14 15 35.3750° ,s C� �O�O PELT OyURCy RO j �O TGP< CTD o 17 ThTorntO.ns �P�`�° W �o Q `. 5 II 0 3916000"N � e � ik_ �oo ; CHAPEL RD \ I � moo 0 0 `J iyCTo 16 -4► " '`,fit `` 3 1 ER.81N ti � ��v 100, 15 Mp1ROFtN - - 1.50 SON .� CADS STEVEN c�F o F 1 5 �G y� AVERY C 14 o ti0 14 � ttQy •- "� a +r a R 13 T/TgyRDBERTSRD �,Z,� AG •'- 217 j o�� ,j o`F,r`rp `rG \��`�J g � _ 13 'oo V� � 217 •� - 'ro J�� a / 2 .11v ` sT WKS•T ~ � � EKST ks0 BRyP � � ' Little R e'r o CRA AP�ErLN F Z E J S? e�!'O q'r�SF, ,�. 12 r sq` Rµ�N . s s Qd� EHST o 7po ti� 12 9P Q=s oF��M •.4 '.°° 6���y R° ,� W F ST j O,P ?o• 421 j - o w c sr ;� Erwin � r WBS? o BUNNL VEL ERWIN RD ti ya W CU,y18FR<A '+ .y RIVERVIEW RD ��5 0 � J QO o 11 BUNNLEV L ERWIN RD S13 0 Fp�� z 421 FA a G Z DON RON RD � v o v ')'Tj� OLD SILO LN '" 10 C a 10 8Ri 217 yG,pG, a [. m o � DGF gTERDR y 0 Z A-Nr{OCHC-HURC•M R-0 a AFC4,y A o 10 o� o MGINTYRE LN NORRIS RD v BAIT RD1 � NOEIDpV RD vy o�F �`T o A o•`, Ph USAN TART RD 09 vA EFERR ¢ v o OLD YLN R A C��� 09 0° so BYRDS MILL RD ' r . yp'HFRS L 08 08 217 .;\,. .�."" „ � gUMPAS LREEK p6G DDRMgNRD f00 � 1D0 00 82 y� 07 ;' -- ti� � v 0 �n 07 d n Q Q � _ 301 06 h° 06 D RD BEP - HORS SHOE 217 'oo QJ O 1 0 05 I{ 05 100 lea 7 Cemi rt y 1 82 04 r f vjtt�0 MP o Y`c301 p LOOP RD o —— HARN 450 v 3904000mN pIN 5T DYNgsryLN CUMi EBEB R N`�U—-— � G�EP I.L11Q1 11 1°0 0——�— W T "RNTON RD f;� �P.�1l1NS RD o — C•LERVIE DR ~ WOOD RD 35.2500° 05 06 07 08 09 10 11 12 13 14 15 71601 -78.7500° -78.6250' 35.2500' Produced by the United States Geological Survey nnN ' SCALE 1:24 000 ROAD CLASSIFICATION M rn North American Datum of 1983(NAD83) Expressway Local Connector C4 World Geodetic System of 1984(WGS84). Projection and N 1 0.5 0 KILOMETERS 1 2 NORM�-I u7 1 000-meter grid:Universal Transverse Mercator,Zone 17S AROL'MA Secondary Hwy _ Local Road This map is not a legal document.Boundaries may be 9°13 1000 500 0 METERS 1000 2000 Ramp 4WD 00 164 MILS generalized for this map scale.Private lands within government 1°20" �1 0.5 1 r`Y reservations may not be shown.Obtain permission before 24 MILS MILES •Interstate Route US Route O State Route entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION N Imagery.....................................................NAIP, May 2016 November 2016 FEET Roads......................................... U.S. Census Bureau, 2016 UTM GRID AND 2019 MAGNETIC NORTH o Names............................................................................GNIS,1980-2019 1 L1llington DECLINATION AT CENTER OF SHEET M(1)Hydrography...............................National Hydrography Dataset, 1899 - 2018 1 2 3 2 Coats � Contours.................... CONTOUR INTERVAL 10 FEET ...... ........National Elevation Dataset, 20 U.S.National Grid NORTH 3 Benson sour 7 Boundaries..............Multiple sources; see metadata file 2017 2018 AMERICAN VERTICAL DATUM OF 1988 100,000-m Square ID 4 5 4Bunnlevel (DO 5 Dunn Z Wetlands.................FWS National Wetlands Inventory 1983 This map was produced to conform with the ILL W OV National Geospatial Program US Topo Product Standard,2011. 6 Slocomb A metadata file associated with this product is draft version 0.6.18 6 7 8 8 Wade W Min go ERWIN NC tz W Grid Zone Designation ADJOINING QUADRANGLES Z Z 17S 2019 National Flood Hazard Layer FIRMette FEMA Legend 78o38'40"W 35o19'9"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT [ - WiAVBA99 Flood Elevation(BFE) Zone SPECIAL FLOOD With BFE or Depth zone AE,AO,AH,vE,AR HAZARD AREAS Regulatory Floodway 0.2%Annual Chance Flood Hazard,Areas of 1%annual chance flood with average depth less than one foot or with drainage areas of less than one square mile zone x 5y _ Future Conditions 1%Annual Chance Flood Hazard zonex Area with Reduced Flood Risk due to OTHER AREAS OF Levee.See Notes.zone x FLOOD HAZARD ��� Area with Flood Risk due to Leveezone D x. r Z NO SCREEN Area of Minimal Flood Hazard zonex Effective LOMRs '! +•,44-.IT•, ;:;a OTHER AREAS Area of Undetermined Flood Hazard zone n L i LOBE E 4 �• GENERAL ---- Channel,Culvert,or Storm Sewer STRUCTURES IIIIIII Levee,Dike,or Floodwall OM O` QE / Cross Sections with 1%Annual Chance 17•5 Water Surface Elevation SIT+ F DUI a- - - Coastal Transect PA4] �?� *•^^-5f5— Base Flood Elevation Line(BFE) 'C _F Limit of Study R F MINIM L L �� RD —--- Jurisdiction Boundary C Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature i Digital Data Available N -' No Digital Data Available _ } MAP PANELS Unmapped Jr. � I The pin displayed on the map is an approximate !� � point selected by the user and does not represent 757 FEET f an authoritative property location. 1 This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. 40 j'- f * The basemap shown complies with FEMA's basemap f accuracystandards bL r The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA.This map y * 11 was exported on 6/15/2023 at 11:18 AM and does not R 3� reflect changes or amendments subsequent to this date and t time.The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear:basemap imagery,flood zone labels, y _ legend,scale bar,map creation date,community identifiers, 78°38'3"W 35°SS'40"N FIRM panel number,and FIRM effective date.Map images for Feet 1-6 000 unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap Imagery Source:USGS National Map 2023 Surface Water Classifications: a X � a� Stroam Indcx. 18-68-12 1 + k Stream Name: Black River(Little Black River) (Popes Lake,Rhodes Fond) Description- From source to South River Classification- C;Sw Date of Class_-. August 31, 1974 Th�rrxY�� �r What doesthis Class_mean? View.; River Basin: Capc Fcar I ZGom to ' .. A I i ir Luvin Rd �. w � W J M. 610 � 1 2-Digit H UC(Su bwaters hed) 12-Digit[Marne: Lowe Black Diver � 12-Digit Code'. 030300060102 :4, 10-Digit Name- Upper South Rimer 10-Digit Code: G303X0601 S-Di gi t Code: 03030006 Rives-62sin: Co PeFe�r r 12-DigitArea (ac): 11295.3.2 CL Zoom to p "kink Valwy m 5/25/23,7:56 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 ' Location name: Dunn,North Carolina,USA* Latitude:35.3165*,Longitude: -78.6409° Elevation: 164 ft** *source:ESRI Maps y� source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration��� 10 25 50 100 200 500 1000 5-min 0.437 0.514 0.594 0.660 0.736 0.793 0.847 0.898 0.960 1.01 (0.399-0.480) (0.470-0.565) (0.543-0.653) (0.602-0.724) (0.668-0.806) (0.718-0.868) (0.763-0.926) (0.804-0.982) (0.851-1.05) (0.890-1.11) 10-min 0.698 0.822 0.951 1.06 1.17 1.26 1.35 1.42 1.52 1.59 (0.637-0.767) (0.752-0.903) (0.870-1.04) (0.963-1.16) 1 (1.06-1.28) 1 (1.14-1.38) 1 (1.21-1.47) 1 (1.27-1.56) (1.35-1.66) (1.40-1.74) 15-min 0.872 1.03 1.20 1.34 1.49 1.60 1.70 1.80 1.91 2.00 (0.797-0.959) (0.945-1.14) 1 (1.10-1.32) 1 (1.22-1.46) 1 (1.35-1.63) 11 (1.45-1.75) 1 (1.53-1.86) 1 (1.61-1.96) (1.69-2.09) (1.76-2.19) 30-min 1.20 1.43 1.71 1.94 2.20 2.41 2.61 2.80 3.04 3.24 (1.09-1.31) (1.30-1.57) (1.56-1.88) (1.77-2.12) (2.00-2.41) (2.18-2.64) (2.35-2.85) (2.50-3.06) (2.70-3.32) (2.85-3.55) 60-min 1.49 1.79 2.19 2.52 2.93 F 3.26 3.59 3.92 4.36 IF 4.73 (1.36-1.64) (1.64-1.97) (2.00-2.41) (2.30-2.76) (2.66-3.21) (2.96-3.57) (3.23-3.92) (3.51-4.29) (3.87-4.77) (4.16-5.18) 2-hr 1.75 2.12 2.63 3.07 3.64 4.11F 4.59 5.09 F 5.78 6.36 (1.58-1.95) 11 (1.92-2.36) (2.38-2.93) (2.76-3.41) (3.25-4.04) 1 (4.06-5.10) (4.48-5.65) 1(5.03-6.40) (5.49-7.06) 3-hr 1.86 2.24 2.81 3.30 F 3. 55 4.51 5.09 5.72 6.59 7.35 (1.68-2.08) 1 (2.04-2.51) (2.54-3.14) (2.97-3.68) (3.54-4.40) (4.01-5.03) (4.50-5.67) (5.01-6.36) (5.71-7.33) (6.30-8.19) 6-hr 2.22 2.68 3.35 3.94 4.75 5.44 6.16 6.94 8.04 9.00 (2.02-2.47) (2.44-2.98) (3.04-3.72) (3.56-4.37) (4.26-5.25) (4.85-6.01) (5.44-6.80) (6.07-7.65) (6.94-8.87) (7.68-9.94) 12-hr 2.61 3.15 3.96 4.68 F 5.68 6.54 7.46 8.46 9.90 11.2 (2.36-2.91) 11 (2.85-3.51) (3.58-4.42) 1 (4.21-5.22) 1 (5.06-6.30) 1 (5.79-7.25) 1 (6.54-8.25) 1 (7.33-9.35) (8.44-10.9) (9.38-12.3) 24-hr 3.05 3.71 4.75 5.59 F 6. 77 7.74 8.76 9.85 11.4 12.7 (2.78-3.36) (3.38-4.08) (4.31-5.22) 1 (5.07-6.14) 1 (6.11-7.44) (6.96-8.52) (7.86-9.64) 11 (8.79-10.8) (10.1-12.6) (11.2-14.0) 2-day 3.57 4.32 5.49 6.43 7.75 8.83 9.97 11.2 12.9 14.3 (3.27-3.90) (3.96-4.72) (5.01-5.99) (5.86-7.02) (7.03-8.46) (7.97-9.65) (8.95-10.9) (9.98-12.2) (11.4-14.2) (12.6-15.8) 3-day 3.80 4.59 5.80 6.76 F 8.12 9.22 10.4 11.6 13.3 14.7 (3.50-4.14) 11 (4.22-5.00) 1 (5.32-6.30) 1 (6.19-7.34) 1 (7.39-8.82) 1 (8.36-10.0) 1 (9.36-11.3) 1 (10.4-12.6) (11.9-14.6) (13.0-16.1) 4-day 4.04 4.87 6.11 7.10 F 8.48 9.60 10.8 IF 12.0 13.8 15.2 (3.73-4.37) 11 (4.49-5.27) (5.62-6.61) (6.52-7.67) (7.75-9.17) 1 (8.74-10.4) 1 (9.76-11.7) 1 (10.8-13.0) (12.3-15.0) (13.5-16.5) 1E77-day 4.67 5.61 6.96 8.03 9.52 10.7 .7day1.9 13.2 15.0 16.5 (4.31-5.08) (5.17-6.10) (6.40-7.57) (7.36-8.72) (8.69-10.3) (9.75-11.6) (10.8-13.0) (11.9-14.4) (13.4-16.4) (14.7-18.0) 10-day 5.34 6.38 7.79 8.89 F 10.4 11.6 12.8 14.0 iF 15.7 1 F-17.1 (4.98-5.73) 11 (5.95-6.86) 1 (7.24-8.37) (8.24-9.54) 1 (9.59-11.1) 1 (10.6-12.4) 1 (11.7-13.7 1 (12.8-15.1) (14.3-17.0) (15.5-18.5) 20-day 7.19 8.54 10.3 F 11.6 F 13.4 14.9 16.3 17.8 19.8 21.4 ) (6.69-7.73) (7.95-9.19) (9.53-11.0) (10.8-12.5) (12.4-14.4) (13.7-16.0) (15.0-17.5) (16.3-19.2) (18.1-21.4) (19.4-23.1 30-day 8.96 10.6 12.5 14.0 15.9 17.4 18.9 20.4 22.4 24.0 (8.35-9.64) 11 (9.88-11.4) 1 (13.0-15.0) 1 (14.7-17.1) (16.1-18.7) (17.4-20.3) 1 (18.8-22.0) (20.5-24.2) (21.9-25.9) 45-day 11.4 13.4 15.6 17.2 19.4 21.0 22.6 24.2 26.4 28.0 (10.7-12.2) 11 (12.6-14.3) 1 (14.6-16.6) 1 (18.1-20.7) 1 (19.6-22.5) 1 (21.0-24.2) 1 (22.5-26.0) (24.3-28.3) (25.8-30.1) 60-day 13.6 16.0 18.4 20.2 22.6 24.4 26.1 27.8 30.1 31.8 (12.8-14.5) (15.0-17.0) (17.3-19.6) (19.0-21.6) (21.2-24.1) (22.8-26.0) (24.4-27.9) (25.9-29.7) (27.9-32.2) (29.4-34.0) Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=depth&units=english&series=pds 114 5/25/23,7:56 AM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.31651, Longitude: -73-64091 Average recurrence 30 inlenral {yeara� 25 — 1 2 a 20 — 5 15 — 25 9 — 50 � 10 — 100 E — 200 IL — soo 5 1000 0 c_ c_ c_ c_ c_ L t L L tp fp U Ip N 0 0 0 0 E E E E ry r,� 4b It u'7 O VS O O �"� N N R�] r: O O O �fM1 O ,1 ,1 rn Ln Duratlan r.i m v n 30 € 25 Duration v 20 — "in — 2-clay c — 16-min — 3-day 15 15-min — 4-day — 30-min — 7-day 10 — 60-min — 10-eay a — 2-nr — 20-day 5 — 3-hr — 30-day 6-hr — 4-day 0 — 12-hr — 6o-eay — 24-hr 1 2 5 10 25 50 100 20D 500 1000 Average recurrence interval (years) NOAA Atlas 14,volume 2,Version 3 Created(GMT):Thu May 25 11:56:22 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=depth&units=english&series=pds 2/4 5/25/23,7:56 AM Precipitation Frequency Data Server '0 0 Erwi u,,, I 'per nn 3km 2mi Large scale terrain L F 7— 777— m � x�n-Salem � • . DUlha Greensboro Rocky Mount Raleigh� 46 TH C AROL INA 4PGreenville FCharlotte Fayetteville. I • Jacks AR 100km d:'ilmingb:n f�FfS/0w Bay 60mi Large scale map Liew Greenshoro o Durham Rocky Mount Ralei a g kz " North Greenville Carolina I sri offs F tteviIIe LJacks + \X� �a 100km Wilmington mb 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=depth&units=english&series=pds 3/4 5/25/23,7:56 AM Precipitation Frequency Data Server - Raleigh Greenville NOFth Fayettevffle 700km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?: HDSC.Questionsannoaa.gov Disclaimer https:Hhdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=depth&units=english&series=pds 4/4 5/25/23,7:57 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 ' Location name: Dunn,North Carolina,USA* Latitude:35.3165*,Longitude: -78.6409° Elevation: 164 ft** *source:ESRI Maps y� source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration� 2 10 25 F 500 1000 5-min 5.24 6.17 7.13 7.92 8.83 9.52 10.2 10.8 11.5 12.1 (4.79-5.76) 1 (5.64-6.78) (6.52-7.84) (7.22-8.69) (8.02-9.67) (8.62-10.4) 1 (9.16-11.1) 1 (9.65-11.8) 1 (10.2-12.6) (10.7-13.3) 10-min 4.19 4.93 5.71 6.34 7.04 7.58 8.08 8.54 9.11 9.56 (3.82-4.60) 1 (4.51-5.42) (5.22-6.27) (5.78-6.95) (6.39-7.70) (6.86-8.29) (7.27-8.83) (7.64-9.34) (8.08-9.96) (8.41-10.5) 15-min 3.49 4.13 4.81 5.34 5.95 6.40 6.81 7.18 7.64 8.00 (3.19-3.84) (3.78-4.54) (4.40-5.29) (4.87-5.86) (5.40-6.51) (5.79-7.00) (6.12-7.44) (6.43-7.85) (6.78-8.36) (7.04-8.76) 30-min 2.39 2.85 3.42 3.87 4.40 4.82 5.21 F 5.59 6.08 6.48 (2.18-2.63) (2.61-3.14) (3.13-3.76) (3.53-4.25) (4.00-4.82) (4.36-5.27) (4.69-5.70) (5.00-6.11) (5.39-6.65) (5.70-7.09) 60-min 1.49 1.79 2.19 2.52 2.93 3.26 3.59 3.92 4.36 4.73 (1.36-1.64) (1.64-1.97) (2.00-2.41) (2.30-2.76) (2.66-3.21) (2.96-3.57) (3.23-3.92) (3.51-4.29) (3.87-4.77) (4.16-5.18) 2-hr 0.875 1.06 1.32 1.53 1.82 2.06 2.29 2.54 2.89 3.18 (0.791-0.977) (0.957-1.18) 1 (1.19-1.47) 1 (1.63-2.02) (1.83-2.28) 1 (2.03-2.55) (2.24-2.82) (2.52-3.20) (2.74-3.53) 3-hr 0.618 0.747 0.934 1.10 1.32 1.50 1.70 1.90 2.20 2.45 (0.560-0.692) (0.677-0.835) (0.845-1.04) (0.989-1.22) (1.18-1.46) 1 (1.34-1.67) 1 (1.50-1.89) 1 (1.67-2.12) 1 (1.90-2.44) (2.10-2.73) 6-hr 0.370 0.447 0.559 0.658 0.792 0.907 1.03 1.16 1.34 1.50 (0.336-0.411) (0.406-0.496) (0.507-0.621) (0.595-0.730) (0.711-0.876) (0.809-1.00) (0.908-1.14) 1 (1.01-1.28) 1 (1.16-1.48) (1.28-1.66) 12-hr 0.216 0.261 0.328 0.388 0.471 0.543 0.618 0.701 0.821 0.926 (0.195-0.241) (0.236-0.291) (0.297-0.366) (0.349-0.433) (0.420-0.523) (0.480-0.601) (0.542-0.684) (0.608-0.776) (0.700-0.908) (0.778-1.02) 24-hr 0.127 0.154 0.197 0.232 0.282 0.322 0.365 0.410 0.475 0.527 (0.115-0.139) (0.140-0.169) (0.179-0.217) (0.211-0.255) (0.254-0.310) (0.290-0.354) (0.327-0.401) (0.366-0.452) (0.420-0.524) (0.464-0.583) 2-day 0.074 0.090 0.114 0.133 0.161 0.183 0.207 o.232 0.268 0.297 (0.068-0.081) (0.082-0.098) (0.104-0.124) (0.122-0.146) (0.146-0.176) (0.166-0.200) (0.186-0.227) (0.207-0.255) (0.238-0.294) (0.262-0.328) 3-day 0.052 0.063 0.080 0.093 0.112 0.128 0.144 0.161 0.185 0.204 (0.048-0.057) (0.058-0.069) (0.073-0.087) (0.085-0.101) (0.102-0.122) (0.116-0.139) (0.129-0.156) (0.144-0.175) (0.164-0.202) (0.181-0.224) 4-day 0.042 0.050 0.063 0.073 0.088 0.100 0.112 0.125 0.143 0.158 (0.038-0.045) (0.046-0.054) (0.058-0.068) (0.067-0.079) (0.080-0.095) (0.091-0.108) (0.101-0.121) (0.112-0.135) (0.128-0.155) (0.140-0.172) 7-day 0.027 0.033 0.041 0.047 ) 0.056 0.063 0.071 0.078 0.089 0.098 (0.025-0.030) (0.030-0.036) (0.038-0.045) (0.043-0.051 (0.051-0.061) (0.058-0.069) (0.064-0.077) (0.071-0.085) (0.080-0.097) (0.087-0.107) 10-day 0.022 0.026 0.032 0.037 0.043 0.048 0.053 0.058 0.065 0.071 (0.020-0.023) (0.024-0.028) (0.030-0.034) (0.034-0.039) (0.039-0.046) (0.044-0.051) (0.048-0.057) (0.053-0.062) (0.059-0.070) (0.064-0.077) 20-day 0.014 0.017 0.021 0.024 0.027 0.030 0.033 0.037 0.041 0.044 (0.013-0.016) (0.016-0.019) (0.019-0.022) (0.022-0.025) (0.025-0.030) (0.028-0.033) (0.031-0.036) (0.033-0.039) (0.037-0.044) (0.040-0.048) 30-day 0.012 0.014 0.017 0.019 0.022 0.024 0.026 0.028 0.031 0.033 (0.011-0.013) (0.013-0.015) (0.016-0.018) (0.018-0.020) (0.020-0.023) (0.022-0.025) (0.024-0.028) (0.026-0.030) (0.028-0.033) (0.030-0.035) 45-day 0.010 0.012 0.014 0.015 0.017 0.019 0.020 0.022 0.024 0.025 (0.009-0.011) (0.011-0.013) (0.013-0.015) (0.014-0.017) (0.016-0.019) (0.018-0.020) (0.019-0.022) (0.020-0.024) (0.022-0.026) (0.023-0.027) 60-day 0.009 0.011 0.012 0.014 0.015 0.016 0.018 0.019 0.020 0.022 (0.008-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.o14) (0.014-0.016) (0.015-0.018) (0.016-0.019) (0.017-0.020) (0.019-0.022)I(0.020-0.023) Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=intensity&units=engiish&series=pds 1/4 5/25/23,7:57 AM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.31651, Longitude: -73-64091 Average recurrence 10 L inlenral {yeara� r c — 1 ILO — 6 c — 25 e O — 50 _ 10-1 — 200 — 1000 10-� c_ c_ c_ c_ c_ L t L L M fp ro ru N ru fu fu fa E E It -Q -o -Q -o -Q -Q -Q-Q u'7 O VS O O �"� N N R�] r: O O O A O ,1 ,1 rn Ln Duration 101 r c Duration 100 Lh c — "in — 2-clay n � — 70-min — 3-day 15-min — 4-day — 30-min — 7-day 10-1 — 6 D-min — 1 d-day a L — 2-nr — 20-day — 3-hr — 3OL--day 6-hr — 4-day 10-2 — 12-hr — 60-day — 24-hr 1 2 5 10 25 50 100 20D 500 1000 Average recurrence interval (years) NOAAAtIas 14,volume 2,Version 3 Created(GMT):Thu May 25 11:57:01 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=intensity&units=engiish&series=pds 2/4 5/25/23,7:57 AM Precipitation Frequency Data Server '0 0 Erwi u,,, I 'per nn 3km 2mi Large scale terrain L F 7— 777— m � x�n-Salem � • . DUlha Greensboro Rocky Mount Raleigh� 46 TH C AROL INA 4PGreenville FCharlotte Fayetteville. I • Jacks AR 100km d:'ilmingb:n f�FfS/0w Bay 60mi Large scale map Liew Greenshoro o Durham Rocky Mount Ralei a g kz " North Greenville Carolina I sri offs F tteviIIe LJacks + \X� �a 100km Wilmington mb 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=intensity&units=engiish&series=pds 3/4 5/25/23,7:57 AM Precipitation Frequency Data Server - Raleigh Greenville NOFth Fayettevffle 700km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?: HDSC.Questionsannoaa.gov Disclaimer https:Hhdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=intensity&units=engiish&series=pds 4/4 ",JU6-7 \ l RO KAH DAB 1792 11 '�� �� / D ENNA SMH #1361 e 3881 USER s RIM: 169.47 PC RIM: 1 6 96 H1 v `\ ZONING R AND 9j1 \\�\_'\\ \`� OUT 18"0 18" DIP IE: 161.02 R R-20 #1506\ SMH #1564 i / p1N \�, \_, ` ` B 629 CRANE RIM: 176.48 / i GAR #1506, F 05 (A) IN 8" PVC IE: 170.02 y'NAC SST 9-261\�� �` 20N/NG #1604G 4 FUTURE (B) IN 6" DIP IE: 171.01 i �' / DB NEjM & CAR 2 \`� ��\\, R-10 AND R, CONDITIONS 1% 1% ANNUAL 1 1 RlE \ 20 ANNUAL CHANCE OUT 8"PVC IE: 169.90 � e � 46� p ,_ � I I � �� �� \'-\ FLOOD HAZARD CHANCE FLOOD �B) ,` Z0N/NG R#160p G 418 , S W--- I I \ \\ \ \\ �� s\�\ SSL10 '�\ (GIS) HAZARD (GIS) s \, 10 L \ \ 6's ® i p/ ,\`` AND R-2 p \ \ \ \ \\ \'\,,\ I i N 09'39'1'9"E- 611.63' TOTAL \ i DONA(1506-/ \, RS (#5) I I i \�j�� 21 \ \ RS \\ /,\ iI \ \ RS ( \ PIN #1507-70-0683 PIN #1506-79-3508 NANCY ✓0yNS0 58 \,`x ON LINE , \ \ LIN �\ \ 381.63' I JEAN R. WELLONS FARM, LLC DON DB 844 JOHNSON PG 739 ' De 92 W p 06NS N& x� (j w \ \ \ \\ \\ s `�\ \ \ DB 3366, PG 149 ZONING#R508 'q, ° l ZONING R 1p 22 " \\ \� \ \ \ \ \\\ \\ \\ \ \\ 15' SANITARY SEWER EASEMENT E ZONING RA O / PER CITY OF DUNN PROJECT: E-451-03 AND E-451-10 SMH 1 DB 687, PG 719 RIM: 171.2Z� � \ IN 18" DIP IE: 161'07 # \ l OUT 18" DIP IE: 161.0� SMH 1328 d 0 . 1" 7 / \ � � \ \ \ \ \\ \\ �\\ \\ \ \ � RIM: 169.91 / N=569255.67 I \ F 1 \ i \ \ \ \ \ `� \ \ \ IN 18" DIP IE: 161.51 / E=2107319.72 SMH #1003 J/// \ \ IRS ¢ \ \ ` i \ \ \ \ \ \ , \ OUT 18" DIP IE: 161.47 EL=179.68 RIM: 178.75 _ _ NLS /BASEROVER IN 8" PVC IE: 171.17 i v \ \ \ \ \ \\ \ \ \ \ s ��_ _ _ _ — — 0o N 89'21'51" E OUT 8" PVC IE: 171.14 ti \ \ \ i \ \ ���' — \ 0 352.50' TOTAL ��—E=210731 .73 �� NLS /NETWORK ° \ \ \ \ — _ — _ SMH 1325 �'�`\ RIM: 169.69 (A) IN 8" PVC IE: 162.44 (B) IN 18" DIP IE: 161.59 OUT 18" DIP IE: 161.51 I s \ SMH #1052 \ \ \ _ _ 1 J 8 pip o J LO o' ` RIM: 182.51 c� o o �\ IN 8" PVC IE: 175.06 m i 1/ \\ \ \\ \ // \ \ _ _ _ �\ \\\ \ `i r �--_ _, _DI' P S-�____ o N co y 'p OUI�8" PVC OUT IE:175.01 I \ \ \ \ \ \ \ \ \ \\ '�\ -____ S w o U Ln ° 15' UTILITY 6 Q E o EASEMENT z m � � z PLAT CAB. C, C o J o -° C IRF (#3)\\ \\ \ \\ \ \\\ \ 11 �1 1 �68 SLIDE 127A - o m o — (BENT) \ \ ° S 05'43'43" 143.67' \ \ � � � � \ \ � 1 � 15' UTILITY PIN #1507-70 6422 �LL m m - _ \\ \\ \ ` - PRE- DEVELOPE-D \\\ I 11 `ri\ \ EAAT CAB. C� RICKAYLA DALE ARNOLD D & _ ��° / 5 \\ANE PIN #1506 79 5448 S & RALPH D. LUCAS \ SLIDE 127A DB 3943, PG 945 °\ DB 4084, PG 373 \ \ \ \ \ I I i °�li'�9\ LOT SLIDE 12 AA6 C, 1 RRW4N ROAD — — \ \ \ DRAINAGE AREA 'r I I I ���� \ #308 THORNDALE DRIVE ZONING --- �\ \ �\ �\ — — �1 II \ � I �I I � G 11 \ ZONING R-10 BENCHMARK: #100 I IRON REBAR SET WITH I ms° m — yam \\ \ \ \ 874 AC \ II II I II II 1 '1 ' EASEMENTYCAP ELEVATION=183.14 ` 0o v i/ PLAT CAB. C, <I ° — \ 1 I I \ 1 SLIDE 127A ------ w SMH #1074 �� a / \ \ \ \ \ - - - - - -179- - - - - - 1� I� I� I I� I I� I6 ,) ) 'I % --_ -___ RIM: 183.64 i IRS (#�S) / / I \ I /I 1 IRF ( ) Q �T� PIN #1506-79-54 ' / I / I \ I I I I II Z QARG LL I ��o I y/ I 1 S 7h2'05" E �- DB 4084, PG 373 ` — _ / C \ \ I I I I167 92 SMH #1271 Q O O #1500 ( I I ' ' z U ZONING R-10 \� / \ \ I I �RF�#4� \ I I I '� 1 1 RIM: 174.60 I \�81� PIN #1506-79-5869 \ I I I I I I IR\ (#5) i1 11 IN 8" PVC IE: 164.41 J2M2 HOLDINGS, LLC \ I I I I 1 OUT 8" PVC IE: 164.35 Q 0 DB 4184, PG 339 I _ \ W (FULL OF DEBRIS) i Ni \ L — \ \ I I I l / L� RE-(7')�'' 4A Q Q Z CB #1152 i \ \ �8 ERWIN ROAD ( — — — , �� ZONING-RHO AP1D-R--29 \ / / / \ / IP`N S O0C GR: 186.45 °/ 1 S \ \\ \ 0 � AREA: 9.04 ACRES / / +�' PIN #1507-70-7396 \ < BOTTOM IE: 184.6t I \ 1 — — — — — — ch \ \ / / / / ( % C0� �i' KAYLA J. HOEFT & NICHOLAS M Q T. HOEFT Z_ _ DB 3683, PG 559 w LOT 13, PLAT CAB C, O / S _\ PIN #1506-79-8696— — _ — \ \\ �� \ \ \ / / 1 / r � � � \ �8 � \\ \\ / / � / � / S 52'20'04" E �� SLIDE 127A � rT� � ( Q MELODY Y. WEST — — — \ z \ \ / / 51.28' TIE #318 COLERIDGE DRIVE J I-�--1 W — - DB 4159, PG 1032 \ 8S \ \ \ / ZONING R-10 w #1406 / r� U ZONING R-10 / 7 �� \` `.J Z PIN #1507-70-8049 w Z OSCAR DALE JOHNSON & TAMMY `� C Z KAY JOHNSON 11 \ ; PIN DB 1718, PG 840 _ /�ti PIN #1507-70-7396 w 1 #1506-79-8959 I #119 5 RICHARD D. CHANCE ` o �� J PIN ' CYNDEE MUMFORD 1 ZONING R-10 � XJ DB 3201, PG 912 \ #1506-79-8966 \ DB 3947, PG 073 1 w �' LOT 14, PLAT CAB C, J� 1 c9 _ -i 1 1 _ _ ANNIE LEE MELVIN SLIDE 127A / \ I\ 11 11 IJ G RIARDO GODOY7 ARREERA & \ DB 4154, PG 675 8874 11 PB 20#11 PG 421 1 _____ \\ rn 1 #400ZONINGIRGIODRIVE I I 1 NOTE:MEA NOT SURVEtD Z 1 1 RUTH MARTNEZ QUINTERO 11 PB 200115 G 421 \ ZONING R-10 1 DUE TO NIMALS NO IN AN o o 1� 1 DB 3469, PG 651 ZONING R-10 \ ENCL SURV. w P 1 \ #111 \ 1 ___ ? _ 1 1i zg�� 0 1 ZONING R-10 0 1 --t -� �� O�oQJ��P I 1 PIN 1506-79-869 1 z y z b' �, SMH #1524 I # c,z o J Lo RIM: 194.30 \; TERESA JEAN McQUEEN '1 z m DB 1125, PG 406 0 �� -� IN 8" PVC IE: 185.52 I I 1 6 o j o OUT 8" PVC IE: 185.50 i 1 #107 ZONING R-1000 Q i _ NSON ^� I' - _-J00 vO`-JOgICRIGHTGFwAY o 1 o -- CO 33'PO pg5,PGa6 CIE VJ W ----- � PRELIMINARY ----"- DO NOT USE FOR / CONSTRUCTION PLAN STATUS DATE DESCRIPTION GRAPHIC SCALE xxx xxx xxx 1 o 25 50 goo zoo DESIGN DRAWN CHKD SCALE H: 1" = 50' V: ( IN FEET ) OB No. 220124-01-004 1 inch = 50 ft. DATE 2023 FILE No. SHEET Cad file name: V:\220124 - Ben Stout Construction\220124-01-004 (ENG) - Erwin Road, Dunn, NC\Engineering\Engineering Plans\Construction Documents\220124-01-004-DDX.dwg / RO BAH pq 1/92 ' Dg J881 bAuSER10 AND \s PEA/ _ I R-20 �� #1506, N GAIN #15 \\ ��' `\\\`\\\\� \\\`� 8R629 pGRANE980 i AR y MAC 06-/9, \ �' ��` ZONING #1604 054 FUTURE / WEST& 2612 ��� `� s �\��\ R-10 AND CONDITIONS 1% DB 14 11% CARRIE `� \` R-20 ANNUAL CHANCE 1% ANNUAL POST- EV E LOP-E.D ZONING #1 00 G 418 1 g (#)\,, ' \ \ \\ \ \ FLOOD HAZARD CHANCE FLOOD l R'10 L2 \\ \ s�`� \SL10 �`\ (GIS) HAZARD (GIS) I n pl \\\ AND R-2p LIN �,, ' \ \\ \\ ` \ \\ ON-SIT PAVEM NT #1546\ �- `, 210.00' \ \ \ 09391�S {` 611.63' TOTAL PIN 15u j508 i NA tD I ✓0,g-255g \�'��x ION LINE I ,�\ \ 1, (I ��� \\ i > PIN #1507-70-0683 DONALD I. JOHNSON N 0. 7 AC DS 8 w. ✓HNSON & \\ x I { \ \ \\ \ \s \ \ / 381.63' / \ I 1 JEAN R. WELLONS FARM, LLC W DB 3366, PG 149 DB 844, PG 739SF� PG N \ \ \ i 1508 / 2 Nl# 1p 622 ,. ' $ \ \ \\ \ \ \\\`, \ 15' SANITARY SEWER EASEMENT ERWIN ROAD ZONING R-10 / / 2 - 0 NG 1 \ �- \ \ \ \ \ n ZONING R-20 / -_' 0 ------- \ s \ \ \ PER CITY OF DUNN PROJECT: ND 5 - POS I PED " \ F , 1�1\ - \\ \ / \ \ \\ \\` s��, \\ _ DRAINA8 G A 5 . 05 AC IR "�Q8 - N 89*21'51 E 352.50' TOTAL L0 C O rn E O co W -0 c \ C cz O J Cz on �S L14 m ca F,o9CP� \` i'\ �/ J IRS (#5)1�1 \\ \\ / \\ \ ----- �� \\ \\ \ \\— — \ / / \ / \ \\ \ �1 \ EASEMENT Y \ / \ / 1,1 \ \ \ PLAT CAB. C, \\ m ° \ SLIDE 127A \, ) \ / / \ — \ \ , 1 \ 15' UTILITY PIN #1507-70-6422 w amp a � \ \ � � / \ EA �Z RICHARD DALE ARNOLD & AT CAB. C� KAYLA LEA ARNOLD q5 \ PIN #1506-79-5448 / / \ — — — — — — 3943, PG— / iS & RALPH D. LUCAS / \ ` _ // II1 "J�� SLIDE 127A LOB SLIDE A27A 65C, POST-DEVELOPED ° \ANE DB 4084, PG 373 _ — , \ w m\\ €RW1N ROAD —i \ / / \ \ / — — \ \ ZONING R-10 — / \I I1 I I \ #308 THORINDALE R-1 DRIVE 0 I-�--I z \ --- `\ \ / \ I � � i " �,1 \ ZONING R-10 � � OFFSITEBDI ° \\\ - - - _ - - _ ', 20' UTILITY z o 0 RON REBAR SET WITH mz m — \ ° / I , EASEMENT — U AREAVATIO 8 . /\ / _ _ _ I I , I /� PLAT CAB. C, Q N �'. 1 A m I — — \ / \ \ \ \ \ — — — I \ 11', I I /\ ' SLIDE 127A 0 (13 582 S F %� PO -DEVELOPED - _ _ _ - - - /\ , ' ' ' '� �/ " __-----_- -----_---- o Q z ) ' ) N IRS ( / / / —179- — — — _ — — — — — / \ I I I L----- __�- IRF ( ) ~ 0 � PIN 1506-79-54 \ "-- - a I / b-WsITE-p�IVEW AREA _ w z # a / �� "QARE, LLCM I / I I ^/ / I �S 73t 2'05" E \ DB 4084, PG 373 ` — — — _ \ / / ti \ O Cc #1500 \ " / \ 'r 0.37 I 4 / 6,20{� F — — — \ , I I , ,� �,67�92, J W w ZONING R-10 \ I I __ / \ � " ° I I` \ PIN #1 06-79-586 \ ' I I IR\'S (#5) � �� �� \�\ w r� — \ \ J2M2 OLDINGS, LLC \ i � ` ) U L�j FULL OF DEBRIS ` \ L — — \ DB 4184, PG 339 \ t' , w z ( CB #1152 i "/ \ \ — — / \\\ \�82\ ZONI �R-IRWIN ROAD \ L� / R�(# )�� , S \�� Q h--I z GR: 186.45 °/ I S ( \ \ \ �.90 — — — \ \ \ ° \ �,, EIP N ,� PIN 1507-70-7396 Z \ BOTTOM IE: 184.6t I \ — C0� ��' " KAYLA J. HOEFT & NICHOLAS � \ � � �� \ \ AEA: 9.04 ACRES \ / / # \ \ / o° \\ 78�\ \ ° / / c / / i / >� T. HOEFT \ \ \ a / - \ I DB 3683, PG 559 o, \ \ V E LO P LOT 13, PLAT CAB C, O — \ w �8 \ \ \ / ^ SLIDE 127A -PIN #1506-79-8696_ — — — — — \ �� ��\ \ / / S 52'20'04' E 318 COLERIDGE DRIVE 0— " O MELODY Y. WEST \ \ \ \ \ 0 N S I T E DRAINAGE. 51.28' TIE � \ # DB 4159, PG 1032 \\ o �d'S \ \ \ gti,9�•50 S / / � ZONING R-10 #1406 ZONING R-10 �' \\ PIN #15UARtsuA ~ 4.74 AC OSCAR DALE JOHNSON & TAM0 POST-DEVELOPED 6 526 SF) PIN 1507-70-7396 #1506-79-8959 \ # 19 ^T RICHARD D. CHANCE _ \ NN ��DD i ZONING R-10 �' / DB 3201, PG 912 _-_ _ , n 11 #1506 I��TM3SIDE ALK Z�+w �� LOT 14, PLAT CAB C, J� I co i _ _ ANNIE L VI PB 2003, PG 421 SLIDE 127A \ PIN 1506 79 8874 \ � � � ` # DB 415 � � #400 COLERIDGE DRIVE � J \t GERARDO GODOY BARRERA & PB 2021 /` n1 /ta �i1 / .\ I rn ' ,�$$ '' A ^' (�IN 1(Jy ZONING R-10 NOTE: EA NOT SURVE D i RUTH MARTINEZ QUINTERO �� 1 i DUE TONIMALS NO IN AN Z DB 3469, PG 651 # # / ENCL�SURV. .gym� �� #111 \ ZONI - _ _ / `�Q�jQpS z�o r_ �' 11 ZONING R-10 , � ��48 F _---- �--� i \�`� /' ��oQJ0�GP0 \ I _ -� I " i PIN #1506-79-869F - -� _ TERESA JEAN MCQUEEN �, �' �ij --- i i DB 1125, PG 406 ' � �� �� ______f - _______- � , � PRELIMINARY #107 w c / \ DO NOT I ZONING R-10 ` ' \ I a �NSONpDR' I� _ s -- c C4� O L1CRIGHT O WAV USE FOR Io o o __ - 0 33 pUgpgS pG86 _- / / CONSTRUCTION T_ __-- ---- / / co CD W A ! / PLAN STATUS DATE DESCRIPTION GRAPHIC SCALE xxx xxx xxx so o 25 50 goo zoo DESIGN DRAWN CHKD SCALE H: 1" = 50' V: ( IN FEET ) OB No. 220124-01-004 1 inch = 50 ft. DATE 2023 FILE No. SHEET Cad file name: V:\220124 - Ben Stout Construction\220124-01-004 (ENG) - Erwin Road, Dunn, NC\Engineering\Engineering Plans\Construction Documents\220124-01-004-DDP.dwg l 7r'oU6- Ro KAN DAB;1792 fN / DB 3881 NAUS,% ZONiNO R�o AND 9j> R-20 \ \ \\ #1506, \ \ BRFNT s "g,1g8 \` l / Pad \,\ \`` Dg 629 CRANE 0 \ i Cq #15 P "Y41C SST g,26J ��� `� v, 2ON/NG R#1604 054 FUTURE & 2 s ���, 10 AND CONDITIONS 1% \ l ° e l Dg 146,0 CgRR/S �\ / 0 / ` R20 ANNUAL CHANCE 1% ANNUAL \ 2p1V1 #16 C 418 I \ \ �` \� CHANCE FLOOD NC 00 \ S (# ,, / \ \ �` \ \ '\ FLOOD HAZARD / s \\ R-1 p , \ / \\ \ ` \ s\\\\ \L10 \\ (GIS) HAZARD (GIS) A I / l N #150 --- 1 I \� 21 \ \ 09'39'1� f� 611.63' TOTAL l / 0ONA(D / 6 /'g-25 \, IRS (#5) l �1 RS # PIN #1506-79-3508 / / NgNCY W JpyNSON 5g �\,`x ON LINE ,� N � � \ � \ \ LIN `\ \ / 381.63' PIN 1507-70-0683 DONALD I. JOHNSON De JD & I \ \ \ \S \\ I JEAN R. WELLONS FARM, LLC DB 844, PG 739 ' 927 PC yNSON DB 3366, PG 149 ZONING#508 20NWC R 1022 " \\ \� \ \\ \\\ \\ \\ \ \\\ \ 15' SANITARY SEWER EASEMENT OG NI R A 0 I / \ s \ PER CITY OF DUNN PROJECT: ----- /\ \ \ \\ \\ \ \ E-451-03 AND E-451-1 DB 687, PG 9 T \ \ \ \ \ \ \ / \ N 0939'41" E 157.70' IR Aft �� ` _s� — — \ \ \\ � — °° N 89'21'51" E (.11 352.50' TOTAL \\ ml \ IRS ( 5) J O U LLI Ln LO Ov _ IRS (#5) \ \\ / \ \ �i \� ----- Z C 15' UTILITY o Q _ E o EASEMENT Z m � Z PLAT CAB. C, c o c -0 c SLIDE 127A E < 0 E 15' UTILITY PIN #1507-70-6422 m m \ 1 \ 1 \ EA RICHARD DALE ARNOLD & 5 \ # / — — — _ _ _ PED BYPA I " v AT CAB. C� KAYLA LEA ARNOLD \ANE PIN1506-79-5448 / I 1 SLIDE 127A DB 3943, PG 945 S & RALPH D. LUCAS \\ � ` / i'�9 LOT 11, PLAT CAB C, I/ ° °\ DB 4084, PG 373 / \ \ I \ SLIDE 127A \ ERRWEN,\\\\ \\ \m / �\ m \ ---- ROAD — — — — — — — — — — #308 THORNDALE DRIVE ZONING R-1� D AIN E A . a.68 AC ZONING R-10 Q BENCHMARK #100 ------ 20' UTILITY U-11 IRON REBAR SET WITH I I I I I EASEMENT CAP ELEVATION=183.14 \\ m \ /\\ / \\ / — — — —/ 1 \1 1 �I i�> PLAT CAB. C, SLIDE 127A i Imo\ \ —179- - _ z PIN #1506 79-54 QARE, LLC\ 1 5 DB 4084, PG 373 \ — — — _ \ / / / I \ 80� \ I I I / i S 7h2'05" E #1500 � I / �i67 92 k O \ ZONING R-10 \ \ I I I I ��� I �#4 \ \�81 � PIN #1 06-79-5869 \\ � I I I I I IR\'S (#5) \\ � J2M2 OLDINGS, LLC \ � I I I � (FULL OF BDEBRIIS) j / \ \ DB 4184, PG 339 ' I \ (� 0 W \ � L # L \ \\ \78� RWIN ROAD r I L� R�O��� s Q Q Z GR: 186.45 / I S\ \ \ \ — — — — , \ ZONI �R-+O AP1DR-M \ ° �' / EIP\ �� \ ~ 0 ° ( _ \ \\ AEA: 9.04 ACRES \ N 5' PIN #1507-70-7396 \ BOTTOM IE: 184.6t \ — — — — U, \ CONC ' j � Q �\ til �� — — �' i KAYLA J. HOEFT & NICHOLAS T. HOEFT m z = _ _ I _ _ } DB 3683, PG 559 \ a \� LOT I3, PLAT CAB C, / - - \ 8st \ / / `° SLIDE 127A Cc S ( I - PIN #LODY 79 8696_ - - ^\ \ / , / S 52'20'04" E w MELODY Y. WEST — — — \ \ -+o \ � #318 COLERIDGE DRIVE W W 0 _ \ \ \ \ \ / / / 51.28' TIE \ ZONING R-10 DB 4159, PG 1032 � cps \ \ °5 / i � \ r� #1406 \ \ \ / / i ZONING R-10 m I \ PIN #1507-70-8049 w Ii Z OSCAR DALE JOHNSON & TAMMY `� \ Z - \ \ �I KAY JOHNSON I ;'I \ \ \ PIN DB 1718, PG 840 �ti PIN #1507-70-7396 _ \ I #1506-79-8959 I #119 5 RICHARD D. CHANCE ` Q PIN ORDI ZONING R-10 /J DB 3201, PG 912 \ 1506-79-8966 \ CYNDEE , PG 073 I z W �, LOT 14, PLAT CAB C, j !' # DB 3947, PG 073 .�� i c9 ' PIN #1506-79-8874 ANNIE LEE MELVIN PB 2003, PG 421 \ SLIDE 127A DB 4154, PG 675 I 117 ___- _ � #400 ZONING DGE DRIVE W i GERARDO GODOY BARRERA & # I rn -0 i ZONING R-10 P I I I NOTE:MEA NOT SURVEtD Z I I RUTH MARTNEZ QUINTERO II PB 200115 G 421 \ TI _ \ O� / '� ZONING R-10 � � o`� \�� ,� O I DUE TO NIMALS NO IN o o �� k DB 3469, PG 651 \ ZONING R-10 \ ENCL SUR . m I \ #111 'i z�o m r �'i l -10 -o ZONING R I I� I PIN #1506-79-869F� II z i TERESA JEAN McQUEEN I I DB 1125, PG 406 bo i I #107 i ZONING R-10 Z - SON I � - r 1 30 1,N _-- � � __-J-- � GO� nCRIGHIGF.VIP.V I o 1 o - CO 33'pU8pg5 VJ W _---- PRELIMINARY ---- DO NOT USE FOR / CONSTRUCTION PLAN STATUS DATE DESCRIPTION GRAPHIC SCALE xxx xxx xxx 50 o 25 50 goo zoo 1 DESIGN DRAWN CHKD SCALE H: 1" = 50' V: ( IN FEET ) OB No. 220124-01-004 0 In 1 inch = 50 ft. DATE 2023 FILE No. SHEET Cad file name: V:\220124 - Ben Stout Construction\220124-01-004 (ENG) - Erwin Road, Dunn, NC\Engineering\Engineering Plans\Construction Documents\220124-01-004-DDP.dwg U.S. Fish and Wildlife Service National Wetlands Inventory Wetlands Inventory Map N • I' 4 � .41 1 � - - f n- r ` k.- 1 t i a t_ A • � T1 -..4 1:3,670 0 0.03 0.06 0.12 mi r i U.S.Fish and Wildlif2Service,National Standards and Support Team, 0 0.05 0.1 0.2 km wetlands team@fws.gov ,.in/t`- July 1 0, 2023 This map is for general reference only.The US Fish and Wildlife y Service is not responsible for the accuracy or currentness of the Wetlands base data shown on this map.All wetlands related data should Freshwater Emergent Wetland Lake be used in accordance with the layer metadata found on the Wetlands Mapper web site. Estuarine and Marine Deepwater ❑ Freshwater Forested/Shrub Wetland ❑ Other Estuarine and Marine Wetland ❑ Freshwater Pond ❑ Riverine National Wetlands Inventory(NWI) This page was produced by the NWI mapper Bowman NORTH CAROLINA APPENDIX B Stormwater Wetlands Calculations CN Values Time of Concentration Calculations Wet Pond Design, Hydrographs, and Details Grass Channels Spread Calculations Erwin Road Residential—Dunn, NC 9 1 P a g e Bowman North Carolina, Ltd. Curve Number Calculation (CN) Pre-Developed Conditions(Overall Site) Drainage Area(acresZ 8.74 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 1.18 14% A NoB Norfolk loamy sand 5.16 59% A NoC Norfolk loamy sand 2.40 27% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space- Fair A 1.00 57 6.5 Open Space-Good A 0.35 59 2.4 Wooded -Good A 7.32 53 44.4 Impervious A 0.07 98 0.8 Cumulative Curve#= 53.3 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Post-Developed Conditions(Wet Pond) Drainage Area(acres) 5.05 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.68 13% A NoB Norfolk loamy sand 3.48 69% A NoC Norfolk loamy sand 0.89 18% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Impervious A 1.95 98 37.8 Open Space- Good A 2.92 59 34.1 Wooded -Good A 0.18 53 1.9 Cumulative Curve#= 73.8 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Post-Developed Bypass Conditions(Wet Pond) Drainage Area(acresZ 3.68 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.39 11% A NoB Norfolk loamy sand 1.17 32% A NoC Norfolk loamy sand 1.21 33% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good A 1.10 59 17.6 Wooded -Good A 2.59 53 37.3 Cumulative Curve#= 54.8 IMPERVIOUS SUMMARY TABLE ON - SiTE AREA _ 393 ) 826 SF ( 9 . 04 ACRES ) BULDNGS 33 , 21 0 SF 0 . 76 ACRE ( S ) 8 , 41 % OF ;-`, RED. PAVEMENT 41 ) 092 SF 0 . 94 ACRE ( S ) 10 . 40 % OF ARE ; SUEWALK 48 SF 0 . 18 ACRE ( S ) 1 . 99 % OF AREA EkSThG WPERVIOUS AREA 0 SF 0 ACRE ( S ) 0 % OF AREA TOTAL WPERVIOUS AREA 82 ) 050 SF 1 . 88 ACRE ( S ) 20 . 80 % OF AREA, GREEN /OPEN SPACE 311 ) 776 SF 7 . 16 ACRE ( S ) 79 , 20 % OF AREA. INCREASE IN WPERVhOUS AREA 82 ) 050 SF 1 . 88 ACRE ( S ) 20 . 80 % OF AREA TIME OF CONCENTRATION Existinq Conditions SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENTI SEGMENT1 Manninq's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s"0.4) 2-year/24-hr To=L/60'V V=1.49Rv3S"/n Basin Comments Length Elevt Elev2 Slope Rainfall Depth Manning's Tyr Length Elev2 Elev3 Slope Condition Vavg T�2 Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T. T­ Tc(minimum) Tlag Basin (ft) (ft/ft) TP-40(in) "n" (min) (ft) (ft/ft) TR-55 Fig.3-1 Wesel (min) Flow Area(tt^2) (ft) (tt) (tt) (ft/ft) "n" (fps) (min) (min) (10 min) 0.6'Tc(hrs) 1 Stream 100 189.19 186.18 0.030 3.71 0.24 11.25 637 186.2 164.95 0.03333 Unpaved 2.95 3.60 14.85 14.85 0.15 1 1IW=234:06 PM G:WYDR01p.jecls\Tl..0—Dunn Erwin Rd.ds Proposed Wet Pond Project Information Project Name: Erwin Road Residential Project#: Designed by: RG Date: 8/18/2023 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 5.05 Acres 220,108 sf Impervious Area (IA) = 1.95 Acres 85,120 sf Percent Impervious (1) = % 38.67 % Required Surface Area Permament Pool Depth: 3.92 ft Non-Coastal County SA/DA= 1.22 Min Req'd Surface Area = 2,684 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.398 in/in Storage Volume Required = 7,297 cf(above Permanent Pool) Elevations Top of Pond Elevation = 174.60 ft Temporary Pool Elevation = 172.10 ft Permanent Pool Elevation = 170.10 ft Shelf Begining Elevation = 169.60 ft Forebay Weir= 169.00 ft Shelf Ending Elevation = 170.60 ft Bottom Elevation = 164.60 ft Permanent Pool Area Area @ Top of Permanent Pool = 4,375 sf Volume of Temporary Storage = 16,105 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 4375 > 2684 ) sf Volume of Storage for Design Storm = 16,105 Yes ( 16105 > 7297 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Erwin Road Residential Project#: Designed by: RG Date: 8/18/2023 Checked by: Date: Water Quality Orifice Incremental Determination of Water Quality Volume Drawdown Time Zone 3 Q3=0.0437 Cp`D2(Z-D/24-Ei)A(112) 1 Zone 2 O Q2=0.372 CD'D'(Z-Ei)A)3i2) Zone 1 Q,=0 1 Orifice Diameter(D)= 1.3 in Cd= 0.6 Ei= 170.1 Orifice Inv. Zone 1 Range= 0.00 to 170.1 Zone 2 Range= 170.1 to 170.2 Zone 3 Range= 170.2 to 172.1 Incremental Drawdown Method Contour Incremental Drawdown Countour Area Volume Stage,Z Zone Q Time sq ft cu ft ft cfs min 170.10 6,140 0 0.00 2.00 0.000 170.60 7425 3,391 0.50 3.00 0.030 1,910 171.60 8770 8,098 1.00 3.00 0.053 2,533 172.00 9520 3,658 0.40 3.00 0.060 1,013 172.10 9645 958 0.10 3.00 0.062 258 Total 16,105 5,714 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 16,105 cf Total Time= 5,714 min Total Time= 3.97 days Between 2&5 8/18/2023 Wet Pond-new design-Dunn Erwin.xls 1 of 1 Project: Pond #1 Date: 8/18/2023 Main-Pond Contours-Volumes Elevation Main-Pond Incremental Vol. Accumulated Vol. Description 170.1 4,370 1,995 14,336 A2 (Perm—Pool) 169.6 3,610 2,079 12,341 Al (Bottom_Shelf) 169 3,320 3,078 10,262 168 2,835 2,615 7,184 167 2,395 2,185 4,569 166 1,975 1,780 2,384 165 1,585 604 604 164.6 1,435 0 0 A3 (Bottom_Pond) Forebay Contours-Volumes Elevation FB1 FB2 FB3 Total-Areas Incremental Vol. Accumulated Vol. 170.1 1,620 1,620 724 2,411 169.6 1,275 1,275 718 1,687 169 1,120 1,120 401 969 168.6 885 885 568 568 167.6 250 250 0 0 Forebay Volume 16.8% *Between 15% &20% Average Depth (Option 1) 3.42 *At least 3' average depth Average Depth Calculation (Option 2) Vpp 14,336 permeter of shelf 267 Length of PPE at main pond only width of shelf 3 Al (Bottom—Shelf): 3,610 Average Depth = 3.92 Proposed Wet Pond #1 Project Information Project Name: Erwin Road Residential Project#: Designed by: RG Date: 8/8/2023 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 5.05 Acres Impervious Area (IA) = 1.95 Acres Percent Impervious (1) = 38.67 % (Drainage Area) Orifice Sizing Orifice Size = 1.30 in (Diameter) Drawdown Time = 3.97 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day(yes/no) ? yes Anti-Flotation Device 4'x 4' Outlet Structure Area: 16.0 sf Volume: 160.0 cf (Water Displaced -Top of Pond to Bottom of Pond) Weight: 9984 Ibs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 11,981 Ibs Volume of Concrete Req'd: 79.9 cf (Unit WT of Concrete = 150 pcf) Volume Provided: 86.0 cf (4'x4' riser x 2' =32cf, 6'x6'footing x 1.5' =54cf) STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 170.1 6140 0 0 0.5 170.6 7425 3391 3391 1.5 171.6 8770 8098 11489 1.9 172.0 9520 3658 15147 2.0 172.1 9645 958 16105 (WQV) 2.9 173.0 10835 9216 25321 3.9 174.0 12210 11523 36844 4.5 174.6 13060 7581 44425 (STORMWATER MANAGEMENT DESIGN WET DETENTION POND; RIVER BASIN: CAPE FEAR RECEIVING STREAM: BLACK RIVER STREAM INDEX: 18-68-12-1 STREAM CLASS: C;Sw HUC: 0303000601 PROJECT COORDINATES: 35.314454'N, -78.639890V POND DESIGN SUMMARY DRAINAGE AREA TO POND: 5.05 ACRES SITE IMPERVIOUS AREA TO POND: 1.88 ACRES OFF-SITE DESIGN IMPERVIOUS AREA TO POND: 0.07 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 1.95 ACRES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED POST DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND BYPASS COMBINED DRAINAGE AREA: 8.74 AC 5.05 AC 3.68 AC CURVE NUMBER: 53.3 73.8 54.8 TIME OF CONCENTRATION: 14.9 MIN 5 MIN 10 MIN 1.0" STORM EVENT: 0.048 CFS 0.004 CFS 1-YEAR STORM EVENT: 0.396 CFS 7.947 CFS 0.058 CFS 0.323 CFS 0.381 CFS 2-YEAR STORM EVENT: 1.968 CFS 11.81 CFS 0.242 CFS 1.292 CFS 1.534 CFS 10-YEAR STORM EVENT: 11.08 CFS 24.03 CFS 3.668 CFS 6.109 CFS 9.777 CFS 100-YEAR STORM EVENT: 33.28 CFS 46.70 CFS 15.82 CFS 17.22 CFS 33.04 CFS \ � 1 \ 1 1 1 1 I \ 1 IN 1 It \ It 1 PLAN VIEW GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) 1 inch = 50 ft. 5' EMBANKMENT WIDTH 6'TOPSOIL FOR ALL AREAS ABOVE THE TRASH RACK NORMAL POND ELEVATION REFER TO DETAIL THIS SHEET 18'HOPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED TOP OF EMBANKMENT ELEVATION=174.6 PER DIRECTION OF GEOTECHNICAL 6'TOPSOIL ABOVE ENGINEER 2 6'CLAY LINER REFER TO DETAIL 100 YEAR STORM ELEVATION=174.28 ON LITTORAL SHELF FOR INCREMENTAL I 6'CLAY SOIL 3 WEIR LINER ON INSIDE FACE OF = 1 10 YEAR STORM ELEVATION=172.74 EMBANKMENT —I 6 � 4'x4'PRECAST < 6FT LITTORAL 1 CONCRETE RISER SHELF _ (INSTALL STEPS 2 YEAR STORM ELEVATION=172.19 - AS NECESSARY) 1 YEAR STORM ELEVATI0N=171.83 INV-169.9 1.0-INCH STORM ELEVATION=170.15 NORMAL POND ELEVATION=170.1 PYC E1J10N 3'MIN SEE DETAIL `• I ` 1 ELEV=167.9 2 NOTE: PUMPS SHALL USED TO DRAIN 1 I THE POND VA NECESSARY. REFER TO DETAIL _ THIS SHEET FOR DEWATERING REQUIREMENTS. 4 IN. ASTM C-923 SEAL BETWEEN BARREL&RISER.KEY CUTOFF TRENCH WITH CONC.TOO INVERT OF RISER BASE NV FILLED I I_ BOTTOM OF POND(TOP OF SEDIMENT STORAGE)=164.6 APPROXIMATE SIZE BARREL CONCRETE SHALL BE _ EXCAVATE AND BACKFILL 6'XB'X1'X1Y LONG ANGLE(6 TOT.REWIRED)TO ANCHOR RISER TO ANGLES IAREISEDURED = (BOTTOM OF SEDIMENT STORAGE)=163.6 WITH COMPACTED BASE PROVIDE 2-3/4'A307 BOLTS FROM ANGLE TO RISER AND TO BASE AND RISER. I -----------------ji STRUCTURAL FILL AS 2-A307 'd'HOOKS 3/4'DIA.X 12'LONG FROM ANGLE TO BASE ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT NIB -------- DIRECTED BY GEOTECHNICAL CONSTRUCTION.'8 HOOKS TO BE PLACED UNDER LOWER REINFORCING ENGINEER STEEL 6'CLAY SOIL 85B'10.6'CONC.BASE REINFORCE WITH/4 BARS AT 12'O.C.TO' LINER AND BOTTOM OF EACH DIRECTION PROVIDE 3'MIN.CLEARANCE MAIN POOL 62'-18'HOPE®0.65% BETWEEN EDGE OF CONC.AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE N.T.S. 6'TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BER FOREBAY TOP ELEV=171.6 WIDTH AT TOP=2.0 FT 6'TOPSOIL ABOVE 6'CLAY LINER 3:1 NOTE PUMPS SHALL BE USED TO DRAIN ON LITTORAL SHELF THE FOREBAY WHEN NECESSARY. REFER TO DETAIL E1WNG GRADE-175.0f = = SEDIMENT STORAGE THIS SHEET FOR DEWATERING REQUIREMENTS. TOP 6FT LITTORAL - FOREBAY BOTTOM Y� SHELF 6:1 I ELEV=167.0 NORMAL POND ELEVATION 2 - - - BOTTOM LITTORAL SHELF ELEV. 1 I I-I 11- - CLASS B RP-RAP OVER FILTER _ FABRIC MIN.4!FOREBAY - I_ WEIR AT ELEV=169.0 - _I 6'TOPSOIL FOR ALL FOREBAY ENTRANCE SHALL BE AREAS ABOVE THE DEEPER THAN FOREBAY SNIT - NORMAL POND ELEVATION BOTTOM OF SEDIMENT _ STORAGE/EAT BOTTOM OF SEDIMENT ELEV=168.6 STORAGE/ENTRANCE ELEV=166.6 FOREBAY ENTRANCE SHALL BE FOREBAY DEEPER THAN FOREBAY EXIT REMOVABLE TRASH RACK 4'PVC SCREW CAP RISER STRUCTURE EMERGENCY WEIR FOR CLEANING ACCESS ELEV=173.0 INTERMEDIATE WEIR ELEV=172.1 H 12'MIN. EXTEND 4' 2.1 FT PVC THROUGH RISER STRUCTURE 4'0'PVC TEE PERM.POND ELEV.=170.1 INSTALL 4'PVC SCREW A CAP AT OF TEE 4'OPENING CORED INTO AND DRILLLJ01.DIA. SIDE OF PRECAST HOLE INTO PVC CAP STRUCTURE AT ELEV=170.1 INV=170.1 OUTLET PIPE 12'MIN. INV=169.9 4'DIA.OPENING SECTION B—B PVC DRAIN OUTLET SCALE: N.T.S. TOP OF STRUCTURE NOT SHOWN FOR CLARITY Top OF Hf7R` (REMOVABLE TRASH RACK) 1730 l/vo, q7F OUTLET CONTROL STRUCTURE-INCREMENTAL WEIR SCALE: N.T.S. 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.396 2 732 5,177 ------ ------ ------ BMP Pre-Developed 2 SCS Runoff 7.947 2 718 15,976 ------ ------ ------ BMP Post-Developed 3 Reservoir 0.058 2 1444 13,283 2 171.83 13,630 Post Through Pond 4 SCS Runoff 0.323 2 726 2,789 ------ ------ ------ Post Developed-Pond Bypass 6 SCS Runoff 0.048 2 360 376 ------ ------ ------ BMP Post-Developed 7 Reservoir 0.004 2 366 271 6 170.15 362 1.0-in Storm Thru Pond Wet Pond-Dunn Erwin.gpw Return Period: 1 Year Friday, 08/ 18/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 0.396 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 5,177 cuft Drainage area = 8.740 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.90 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 7.947 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 15,976 cuft Drainage area = 5.050 ac Curve number = 73.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.058 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 13,283 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 171.83 ft Reservoir name = BMP Pond Max. Storage = 13,630 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 0 Total storage used = 13,630 cuft Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation= 170.10 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cult) Total storage(cult) 0.00 170.10 6,140 0 0 0.50 170.60 7,425 3,391 3,391 1.50 171.60 8,770 8,098 11,489 1.90 172.00 9,520 3,658 15,147 2.00 172.10 9,645 958 16,105 2.90 173.00 10,835 9,216 25,321 3.90 174.00 12,210 11,523 36,844 4.50 174.60 13,060 7,581 44,425 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 1.30 0.00 0.00 Crest Len(ft) = 2.10 13.90 0.00 0.00 Span(in) = 18.00 1.30 0.00 0.00 Crest El.(ft) = 172.10 173.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 169.90 170.10 0.00 0.00 Weir Type = Rect Broad --- --- Length(ft) = 62.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.65 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 175.10 OOF 4.00 174.10 .100 3.00 173.10 2.00 172.10 1.00 171.10 0.00 170.10 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q Discharge(cfs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 0.323 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 2,789 cuft Drainage area = 3.680 ac Curve number = 54.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.048 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 376 cuft Drainage area = 5.050 ac Curve number = 73.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 60 120 180 240 300 360 420 Hyd No. 6 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.004 cfs Storm frequency = 1 yrs Time to peak = 366 min Time interval = 2 min Hyd. volume = 271 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 170.15 ft Reservoir name = BMP Pond Max. Storage = 362 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) Hyd No. 7 Hyd No. 6 0 Total storage used = 362 cuft Pond Report 9 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation= 170.10 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cult) Total storage(cult) 0.00 170.10 6,140 0 0 0.50 170.60 7,425 3,391 3,391 1.50 171.60 8,770 8,098 11,489 1.90 172.00 9,520 3,658 15,147 2.00 172.10 9,645 958 16,105 2.90 173.00 10,835 9,216 25,321 3.90 174.00 12,210 11,523 36,844 4.50 174.60 13,060 7,581 44,425 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 1.30 0.00 0.00 Crest Len(ft) = 2.10 13.90 0.00 0.00 Span(in) = 18.00 1.30 0.00 0.00 Crest El.(ft) = 172.10 173.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 169.90 170.10 0.00 0.00 Weir Type = Rect Broad --- --- Length(ft) = 62.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.65 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 175.10 OOF 4.00 174.10 .100 3.00 173.10 2.00 172.10 1.00 171.10 0.00 170.10 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q Discharge(cfs) 10 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.968 2 726 11,059 ------ ------ ------ BMP Pre-Developed 2 SCS Runoff 11.81 2 718 23,613 ------ ------ ------ BMP Post-Developed 3 Reservoir 0.242 2 1026 19,593 2 172.19 16,979 Post Through Pond 4 SCS Runoff 1.292 2 724 5,669 ------ ------ ------ Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 170.10 0.000 1.0-in Storm Thru Pond Wet Pond-Dunn Erwin.gpw Return Period: 2 Year Friday, 08/ 18/2023 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 1.968 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 11,059 cuft Drainage area = 8.740 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.90 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 11.81 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 23,613 cuft Drainage area = 5.050 ac Curve number = 73.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.242 cfs Storm frequency = 2 yrs Time to peak = 1026 min Time interval = 2 min Hyd. volume = 19,593 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 172.19 ft Reservoir name = BMP Pond Max. Storage = 16,979 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 0 Total storage used = 16,979 cuft 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 1.292 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 5,669 cuft Drainage area = 3.680 ac Curve number = 54.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 5.050 ac Curve number = 73.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 170.10 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 0 Total storage used = 0 cuft 17 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 11.08 2 724 36,153 ------ ------ ------ BMP Pre-Developed 2 SCS Runoff 24.03 2 716 48,548 ------ ------ ------ BMP Post-Developed 3 Reservoir 3.668 2 728 44,444 2 172.74 22,686 Post Through Pond 4 SCS Runoff 6.109 2 722 17,548 ------ ------ ------ Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 170.10 0.000 1.0-in Storm Thru Pond Wet Pond-Dunn Erwin.gpw Return Period: 10 Year Friday, 08/ 18/2023 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 11.08 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 36,153 cuft Drainage area = 8.740 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.90 min Total precip. = 5.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 24.03 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 48,548 cuft Drainage area = 5.050 ac Curve number = 73.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 3.668 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 44,444 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 172.74 ft Reservoir name = BMP Pond Max. Storage = 22,686 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 3 Hyd No. 2 0 Total storage used = 22,686 cuft 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 6.109 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 17,548 cuft Drainage area = 3.680 ac Curve number = 54.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 5.050 ac Curve number = 73.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 170.10 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 0 Total storage used = 0 cuft 24 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 33.28 2 724 96,328 ------ ------ ------ BMP Pre-Developed 2 SCS Runoff 46.70 2 716 96,005 ------ ------ ------ BMP Post-Developed 3 Reservoir 15.82 2 724 91,854 2 174.28 40,415 Post Through Pond 4 SCS Runoff 17.22 2 722 45,347 ------ ------ ------ Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 170.10 0.000 1.0-in Storm Thru Pond Wet Pond-Dunn Erwin.gpw Return Period: 100 Year Friday, 08/ 18/2023 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 33.28 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 96,328 cuft Drainage area = 8.740 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.90 min Total precip. = 8.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 46.70 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 96,005 cuft Drainage area = 5.050 ac Curve number = 73.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 15.82 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 91,854 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 174.28 ft Reservoir name = BMP Pond Max. Storage = 40,415 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 — Hyd No. 2 0 Total storage used =40,415 cuft 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 17.22 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 45,347 cuft Drainage area = 3.680 ac Curve number = 54.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 5.050 ac Curve number = 73.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,08/18/2023 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 170.10 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 0 Total storage used = 0 cuft NORTH North American Green MRICN 5401 St. Wendel-Cynthiana Rd. 1� Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Grass Channel Name Grass Channel Discharge 4.75 Channel Slope 0.0111 Channel Bottom Width 3 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Unreinforced Vegetation Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Depth Mannings N Shear Stress Shear Stress Remarks Factor Pattern Unreinforced Straight 4.75 cfs 1.44 ft/s 0.74 ft 0.07 4 Ibs/ft2 0.51 Ibs/ft2 7.86 STABLE - Vegetation Underlying Straight 4.75 cfs 1.44 ft/s 0.74 ft 0.07 4 Ibs/ft2 0.36 Ibs/ft2 11.05 STABLE - Substrate DS75 Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Staple Depth Shear Stress Shear Stress Remarks Factor Pattern DS75 Straight 4.75 cfs 2.33 ft/s 0.51 ft 0.036 1.6 Ibs/ft2 0.35 Ibs/ft2 4.55 STABLE D Unvegetated Underlying Straight 4.75 cfs 2.33 ft/s 0.51 ft 0.036 1.51 Ibs/ft2 0.27 Ibs/ft2 5.65 STABLE D Substrate Bowman North Carolina,Ltd. Erwin Road Residential Dunn,NC-Storm Drain"C"calculations Rational Runoff Coefficient"C" Grass Channe1#1 Drainage Area(acres): 2.43 Proposed Land Uses: Land Use Description Acres %site Runoff"C" "C" Roofs 0.03 1% 0.95 0.01 Asphalt/Concrete Pavement 0.00 0% 0.95 0.00 Lawn 0.92 38% 0.3 0.11 Wooded 1.49 61% 0.2 0.12 Total Area= 2.43 Cumulative"C= 0.25 ii0= 7.92 Q10= 4.75 Grass Channel#2 Drainage Area(acres): 1275.38 Proposed Land Uses., Land Use Description Acres %site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.01 0% 0.95 0.00 Lawn 1275.37 100% 0.3 0.30 Wooded 0.00 0% 0.2 0.00 Total Area= 1275.38 Cumulative"C"= 0.30 ii0= 7.92 Q1 0= 3030.36 Erwin Road Residential Spread Calculations Bowman North Carolina, Ltd. 919-553-6570 Inlet Capacity Chart Rainfall Intensity = 7.92 in/hr Single Sump (Type E grate, P = 6.94ft) Maximum Spread = 7 feet Double Sump (Type E grate, P = 9.92ft) Inlet # Inlet Q Surface Q Slope K or P Inlet Qcap Spread Bypass Remarks Drainage Area C Sub. Bypass Total Long. Trans. Q To Inlet # CB-106 0.22 0.52 0.91 0.00 0.91 0.015 0.02 24 0.79 6.44 0.12 CB-105 bypass CB-105 1.49 0.44 5.19 0.12 5,31 0.015 0.02 6.94 0.69 12.50 4.62 CB-104 sag CB-104 0.19 0.82 1.23 4.62 5.86 0.015 0.02 6.94 0.73 12.96 5.12 CB-103 sa CB-103 0.63 0.53 2.64 5.12 7,77 0.015 0.02 6.94 0.87 14.41 6.90 CB-102 sag CB-102 0.13 0.82 0.84 6.90 7,74 0.015 0.02 6.94 0.87 14.39 6.87 CB-101 sag CB-107 0.88 0.56 3.90 0.00 3.90 0.015 0.022 6.94 0.60 10.49 3.30 CB-101 sag CB-101 0.15 0.62 0.74 10.17 10.91 0.015 0.02 6.94 1.08 16.37 9.83 sag Bowman [Von7H .AR0 LIMA APPENDIX C Storm Drainage System Calculations 100-System Erwin Road Residential—Dunn, NC 10 1 P a g e 61 9.4 N 18" DIP IE' 161.07 N _ PIN #1506_ '�- ` OUT 18" DIP IE: 161.02 79-1980 � 1 R#A06-79_1792 '�-_ � BRENT S C p DA �' _ �s� DB 629, P CRANE TORE I CKE __ DB 388I C 9R -_�--_\���\ ��\\ ZONING R#10 AND R- ANNUALONS CHANCE CHANCE FLOOD \ I ZONING #160 _ 20 HAZARD ( \ R'10 AND � �_ FLOOD HAZARD (GIs) 1511 -_ R-20 ��\S � _ (GIS) �\ PAN R 1 WE 5 SMH # 1 �- \ �' RIM: 176.96 \� _ DB 3 P1N _ \�`� s\�\ \SL10 ER y CARY #1508_79- ��_ `. _ �/ Zo �= MAC KCST 261 _ I I \ 09'39'19' E-611.63' TOTAL 381.63' SMH #1564 I 2 - \ \ ` RIM: 176,48 I OB 146HEIM & CARRIE S�# _ \\ \ \ EASEMENT PVC IE: 170.02 b D' PG 418 E2 LIN _�'- ` � 15' SANITARY SEWER PROJECT: (A) IN 8" i y� 0 20NING R#�D00 210.00' \ \ PER CITY OF DUNN - B IN 6" DIP IE: 171.01 1 \ �Id LINE \� \ 451 10 ( ) 169.90 �- AND R,20 � \ \ \`` � E-451-03 AND E-PG 719 OUT 8"PVC IE: (B) ' __ V \ DB 687, �- Z IRS (#5) I \ \\ \ \ 6 DI� P1 N #150 7 __ �x ON LINE SMH #1351 \ I a DONALD 6 9'2558 NANCY I• JOHNSON & ` \\ \ s��� RN 18" DIP IE: 161.07 N 89'21'51" W J i ' DB 927 OHNSON �� �� OUT 18" DIP IE: 161.07 E 3508 FG 622 \ _ PIN #1506-79- � #1510 �� � � � � �— � � 352.56 TOTAL JOHNSON I DONALD ►• ' ZONING R_10 � \ //^��� � � � 44, PG 739 ` s -� — ZONING R-10 I w01 —— i 69 `-�_ _s — \ SMH # ��c__ 1325 " I I pop RIM: 169.69 \ C top = —1�F--- �- (A) IN 8" PVC IE: 162. 0 • 7. \ _ s��-;� g IN18" DIPIE: 161. d F \ IRS \ — �- — — _ s\ \--- OUT 18" DIP IE: 161.51 1003 \� / \ _W -_ SSAs _ SMH # °/ \ \ _ L14 RIM: 178.75 \ �� _ __ _ J J CB-1 04 / ��s-. _ - - -- - IN 8" PVC IE.. 171.17 $ \ 1 \ \s '-- -- -- -_ - cfl c 171.14 \ 18"�pIP N M E o R PVC IE.. o H OUT 8" \ \ / CB-102 _� `� �(��5 -- _1� DI � o � z #132E \ \ \ Z co T 3 0 Z - — . 1 169.91 ��\ \ 15' o J o RK mi \ C B 101 ——— \ IN 18 DIP IE. 1.51, \ \ \ \ \ EA J J \ \\ r)UT 18" DIP IE: ' \ SL m a 0 co I o \ \ AT CAB ° \ \ SLIDE 127 SMH p052 RIM: 182.51 i \ " PVC IE: 175.06 \ ' CB-103 IN 8 I ° 5 OUT IE:175.01 / S � ) � \ $" PVC `�\ m CB-106 I V(#) \\ \ 1 CB-107 \ \ \ \ \ m \ 5.43 43 143.67' \\ I 5448 \ � \ 45 \ A INE s1& RALPH9D. LUCAS \ I \ \ \ N ��'' Z PG 373 as \ 1 \ ' 5 ~ 9� O �DB 4084, \ m - I . I� \ ZONING R-1� c — O O \67�cg21\ F- F- \ \ � l o IRS (#5) JJ \\ `\ h--1 Q z 0 I N _ _\ / \ I \ L3, ""I O Cc _ (#3) / Q 14 ^ IRS / / I ` \\ I I I L - \ I / — — — 1 � / I � — ' 1 � � PIN #1506-79-5869 \ I� CONC #1074 � R�64 \ ° / J2M2 HOLDINGS, LLC I I — — DB 4184, PG 339 a� r ' \ wll - 4� m / \ I I ROAD AND R-20 / " h--i W PIN #1506-79 5 _ — — _ I \ 1 \ ZONING R / S 52'20'04 E QARE, LLCM \ 1 _ 9.04 ACRES � � AREA: � / � ' 51.28' TIE � Z DB 4084, PG 373 • / \ I ` , ZONING R-10 �� m l — — — — — J \ / ~ i � � z (FULL OF DEBRIS) I I ( — — �. • \ `�.`�g 3 " CB #1152 / \ — — — — — 1 z \\ I �\ / PIN #1507-70-80TA PIN # 6.45 I $ - _ P OSCAP, DALE JOHNSON & TAMMY '� 1507-70- - — _ 8696_ — — — — J, \ \ KAY JOHNSON RI CHARD D. CHA BOTTOM IE: 184.61 — — — PIN #1506-79- I I — — o �� "^ \ \ PG 840 %, pg 3201, PG 9 — - MELODY Y. WEST \ \ \ DB 171#1 i PLAT C I #119 / LOT 14, DB 4159, PG 1032 n \ PIN r^� �J SLIDE 127E #1406-10 /��// oy �`\\ \\ \\ #1506-79-8o9R 9\\ ZONING R-10 ✓ #400ZON ZONING R E1 N h 0 ZONING R � � \ � %\ � PIN g966 \\ DB D94 M PIG 073 \ ` �. PB 2003, PG 421 � m \ ANNIE LEE MELNN \ 117 8874 \ DB 4154, PG 675 \ ZONING R-10 o �\ /J m N ` PIN #1506-79- PG 421 °ti ,/ z GERARDO RjjNEODOY B UIN ERO& \\ #115 RUTH MARTINEZ Q ZONING R-10 �\ / /\ O \ DB 3469, PG 651 i \ / -00 NOT E;� EA NOT SURVEYED I \\ DUE TONIMALS NOT IN AN ZONING R-10 \ N ENCLOSUR�• �0?' cr / o W, PRELIMINARY DO NOT USE FOR CONSTRUCTION PLAN STATUS DATE DESCRIPTION XXX XXX XXX DESIGN DRAWN CHKD SCALE H: 1„ =XXX; V. 1 = XXX GRAPHIC SCALE OB No. 220124-01-004 50 0 25 50 100 200 DATE _ 2023 FILE No. ( IN FEET ) 1 inch = 50 ft. ���� SHEET Cad file name: V:\220124 - Ben Stout Construction\220124-01-004 (ENG) - Erwin Road, Dunn, NC\Engineering\Engineering Plans\Construction Documents\220124-01-004-DDP (Inlets).dwg Bowman North Carolina,Ltd. Erwin Road Residential Dunn,NC-Storm Drain"C"calculations Rational Runoff Coefficient"C" Catch Basin #101 Drainaoe Area(acres): 0.151 Proposed Land Uses: Land Use Description Acres %site Runoff"C" "C" Roofs 0.03 19% 0.95 0.18 Asphalt/Concrete Pavement 0.05 31% 0.95 0.30 Lawn 0.08 50% 0.3 0.15 Wooded 0.00 0% 0.2 0.00 Total Area= 0.15 1 Cumulative"C"= 0.62 iio= 7.92 Q10= 0.75 Catch Basin #102 Drainaoe Area(acres): 0.133 Proposed Land Uses: Land Use Description Acres %site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.11 80% 0.95 0.76 Lawn 0.03 20% 0.3 0.06 Wooded 0.00 0% 0.2 0.00 Total Area= 0.13 1 Cumulative"C"= 0.82 iio= 7.92 Q10= 0.86 Catch Basin #103 Drainaoe Area(acres): 0.629 Proposed Land Uses: Land Use Description Acres %site Runoff"C" "C" Roofs 0.11 18% 0.95 0.17 Asphalt/Concrete Pavement 0.11 17% 0.95 0.16 Lawn 0.41 65% 0.3 0.20 Wooded 0.00 0% 0.2 0.00 Total Area= 0.63 Cumulative"C= 0.53 iio= 7.92 Q1o= 2.62 Catch Basin #104 Drainaoe Area(acres): 0.193 Proposed Land Uses: Land Use Description Acres %site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.15 80% 0.95 0.76 Lawn 0.04 20% 0.3 0.06 Wooded 0.00 0% 0.2 0.00 Total Area= 0.19 1 Cumulative"C= 0.82 iio= 7.92 Q1o= 1.25 Catch Basin #105 Drainaoe Area(acres): 1.493 Proposed Land Uses: Land Use Description Acres %site Runoff"C" "C" Roofs 0.20 14% 0.95 0.13 Asphalt/Concrete Pavement 0.16 10% 0.95 0.10 Lawn 0.97 65% 0.3 0.19 Wooded 0.17 11% 0.2 0.02 Total Area= 1.49 Cumulative"C"= 0.44 H o= 7.92 Q10= 5.26 Catch Basin #106 Drainage Area(acres): 0.224 Proposed Land Uses: Land Use Description Acres %site Runoff"C" "C" Roofs 0.03 13% 0.95 0.12 Asphalt/Concrete Pavement 0.05 22% 0.95 0.21 Lawn 0.13 60% 0.3 0.18 Wooded 0.01 5% 0.2 0.01 Total Area= 0.22 1 Cumulative"C"= 0.52 H O= 7.92 Q10= 0.93 Catch Basin #107 Drainaoe Area(acres): 0.879 Proposed Land Uses: Land Use Description Acres %site Runoff"C" "C" Roofs 0.17 19% 0.95 0.18 Asphalt/Concrete Pavement 0.18 20% 0.95 0.19 Lawn 0.53 61% 0.3 0.18 Wooded 0.00 0% 0.2 0.00 Total Area= 0.88 1 Cumulative"C"= 0.56 H O= 7.92 Q10= 3.86 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan CB#107 Outfall 7 v 1 46 CB#101 2 ,NO CB#102 6 4g CB#103 3 ; 4 CB#104 43 CB#105 h 5'A CB#106 Project File: 100 System.stm Number of lines:7 Date:7/19/2023 Storm Sewers v2022.00 Storm Sewer Inventory Report Page Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) M (ft) (in) (n) (K) (ft) 1 End 50.844 25.602 Comb 0.00 0.15 0.62 5.0 169.50 0.59 169.80 24 Cir 0.012 1.50 175.91 46 2 1 120.664 84.626 Comb 0.00 0.13 0.82 5.0 170.00 0.58 170.70 24 Cir 0.012 1.50 175.00 42 3 2 200.183 -1.274 Comb 0.00 0.63 0.53 5.0 170.80 0.55 171.90 18 Cir 0.012 1.50 175.52 44 4 3 29.723 -86.632 Comb 0.00 0.19 0.82 5.0 172.60 1.01 172.90 15 Cir 0.012 1.47 175.55 43 5 4 175.129 77.338 Comb 0.00 1.49 0.44 5.0 173.10 0.57 174.10 15 Cir 0.012 1.00 178.24 85 6 2 29.014 -88.216 Comb 0.00 0.22 0.52 5.0 171.60 0.69 171.80 15 Cir 0.012 1.00 175.00 45 7 1 86.290 -95.385 Comb 0.00 0.88 0.56 5.0 172.50 0.58 173.00 15 Cir 0.012 1.00 176.00 48 Project File: 100 System.stm Number of lines:7 Date: 7/19/2023 Storm Sewers v2022.00 Storm Sewer Summary Report Page Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) M (ft) (ft) (ft) (ft) No. 1 46 12.93 24 Cir 50.844 169.50 169.80 0.590 170.72 171.09 n/a 171.09 End Combination 2 42 9.29 24 Cir 120.664 170.00 170.70 0.580 171.09 171.79 n/a 171.79 j 1 Combination 3 44 8.01 18 Cir 200.183 170.80 171.90 0.549 171.97 173.07 0.69 173.75 2 Combination 4 43 5.70 15 Cir 29.723 172.60 172.90 1.009 173.75 173.87 n/a 173.87 j 3 Combination 5 85 4.75 15 Cir 175.129 173.10 174.10 0.571 174.03 175.02 0.37 175.39 4 Combination 6 45 0.83 15 Cir 29.014 171.60 171.80 0.689 171.92 172.16 0.13 172.16 2 Combination 7 48 3.56 15 Cir 86.290 172.50 173.00 0.579 173.25 173.76 n/a 173.76 1 Combination Project File: 100 System.stm Number of lines:7 Run Date: 7/19/2023 NOTES: Return period= 10 Yrs. ;j-Line contains hyd.jump. Storm Sewers v2022.00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 1 End 50.844 0.15 3.69 0.62 0.09 1.95 5.0 7.3 6.6 12.93 18.82 6.24 24 0.59 169.50 169.80 170.72 171.09 0.00 175.91 46 2 1 120.664 0.13 2.66 0.82 0.11 1.37 5.0 6.6 6.8 9.29 18.66 5.30 24 0.58 170.00 170.70 171.09 171.79 175.91 175.00 42 3 2 200.183 0.63 2.31 0.53 0.33 1.15 5.0 5.9 7.0 8.01 8.43 5.43 18 0.55 170.80 171.90 171.97 173.07 175.00 175.52 44 4 3 29.723 0.19 1.68 0.82 0.16 0.81 5.0 5.8 7.0 5.70 7.03 5.21 15 1.01 172.60 172.90 173.75 173.87 175.52 175.55 43 5 4 175.129 1.49 1.49 0.44 0.66 0.66 5.0 5.0 7.2 4.75 5.29 4.87 15 0.57 173.10 174.10 174.03 175.02 175.55 178.24 85 6 2 29.014 0.22 0.22 0.52 0.11 0.11 5.0 5.0 7.2 0.83 5.81 3.11 15 0.69 171.60 171.80 171.92 172.16 175.00 175.00 45 7 1 86.290 0.88 0.88 0.56 0.49 0.49 5.0 5.0 7.2 3.56 5.32 4.60 15 0.58 172.50 173.00 173.25 173.76 175.91 176.00 48 Project File: 100 System.stm Number of lines:7 Run Date: 7/19/2023 NOTES:Intensity=88.24/(Inlet time+ 15.50)^0.83; Return period=Yrs. 10 c=cir e=ellip b=box Storm Sewers v2022.00 Hydraulic Grade Line Computations Page Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) M (ft) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) M M (ft) (K) (ft) 1 24 12.93 169.50 170.72 1.22 2.00 6.45 0.56 171.28 0.000 50.844 169.80 171.09 1.29"" 2.15 6.02 0.56 171.66 0.000 0.000 n/a 1.50 n/a 2 24 9.29 170.00 171.09 1.09 1.75 5.29 0.44 171.53 0.000 120.66 1170.70 171.79 j 1.09"" 1.75 5.32 0.44 172.23 0.000 0.000 n/a 1.50 n/a 3 18 8.01 170.80 171.97 1.17" 1.48 5.43 0.46 172.43 0.549 200.18 171.90 173.07 1.17 1.47 5.43 0.46 173.53 0.550 0.550 1.100 1.50 0.69 4 15 5.70 172.60 173.75 1.15 1.02 4.81 0.49 174.24 0.000 29.723 172.90 173.87 j 0.97" 1.02 5.60 0.49 174.35 0.000 0.000 n/a 1.47 0.72 5 15 4.75 173.10 174.03 0.93" 0.97 4.87 0.37 174.39 0.571 175.12 174.10 175.02 0.92 0.97 4.88 0.37 175.39 0.572 0.571 1.001 1.00 0.37 6 15 0.83 171.60 171.92 0.32" 0.25 3.35 0.13 172.05 0.000 29.014 171.80 172.16 0.36"" 0.29 2.87 0.13 172.28 0.000 0.000 n/a 1.00 0.13 7 15 3.56 172.50 173.25 0.75" 0.77 4.65 0.32 173.57 0.000 86.290 173.00 173.76 0.76"" 0.78 4.55 0.32 174.08 0.000 0.000 n/a 1.00 n/a Project File: 100 System.stm Number of lines:7 Run Date: 7/19/2023 Notes:" depth assumed;""Critical depth.;j-Line contains hyd.jump c=cir e=ellip b=box Storm Sewers v2022.00 Storm Sewer Profile Proj. file: 100 System.stm w C � C 7 C � C 7 C= 7 O p C J Os J O C J O C J C J O ' N ' 10 ' �' p000 W pF.00 MCA CO t170) M N� o CO n�o moo m ��I v h�� Iq CO Elev. (ft) p w � 6 P r r +p -6W O WWW r WWW CM WWW 7 WWW LO W Ba W Ca E > E > ; M E » 'N E » }o E » B E � rnC� U) D c U) WE U) W U) WE r4 WE 191.00 191.00 186.00 186.00 181.00 181.00 176.00 176.00 - -- -- - - - - - - 0.57% ------------ 2 171.00 ° 171.00 12 - FBT 0 166.00 166.00 0 50 100 150 200 250 300 350 400 450 500 550 600 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 100 System.stm oS _j o oIZW oCO opo o �P Elev. (ft) g r � N +oWww o ww caE > > B E > 184.00 184.00 181.00 181.00 178.00 178.00 175.00 175.00 172.00 "' ---------- - - - - - - - - ----- - — - - - 172.00 169.00 169.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 100 System.stm o= J o 0 COL o0 O 6N N (6M Elev. (ft) o `� (6 `` oWww o ww m E > > @ E > 65EaS U) ES 185.00 185.00 182.00 182.00 179.00 179.00 176.00 176.00 -------------- ------------------- -------------------------------------- ------ 173.00 173.00 If 86.290, @ 0.68 170.00 i L 170.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Bowman [Von7H .AR0 LIMA APPENDIX D Erosion and Sediment Control Calculations Rip-Rap Calculations Skimmer Basin Riser Temporary Diversion Ditches Erwin Road Residential—Dunn, NC 11 1 P a g e EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Erwin Rd Dunn, NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Rip-Rap Apron#1 Pipe Diameter d= 24 Pipe Slope s= 0.59 % Manning's number n= 0.013 Flow Q= 12.93 cfs Velocity V= 4 ft/s Dissipator Dimensions Zone= 1 Stone Filling Class= A Entry Width(2 X Do)= 4.0 ft Length(4 X Do)= 8.0 ft Width(La+Do)= 10.0 ft Min.Thickness= 12 inches Min.Stone Diameter= 3 inches ~ 8.0 1 4.0 10.0 L J� *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP_ErwinRd.xlsx 7/19/2023 Page 1 of 5 Rip-Rap Apron#2 Pipe Diameter d= 18 in Pipe Slope s= 0.62 % Manning's number n= 0.013 Flow Q=If 4.601 cfs Velocity V= 2 ft/s Dissipator Dimensions Zone= 1 Stone Filling Class= A Entry Width(2 X Do)= 3.0 ft Length(4 X Do)= 6.0 ft Width(La+Do)= 7.5 ft Min.Thickness= 12 inches Min.Stone Diameter= 3 inches 6.0� 1 3.0 7.5 1 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP_ErwinRd.xlsx 7/19/2023 Page 2 of 5 EROSION CONTROL CALCULATIONS(Skimmer Basin) Project Information Project Name: Erwin Rd Dunn,NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Skimmer Basin#1 Drainage Area Total,AT= 6.54 Ac Disturbed,Ao= 7.94 Ac 10-year Runoff(Q10) C= 0.50 Tp= 5.00 min 110= 7.92 in/hr 010= 25.9 cfs Surface Area Required SA= 325sf x Q10 SA= 8,422 sf Volume Required VR= 1800 cf/Ac x Ao VR= 11,779 cf Sediment Trap Dimensions L.= 167 ft (Spillway Length) W= 60 ft (Spillway Width) D= 2.0 It (Depth of Storage) Side Slopes= 2:1 Ltop= Lpp= 175 ft L.= 159 ft Wt., Wb. W.w= 68 ft Lhp= WW= 52 ft L/W Ratio= 2.8:1(must be 2:1 to 6:1) Elevations Description Elevation Top of Berm 174.00 (allow 1ft freeboard above spillway flow height) Emergency Spillway 172.50 Sediment Storage 172.00 Cleanout Mark 171.00 (half of storage height) Bottom 170.00 Provided SAP= 10,020 sf > 8,422 VP= 18,288.0 cf > 11,779 Emergency Spillway-10 Year Storm 110= in/hr Q10= 25.91 cfs h= 0.5ft CW= 3 Lw= 25 ft Calculate Skimmer Size Basin Volume in Cubic Feet 18,288 Cu.Ft Skimmer Size 2.5 Inch Days to Drain* 3 Days Orifice Radius 1.2 Inch[es] Orifice Diameter 2.5 Inch[es] *In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet 167 60 Feet VOLUME 18288 Cu.Ft. Bottom dimensions in feet 159 521 Feet Depth in feet 2 Feet EROSION CONTROL CALCS(SKIMMER BASINS) Project Information Project Name: Erwin Rd Dunn,NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Anti-Flotation Device(Skimmer Basin#1) 4'x 4' Outlet Structure Area: 16.0 sf Top of Basin Elev.: 172.0 Bottom of Basin Elev.: 170.0 Volume: 32.0 cf (Water Displaced-Top of Pond to Bottom of Pond) Weight: 1997 Ibs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 2,396 Ibs Volume of Concrete Req'd: 16.0 cf (Unit WT of Concrete=150 pcf) Volume Provided: 69.5 cf (4'x4'riser x 2.0'=32cf,5'x5'footing x 1.5'=37.5cf) EROSION CONTROL CALCS (TEMPORARY DITCH #1) Project Information Project Name: Erwin Rd Dunn, NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Temporary Ditch#1 Drainage Area Total,AT= 4.96 Ac 25-year Runoff(Q25) C= 0.50 Tc= 5.00 min 125= 7.92 in/hr Q25= 19.6 cfs NORTH North American Green 5401 St. Wendel-Cynthiana Rd. A1w1ER�` N L l N Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Temporary Ditch#1 Name Temporary Ditch#1 Discharge 19.6 Channel Slope 0.0127 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Sandy Loam(GM) DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 19.6 cfs 4.06 ft/s 1.32 ft 0.032 1.6 Ibs/ft2 1.05 Ibs/ft2 1.53 STABLE D Unvegetated Underlying Straight 19.6 cfs 4.06 ft/s 1.32 ft 0.032 1.51 Ibs/ft2 0.55 Ibs/ft2 2.74 STABLE D Substrate EROSION CONTROL CALCS (TEMPORARY DITCH #2) Project Information Project Name: Erwin Rd Dunn, NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Temporary Ditch#2 Drainage Area Total,AT= 0.88 Ac 25-year Runoff(Q25) C= 0.50 Tc= 5.00 min 125= 7.92 in/hr Q25= 3.5 cfs NORTH North American Green 5401 St. Wendel-Cynthiana Rd. A1w1ER�` N L l N Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Temporary Ditch#2 Name Temporary Ditch#2 Discharge 3.5 Channel Slope 0.0154 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Sandy Loam(GM) DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 3.5 cfs 2.68 ft/s 0.6 ft 0.035 1.6 Ibs/ft2 0.57 Ibs/ft2 2.79 STABLE D Unvegetated Underlying Straight 3.5 cfs 2.68 ft/s 0.6 ft 0.035 1.51 Ibs/ft2 0.34 Ibs/ft2 4.42 STABLE D Substrate