Loading...
HomeMy WebLinkAbout420002_Closure Info_20230918PG¢NCULTUR,, Xr �� uG Q WP � FUNDED 18�� Steve Troxler North Carolina Department of Agriculture Commissioner and Consumer Services Division of Soil and Water Conservation September 18, 2023 SUBJECT: Fishing Creek Farm Lagoon Volume Estimates TO: Derek Halberg, Tar River Land Conservancy Chelsea Ricks, Fishing Creek SWCD Terry Best, NC NRCS David B. Williams Director Fishing Creek Farm, AWS420002, has requested assistance to close their lagoons, convert them to freshwater ponds and file to have their permit rescinded with DWR. A site visit was conducted to survey volumes of waste in both lagoons and collect liquid and sludge waste samples from each lagoon. Waste samples were delivered to the NCDA&CS Agronomics laboratory for analysis and results will be provided at a later date. Please find attached liquid and sludge volume estimates for each lagoon based on lagoon levels at the time of survey on September 14, 2023 and lagoon designs. Liquid volumes in each lagoon will need to be adjusted for the closure plan to reflect liquid waste transferred between lagoons to assist in creating a slurry for land application. If you have any further questions or concerns do not hesitate to contact me. Sincerely, Michael Shepherd Technical Specialist WUP/NM, WA Division of Soil and Water Conservation MAILING ADDRESS LOCATION Division of Soil and Water Conservation Telephone: (919) 707-3770 Old Health Building 1614 Mail Service Center 216 W. Jones St. 3" Floor Raleigh, NC 27699-1614 Raleigh, NC 27603 An Equal Opportunity Employer Sludge Estimate Data Sheet For estimating sludge in lagoon. Lagoon ID Lagoon 1 Completed by Michael Shepherd, Sam Edwards, Mark Seibert Date 9/14/2023 Freeboard 36" Grid Point Distance to top of Sludge Layer* Distance to bottom of Lagoon* Thickness of Sludge Layer 1 4 9.25 5.3 2 4.1 10.25 6.2 3 3.5 9.5 6.0 4 3 9 6.0 5 3 8.75 5.8 6 3 9 6.0 7 3 9 6.0 8 3 9.25 6.3 9 4.25 10 5.8 10 4 10.1 6.1 11 3.25 10 6.8 12 4 9.75 5.8 13 5.75 10.6 4.9 14 7 10.5 3.5 15 7.5 10.5 3.0 16 8 11.25 3.3 17 4.5 9.75 5.3 18 4.75 9.75 5.0 19 5 11 6.0 20 6 9 3.0 21 22 23 24 Average 4.5 9.8 5.3 *Record distance measurements in tenths of a foot from the water surface. LAGOON CLOSURE VOLUMES FARM NAME: Fishing Creek Farm 9/14/2023 Lagoon1 LAGOON INSIDE TOP DEMENSION LENGTH: WIDTH: MITRE- 113-1 TOP OF DAM ELEVATION: LIQUID LEVEL ELEVATION: TOP OF SLUDE ELEVATION: LAGOON BOTTOM ELEVATION SIDE SLOPES END 1: SIDE SLOPES END 2: SIDE SLOPES END 3: SIDE SLOPES END 4: VOLUME LIQUID: VOLUME SLUDGE: TOTAL VOLUME: OF SLUDGE AND LIQUID TOTAL CUBIC FOOT: OF SLUDGE AND LIQUID 550 FT. 228.5 FT. 2.89 ACRE 76.80 73.80 69.25 64.00 2.5 2.5 2.5 2.5 3,603,548.3 GALLONS 3,483,818.4 GALLONS 7,087,366.7 GALLONS 947,508.92 CUBIC FT. LAGOON CLOSURE VOLUMES FARM NAME: Fishing Creek Farm 9/14/2023 Lagoon 2 LAGOON INSIDE TOP DEMENSION LENGTH: WIDTH: MITRE- 113-1 TOP OF DAM ELEVATION: LIQUID LEVEL ELEVATION: TOP OF SLUDE ELEVATION: LAGOON BOTTOM ELEVATION SIDE SLOPES END 1: SIDE SLOPES END 2: SIDE SLOPES END 3: SIDE SLOPES END 4: VOLUME LIQUID: VOLUME SLUDGE: TOTAL VOLUME: OF SLUDGE AND LIQUID TOTAL CUBIC FOOT: OF SLUDGE AND LIQUID 618 FT. 156.5 FT. 2.22 ACRE 86.10 79.00 78.35 73.00 2.5 2.5 2.5 2.5 337,144.9 GALLONS 2,365,977.5 GALLONS 2,703,122.4 GALLONS 361,380.00 CUBIC FT. s- Poogle Earth 20 19 18 15 16 17 14 13 12 9 10 11 S 7 5 6 4 3 1 2 ga�iomaw ao A N 500 n Operator: Fishing Creek41_ F-:-•.I!_::County:_ .: Halifax ::; Date: 02/17/11 Distance to nearest residence (other than owner): 1500.0 feet ":-!vj 0RAR'( 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. _ . 0 lbs 0 sows (farrow to feeder) x 522 lbs. = 0 lbs 5090 head (finishing only) x 135 lbs. = 687150 Ibs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 3500 head (wean to feeder) x 30 lbs. = 105000 lbs Describe other : 0 Total Average Live Weight = 792150 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON = Volume = ,-..792150 . lbs. ALW x Treatment Volume(CF)/Ib. ALW Treatment Volume(CF)/Ib. ALW = 1 CF/lb. ALW Volume = 792150 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet T � a 4. TOTAL DESIGNED VOLUME CO Inside top length (feet)-------=------------- 550.0 Inside top width (feet)=--------------------- 228.5 c Top of dike elevation (feet)---------------- 76.1 Bottom of lagoon elevation (feet)------------ 64.0 Freeboard (feet)----------------------------- 1.0 Side slopes (inside lagoon)------------------ 2.5 : 1 Total design .volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 2.5 2.5 2.5 2.5 545.0 223.5 11.1 AREA OF TOP LENGTH * WIDTH = 545.0 223.5 121808 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 489.5 168.0 82236 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 517.3 195.8 405007 (AREA OF MIDSECTION * 4) CU. FT. = (AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM) * DEPTH/6 121807.5 405006.8 82236.0 1.9 Total Designed Volume Available = 1126743 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length "Width = 550.0 228.5 125675.0 square feet Buildings (roof and lot water) - 0.0 square feet Describe this area. — TOTAL DA 125675.0 square feet Design temporary storage period to riod to b e 150 days. 5A. Volume of waste produced - Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 792150 lbs. ALW/135 lbs. ALW * 1.37 gal/day 150 days - Volume = 1205828 gals. or 161207.0 cubic feet = - 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume 0.0 gallons/day ` 150 days storage/7.48 gallons . per CF Volume = 0.0 cubic feet . 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 150 days excess rainfall = 9.4 inches Volume = 9:4 in ` DA / 12 inches per foot Volume = 98445.4 cubic feet 5D. Volume of 25 year - 24 hour storm a Volume = 6.7" inches / 12 inches per foot' DA Volume = 70168.5 cubic feet TOTAUREQUIRED TEMPORARY STORAGE 5A. 5B. SC.. 5D. _ � TOTAL 6. SUMMARY 161207 cubic feet 0 cubic feet 98445 cubic feet 70169 cubic feet 329821 cubic feet f Temporary storage period____________________> Rainfall in excess of evaporation=====______> 25 year - 24 hour rainfall__________________> - - Freeboard___________________________________> Side Inside top length___________________________> Inside top Top of dike elevation_______________________> Bottom of lagoon elevation__________________> Total required volume_______________________> Actual -design volume________________________> Seasonal high watertable elevation (SHWT)===> Stop pumping Must be > or = to -the SHWT elev.====______> - Must be.> or = to min. req. treatment el.=> Required minimum treatment volume=====______> Volume at stop pumping elevation=====_______> Start pumping Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> Volume at start pumping elevation=====______> Required volume to be pumped________________> Actual volume -planned to be pumped=====_____> Min: thickness of soil liner when required==> 7. DESIGNED BY-/� I Z APRROVED BY: DATE DATE: ,)-171( NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: 4- 150 days 9.4 inches 6.7 inches 1.0 feet 2.5 : 1 550.0 feet 228.5 feet 76.1 feet 64.0 feet 1121971 cu.ft. 1126743 cu.ft. 60.0 feet 72.2 feet 60.0 feet 70.0 feet . 792150 cu.ft. 792784 cu.ft. 74.5 feet 1056574 cu.ft. 1053153 cu. ft., 259652 cu. ft.' 260370 cu.ft. 1.8 feet Operatqr: Fishing Creek #2 S..:•:-: •County: Halifax -Date: 02/17/11 Distance to nearest residence (other than owner): 1500.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. _ . 0 lbs 0 sows (farrow to feeder) x 522 lbs. = 0 lbs 4420 head (finishing only) x 135 lbs. = 596700 lbs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs Describe other : 0 Total Average Live Weight = 596700 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON - Volume = 596700 lbs. ALW. x Treatment Volume(CF)/Ib. ALW Treatment Volume(CF)/Ib. ALW = 1 CF/lb. ALW Volume = 596700 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION - Volume = 0.0 cubic feet - 4. TOTAL DESIGNED VOLUME Inside top length (feet)-------------------- 618.0 Inside top width (feet)----------- 156.5 Top of dike elevation (feet)----------------- 86.1 Bottom of lagoon elevation (feet)------------ 73.0 - - Freeboard (feet)----------------------------- 1.0 Side slopes (inside lagoon)------------------ 2.5 : 1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 2.5 2.5 2.5 2.5 613.0 151.5 12.1 AREA OF TOP LENGTH * WIDTH = 613.0 151.5 92870 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 552.5 91.0 50278 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 582.8 121.3 282634 (AREA OF MIDSECTION * 4) CU. FT._ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 92869.5 282633.8 50277.5 2.0 Total Designed Volume Available = 858658 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 618.0 156.5 96717.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. - - -TOTAL -DA. - 96717.0 square feet - Design temporary storage period to riod to b e 150 days. 5A. Volume of waste produced - Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 596700 lbs. ALW/135 lbs. ALW * 1.37 gal/day 150 days Volume 908310 gals. or 121431.8 cubic feet - - 5B. Volume of wash water - This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume— -.0.0 gallons/day * 150 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 150 days excess rainfall = 9.4 inches Volume= 9.4. in * DA / 12 inches per foot Volume = 75761.7 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 6.7 inches / 12 inches per foot ` DA •`" ` Volume = 54000.3 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 121432 cubic feet 5B., 0 cubic feet 5C. 75762 cubic feet 5D. 54000 cubic feet -TOTAL 251194 cubic feet 6. SUMMARY Temporary storage period====================> 150 days Rainfall in excess of evaporation===========> 9.4 inches 25 year - 24-hour rainfall==================> 6.7 inches Freeboard===================================> 1.0 feet :..-.... Side slopes=================================> 2.5 . 1 __ ..-..._. Inside -top len th======------===============> 618.0 feet Inside top width------------======----------> 156.5 feet Top of dike elevation=======================> 86.1 feet - Bottom of lagoon elevation------------------> 73.0 feet Total required volume-----------------------> 847894 cu. ft. Actual design volume--------------==------==> 858658 cu. ft. Seasonal high watertable elevation (SHWT)===> 44.0 feet - - Stop um in elev.--------------------------> 82.1 feet Must be >-or-= to the SHWT elev.==========> 44.0 feet Must be > or = to min. req. treatment el.=> 79.0 feet _- = Required minimum treatment volume===========> 596700 cu. ft. Volume at stop pumping elevation---------===> 597026 cu. ft. - Start pumping elev._________________________> 84.5 feet - Must be at bottom of freeboard & 25 yr. rainfall - Actual volume less 25 yr.- 24 hr. rainfall==> 804658 cu. ft. - Volume at start pumping elevation===========> 803622 cu. ft. Re uired volume to be um ed======----------> q P p ---------------- 197193 cu. ft. ' Actual volume planned to be pumped==========> 206597 cu. ft. ` = MinAhickness-of soil liner when required==> 1.9 feet 7. DESIGNED BY. PRO ED BY:. = - DATE: 1,7-11 DATE: - NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: