HomeMy WebLinkAboutSite Inspection 9.18.23 Rutherford Bypass R-2233 BBBAWetland Inspection Report
Project Num: 20200362 Version: 2 Status: Issued
Project Name: NCDOT -Improvements to US 221 - Rutherfordton Project Type: Road
Coun • ass (R-2233BB BA) me ce/repair/improveme
h • Ruthero ns Region: sheviW
Location: NCDOT - Improvements to US 221 - Rutherfordton Bypass (R-2233BB BA)
Latitude: +350 22' 43" Longitude: -810 56' 60"
SW Plan Location:
Site Owner Name: NC DOT Division 13
Inspection Date: 9/18/2023
Reason for Inspection: Follow-up
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Robert K Mitchell
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Phone:
page: 1
Site Number: 20200362 Owner: Bryan, Roger D
Inspection Date: 9/18/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up
Site inspection was conducted on September 18, 2023 by Kevin Mitchell with the Asheville Regional Office. The site
visit was a follow up inspection for a self reported sediment loss that occured on September 12, 2023. According to rain
gauge data, the north end of the project received 2.5" of rain in 45 minutes. Ross Straup was present during the
inspection.
All areas with reported sediment loss were inspected and no additional cleanup is necessary in jurisdictional areas. The
following are items that need attention:
- Station 995+00 LT L3 - Sediment in the pipe needs to be removed. Groundcover is needed above outlet and inlet of
pipe.
- Station 990+00 LT L3 - Mulch and seed where off -site sediment has been removed.
- Station 982+00 LT L3 - Roper Loop - Maintain basin.
-Station 961+00 LT L3 -Add another basin/trap per Roadside Environmental report. Stabilize slopes.
- Station 32+00 LT Y6 - Seed slope.
page: 2
Site Number: 20200362 Owner: Bryan, Roger D
Inspection Date: 9/18/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up
Permit (401 WOO
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
page: 3