Loading...
HomeMy WebLinkAboutNCG190112_Inspection Report_20200730 Compliance Inspection Report Permit:NCG190112 Effective: 10/05/20 Expiration: 05/31/25 Owner: Waff Contracting Inc SOC: Effective: Expiration: Facility: Waff Contracting Inc. County: Chowan 0 Wharf Landing Dr Region: Washington Edenton NC 27932 Contact Person:Stephanie Powell Title: Phone: 252-482-7071 Directions to Facility: US 17 to Edenton take exit 224 and head north on Queen St. take first left to waterfront follow to end of Wharf Landing Drive System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 07/30/2020 Entry Time 03:OOPM Exit Time: 03:15PM Primary Inspector:Thom Edgerton Phone: 252-946-6481 Secondary Inspector(s): Reason for Inspection: Other Inspection Type: Compliance Evaluation Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG190112 Owner-Facility:Waff Contracting Inc Inspection Date: 07/30/2020 Inspection Type:Compliance Evaluation Reason for Visit: Other Inspection Summary: I recommend issuance of NCG190112 for Waff Contacting activities at this site. Page 2 of 3 Permit: NCG190112 Owner-Facility:Waff Contracting Inc Inspection Date: 07/30/2020 Inspection Type:Compliance Evaluation Reason for Visit: Other Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ ❑ ❑ Comment: Page 3 of 3