Loading...
HomeMy WebLinkAboutWQ0044703_Application (FTSE)_20230801i� • I 14-4 ever IJ ENeINEERS PLANNERS SURVEYORS LANDSCAPE ARCHITECTS & ASSOCIATES, INC. RECFJVED/NCDEPIR/DWR July 31, 2023 'AUG 12023 Mr: David May Water Quality NCDEQ - Division of Water Resources "" Regional operations Section 943 Washington Square Mall Washington- Regional office Washington, North Carolina 27889 SUBJECT: Town of Winterville — Sanitary Sewer Pump Station Rehabilitation 2020 Fast Track Application and Permitting Rivers File 2020068-D Dear Mr. May: On behalf of the Town of Winterville, we are submitting a Fast. Track application for the Sanitary Sewer Pump Station Rehabilitation 2020 Project. This project will include the replacement of two (2) aged sewer pump stations, installing two-(2) 12" force mains, abandonment of a sewer pump station, pump station electrical upgrades, manhole repairs/installations, abandoning manholes, installing new sewer pipes, and abandoning existing sewer pipes with flowable fill. Specifics for the improvements are including -in the Application Narrative. Enclosed are the following required documents:. • One (1) check in the amount of $480.00 for the application fee. Two (2) copies of the project narrative. • One (1) original and one (1) copy of the executed application form: • Three (3) maps showing the location of the proposed facilities to be constructed. • One (1) original USGS Topographic Map identifying the entire project associated with this Application. Should you have any questions or if we can provide any additional information that will provide a favorable review, please do not hesitate to contact our office at (252) 752-4135: Respectfully, Stephen Reece, E.I. Design Engineer H cc: Tern L. Parker, Town of Winterville Anthony Bowers, Town of Winterville M. Blaine Humphrey, P.E.,, Rivers and Associates. File 2020068-D P:IMunilWinterville 2020 Sanitary_Sewer Pump Station Rehab-202006814DM YID-PermittinglTastTracAlFast Track Caver Leuer.docx — - 107 E. Second Street, Greenville, NC 27858 PO Box 929, Greenville, NC 27835 Phone: 252-752-4135 Fax: 252-752-3974 NCBELS Lic. No. F-0334 www.rlversandassoclates.corn NCBOLA Lic. No. C-312 I ENGINEERS PLANNERS SURVEYORS LANDSCAPE ARCHITECTS Pt ivers S ASSOCIATES, INC. RECENED/NCDENR/DWR : MEMORANDUM_ TO: DWR =.Washington Regional Office AUG -1 2023 CC: Anthony Sowers, Assistant Town Manager Quality uality Regional Operations Sectlon M. Blaine Humphrey, P.E.; Rivers and Associates Washington Regionai.Office FROM: Stephen Reece, E.I. DATE: July 31, 2023 SUBJECT: Fast -Track Application Narrative Town of Winterville — Sanitary Sewer Pump Station Rehabilitation 2020 File 2020068 D The purpose of this memorandum is to provide a narrative of the Town of Winterville's proposed Sanitary Sewer Pump Station Rehabilitation project to accompany the project's Fast -Track Application. The major items of work for this project submitted for review under the Fast Track permitting program include rehabilitation/replacement of four (4) aged sewer pump stations in the Town of Winterville_ Chapman Street Pump Station improvements includes construction of a new 1,325 GPM submersible sewage pump station, installation of new electrical equipment, relocation of existing emergency generator, 35 LF of 8-inch DIP force main, and 4,500 LF of 12-inch PVC force main. Robinson Heights Pump Station improvements includes replacement of the electrical gear and addition of an automatic transfer switch. Winterville Crossing Pump Station will be abandoned and flow diverted via 860 LF of new 10" and 15" PVC gravity sewer. The Church Street Pump Station improvements includes construction :of a new 1,511 GPM submersible sewage pump station, electrical modifications, and 3,000 LF of 12-inch PVC force main. This project is intended to provide improvements to the Winterville Sanitary Sewer System by increasing pumping capacity of the Chapman and Church Street Pump Stations which are .. inadequate to supportthe current demand and nominal population growth. The- Chapman -Street Pump Station is over fifty years old and the existing dual 6" force mains will need to .be upsized to 12". to support the expected growth. Recent flow data and proposed development in the service area of the Church Street Pump Station has indicated the pump station will exceed the current available capacity. Additionally, the existing 8" force main is currently undersized for the existing flow and will need to be increased to handle the proposed flow from the pump station. The 401 Water Quality Certification is currently pending. 107 E'Second Street, Greenville, NC 27858 PO Box:929, Greenville, NC 27835 Phone: 252-752-4135 Fax: 252-752-3974 �NCBELS Uc. No. F-0334 www.riversandassociates.corn NCBOLA Lic. No. C-312 i RECEIVED/NCDENR/DWR 2U$Ci$ us us aa�<u,u.� .. nNNwNMq AUG —1 2023 'a90p MTopo ILI IGravity Sewer Layout Write a description for your map. Proposed Gravity Sewer Tie-in a. y� wp r within Ext. Utility Easement in a previously disturbed area Sewer Outfall Legend 0' Christ Covenant School Line Line Y� J alvary. Chapel East Carolnajj' J ry R Ext. Utility lent in a usly red area Figure LM3 Church Street 12-inch Force ,=4 Main - i { Y Ci k i l0" Kf v ,&..ILN Legend United Rentals Winterville Church of Christ Street Lift Station AN a� R O _I 0 I a V I I : ------- REEDY -__ BRANCH Rpgp I / r-_ r I ' , r I I / / I / r / / I I / I / y ♦ v ♦ ♦y F j _—__--_—___—-__— ^� 1 It WIV7EROLLE PARKWAY/MEMORIAL BOULEVARD/NC HWY. I1 \ '- 11 m 1- I�'-- - I o g � 111 II Y RL F �� yL�L43o r.__I CHAPMAN SrREEr NJ I I II —i'��— WWWWY E R wR�a £ I11 sdayp3bIl= � v _ I_�GR_ SlSTREET -T 1 I f ____._.- I_ { # lK 4 z 1 D � S m/ rn s / � V 2 � UJ Rai n ,g / m s / A�\1 I O t 1 d C 1 i a.. N 2020 SANITARY SEWER PUMP STATION REHAB TOWN OF WINTERVILLE PITT COUNTY NOFTH OAROLIN/ MHSS STRUCTURE luo[mea FA d a c m o O m G7 m Q m f lases,z y � N T ro w Z � 0 it� Divers • S,,ca,s..e 107 East Second Slntl NElkr 01.... Ill.. NC clean 11 i 1 ..en (252) lnn-UJ5 tn....1. kll=m