SU$JECT: Town of Winterville — Sanitary Sewer Pump Station Rehabilitation 2020
Flow Tracking for Sewer Extension Application
Rivers File 2020068-D
Dear Mr. May: ,
On behalf of the Town of Winterville, we are submitting the Flow Tracking for Sewer Extension forms for
the Sanitary Sewer Pump Station Rehabilitation 2020 Project Fast Track Application. This project will
include the replacement of two (2) aged - sewer pump stations, installing two (2) 12" force mains,
abandonment of a sewer pump station, pump station electrical upgrades, manhole repairs/installations,
abandoning manholes, installing new- gravity sewer pipes, and abandoning existing sewer pipes with
flowable fill.
The associated Fast Track application for the above referenced:project was submitted to your office on July
31, 2023. The Town of Winterville Sanitary Sewer Pump Station Rehabilitation 2020 project will increase
the capacity of the pumps at the Chapman Street and Church Street Pump Stations but will not generate any
additional wastewater. The abandonment of the Winterville Crossing Pump Station will divert
approximately 50,000 GPD from the Chapman Street Pump Station to the Church Street Pump Station.
Enclosed are the following required documents:
• Chapman Street Pump Station FTSE Application for CMSD collection system
• Church Street Pump Station FTSE Application for CMSD collection system
• Winterville Crossing Pump Station FTSt Application for CMSD collection system
• Winterville Crossing Pump Station FTSE Application for.the Town of Winterville Collection System
Should you have any questions or if we can provide any additional information that will provide a favorable
review, please do not hesitate to contact our office at (252) 752-4135.
Respectfully,
Stephen Reece, P.E.
Project Engineer
cc: Terri L. Parker, Town of Winterville.
Anthony Bowers, Town of Winterville
M. Blaine Humphrey, P.E., Rivers and Associates.
Sarah Toppen, NCDEQ-Division of Water Resources
File 2020068-D
P: Wunil Winterville 202Q Sanitary_Sewer Pump Station_Rehab-20200681ADAfUv' D-PermittingTFastTrackT S'E Cover
Letter. docx
107 E. Second Street, Greenville, NC 27858 PO Box.929, Greenville, NC 27835 Phone: 252-752-4135 Fax: 252-752-3974.
NCBELS Lic. No. F-0334 www.nversandassociates.com NCBOLA Lic. No. C-312
State of North Carolina
Department of )Environmental Quality
. pv
Division of Water Resources
p Water Reso Flow, Traclun* for Sewer Extension Applications
r (FTSE 104 8)
Entity Requesting Allocation: Town of Winterville
Project Name for which flow is being requested: F 0
More thmn Dire FISE nu be requfied for a single project (fYhe , wnu of the WWTP is not respomffik fvr ell pump
skdom along the route of the proposed waslewakr ffont
h Complete this section' only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Contentnea Metropolitan Sewerage District
r
b. WWTP Facility Permit #. NCO032077
AllJlows are ih MGD
c. WWI? facility's permitted flow 3.5
d. Estimated obligated flow not yet -tributary to the WWTP 0.511
e. WWTP facility's actual avg. flow- 1.585
£ Total flow for this specific- request 0.0
g. Total actual and obligated flows to the facility 2 096
h Percent of permitted flow used 59.9%
11. Co�aplete this section for, each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) .Q (D)-W-C) Mi-(A=D) .
Design Obligated,
Pump Pump Average Approxr Not Yet Total Curiant
Station Station Firm Daily Flow** Currant TdWtary Flow Plus
(Name. or . Permit Capacity, * (Firm / pfl, Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow, MGD' MGb - Flow Capacity***
- Ripednal O L J /. I W� � V a D .r 0.05
^—r-�—
14 2.176 0.8703 0.310 0.05 U.6
Church. _ 0.5103 .
The Firm Capacity (design flow) of any pump station,is defined a the meximnrii Pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the -firm capacity of the pump station divided by a peaking factor
(pf) not leas than 2.5, .per Section 2.WA)(4Xc) of the Minimnm Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pnmp station located
between the project connection point and the WW1T where the Available Capacity is < 0.
Downstream Facility Name (Sewer): CMSD.
Downstream Pi emit Number. NCO032077
Page 1 of 6
FTSE 1.0-18'
i
an&w&4ea G��o�o0&a*2 demeraye .0hfikt
CMSD.
POST OFFICE BOX 477
GRIFTON, NORTH CAROUNA 28630
CHARLES M. SUITHWICK, JR.
DISTRICT MANAGER
August 25, 2023
Mr. Anthony Sowers
Assistant Town Manager, Winterville
Winterville, NC 28590
Re: Wastewater Flow Acceptance
Sanitary Sewer PS Rehabilitation-2020
Mr. Bowers:
I am in receipt of your request for the Contentnea Metropolitan Sewerage District (CMSD) to accept the
wastewater generated from the above -mentioned rehabilitation project. It is understood that the
Impact to the WWTP will be zero (0) gpd as this project diverts wastewater flow into different "points of
entry" into the CMSD collection system and this project is not identifying any new sources of wastewater
to be generated.
I have provided the requested FfSE 10-18 forms and supporting documentation for my calculations.
Please advise if you need additional information.
Sincerely,
Charles M.Smithwick, Jr.
District Manager; CMSD
Cc: Stephen Reece, Design Engineer II, Rivers and Associates, Inc. (via email)
CIiff'McGuffin, Public Works Director, Town of Winterville (via email)
State.of North Carolina
Department of Environmental Quality
Division of Water Resources
Division of Water Resources Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Town of Winterville
Project Name for which flow is being requested: SS PS Rehab. 20200
More than one ME nary be requiredfor a single project (f the owner of the WWTP Is not responsible for all pump
stations along the route of the proposed wastewater, f low.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Contentaea Metropolitan Sewerage District
b. WWTP Facility Permit #: --NCO 1 032077
All flows are in MGD
c. WWTP facility's permitted flow 3.5
d. Estimated obligated flow not yet tributary to the WWTP .511
e. WWTP facility's actual avg. flow 1.585
f. Total flow for this specific request 0.0
g. Total actual and obligated flows to the facility_ 2.096
h. Percent of permitted flow used 59.9%
II. Complete this section for each pump station you are responsible for along the route of Us proposed:
wastewater flow.
List pump stations located between the project connection point and the WWTP::
(A) M (C) (D) O"A-D)
Design
Average Approx. Obligated, Total
Pump Pump Daily Current Not Yet :Current Flow
Station Station. Firm Flow" Avg. Daily Tributary Plus
(Name or Permit Capacity, * (Firm / pt), Flow, Daily Flow, Obligated Available ;
Number) No. MGD MGD MGD MGD Flow Capacity'4*t
Hwy 11 WQCS00080 75 3.0 , 1.263 .419 1.682 1.318
Reedy Br .WQCS00080 2.16 .864 .29 .082 .372 .492'
* The Firm Capacity (design flow) of any pump station pis defined as the maximum pumped flow .
that can be achieved with the largest pump taken out of service.
Design Average Daffy Flow is the firm capacity of the pump station divided by a' pealing factor
(pi) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream`.Faciiity Maine (Sewer): Contentnea Metropolitan Sewerage Distr,
Downstream Permit Number: NCO032077
Page l of 6
-18
FTSE 10
State of North Carolina
Department of Environmental Quality
nWK Division of Water Resources
Division of Water Resources Flow Tracldng for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Town of Winterville
Project Name for which flow is being requested: SS PS Rehab 202 -
More than one FTSE ntay be required for a single project !f t/te owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Contentnea Metropolitan Sewerage District
b. WWTP Facility Permit #: NCO032077
All flows are in MGD
c. WWTP facility's permitted flow 3.5
d. Estimated obligated flow not yet tributary to the WWTP .511
e. WWTP facility's actual avg. flow 1.585
£ Total flow for this specific request 0.0
g. Total actual and obligated flows to the facility 2.096
h. Percent of permitted flow used 59.9%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the W M:
(A) (C) (D)=(B+Q (E)=(A-D)
Design
Average Approx. Obligated, Total
Pump Pump Daily Current Not Yet Current Flow
Station Station Firm Flow** Avg. Daily Tributary Plus
(Name or Permit Capacity, (Firm / pf), Flow, Daily Flow, Obligated Available
Number) No. MOD MGD MGD MGD Flow Capacity***
Hwy 11 WQCS00080 7.5 3.0 1.263 .419 1.682 1.318
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Contentnea Metropolitan Sewerage Distr.
Downstream Permit Number: NCO032077
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I Charles M. Smithwick, Jr. certify to the best of my knowledge that the addition of
the volume of wastewater to he permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing Official Signature Date
Title of Signing Official
Page 2 of 6
FTSE 10-1 S
State of North Carolina
Department of Environmental Quality
biviston of Water Resources
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Town of Winterville
Project Name for which flow is being requested: SS PS Rehab 2020 %"sn
More than one FTSE may he required for a single project ifthe owner of the WWTP is not responsible for al1 pump
stations along the route of the proposed waste►vater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Contentnea Metropolitan Sewerage District
b. WWTP Facility Permit #: NCO032077
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
All flows are in MGD
3.5
.511
1.585
0.0
2.096
59.9%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
Pump Pump
Station Station Firm
(Name or Permit Capacity,
Number) No. MGD
Hwy 11 WQCS00080 7.5
(A)
(B)
(C)
(D)—(B+C)
(E)=(A-D)
Design
Average
Approx.
Obligated,
Total
Daily
Current
Not Yet
Current Flow
Flow"
Avg. Daily
Tributary
Plus
(Firm / pf),
Flow,
Daily Flow,
Obligated
Available
MGD
MGD
MGD
Flow
Capacity***
3.0
1.263
.419
1.692
1.318
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Contentnea Metropolitan Sewerage Distr.
Downstream Permit Number: NCO032077
Page 1 of 6
FTSE 10-18
III. Certification Statement;
I Charles M. Smithwick, Jr.. certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this proj ect has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies'and procedures using the bestavailable data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing Official Signature Date
4j 6AID
Tltle of Signing Official
Page 2 of 6
FTSE 10-18
12 Month Pump Station Flows (Total,and Average)
11 Main Plant Gd ton PS
H 11 PS Ayden PS
Wintervllle PS
20�
Total
43.842
Average
1.414
Total
6.438
Average
0.208
Total.
30.2181
Average Total
0.975 7.628
Average
0.246
Total
9.016
Average
0.291
August
September 40.942
1.365
5.7431
0.191
27-841
6.8061
0.227
8.153
0.272
October
41.616
1.342
5.549
0.179
29.475
L016 6.07
0.196
8.552
0.276
Novembe
40.223
1.341
5.122
0.171
31.774
1.059 5.806
0.194
8.137
0.271
42.7n
1.378
5.594
0.18
35.419
1-143 6 722
0.217
8.659
0.279
December
2023
49.823
1.607
5J98
0.187
39.804
L294 9.189
0.296
8.781
0.283
January.
February ,
57.262
2 045
6.795
0.243
48.735
1.741 12.663
0.452
9.5811
0.342
March
48.878
1577
:6.611
0.213
41.239
133 9.441
0305
8.977
0.29
2,07-7
8.289
0.276
5032
1677 14394
0.48
9.548
0.318
April
62.32
May
53.02
1.71
7.537
0.243
42.795
138 11202
0.361
9
0.29
June
48317
1.61
6.615
0.22
38.46
.1.282 9.717
0324
8:237
0.275
July
48.23
1.556
6.711
0.216
41.603
1.342 9,535
0.308
9.165
0:296
Total/Average 577.194
1.585167
76.802
0.210593
457.682
1,253083
109.168
03005
105.806
0.29025
Firm Capacity
Design Capadty
Actual, Flow
Available Capadrty
Obligated Not Trib.
Capactty Remaining
Grafton PS
1.32
0.53
0.210583
0.319417
0.01932
03D0097
Hwy U.
7.5
3
1.263083
1.736917
0,418999
1317918
Ayden PS
2.4
0.962
0.5005
0.6615
0.11664
0.54486
Wintervflle
2.16
0.8641..
0.29025
0.57375
0.082289
0.491461
PS
Note: All flows
are In MGD
IS85167
L214833
' azil
1AII VTP
Act. Flows
gOgy Cap.
Avail.Cap•
Obligated
cap. Remain
% Cap.
0.703833
E. 98905
.. .
..c _ . • �: • :. ..oil W •
..a •:1 11. c.
FM 1
�■■��
�����r��s�
• r.���-----�-
�MVU
����������r�����■�
M.
• - r - • • , -�-
- . . . ....
Totals
527
8
519
243,319
Total Flow Not Tributa
Note: U dated by Winterville on 418-2023
i.on Br. Canal Sewer OUtFall is "Aces Tor Autism"
schooUcam us
Wastewater Flow Tracking
Flow Not Tributary to WWTP
Grifton
Date CMSD
#Lots
Point of
Accepted
Subdivision
#Lots Platted
#Lots w/Construction
Rernainint
Entry
Flow Not Tribute
Yr[Month
Harris Landing
43
3 Bedroom
0
43
F of Dreams
15480
2023-Jan
44
4 Bedroom
0
44
F of Dreams
21120
Meadowbrook
23
3 Bedroom
0
23
Water St
8280
2023-4an
23
4 Bedroom
0
23
Water St
11040
Lane Farms Sub
100
3 Bedroom
0
100
vwvM
36000
2023-Ju -Revised
Totals
233
01
233
Total flow not Tributary to WWTP
L
91920