Loading...
HomeMy WebLinkAboutWQ0044703_Application (FTSE)_20230901• ivers �, &ASSOCIATES, INC. - August 31, 2023 Mr. David May NCDEQ — Division of Water Resources IRS LANDSCAPE ARCHITECTS Laselfiched RECEIVED/NCDENR/DWR SEP - 1 ?0�3 943 Washington Square Mall Water Quality Washington, North Carolina.27889 Regional dPera>ions Section Washington Regional office SU$JECT: Town of Winterville — Sanitary Sewer Pump Station Rehabilitation 2020 Flow Tracking for Sewer Extension Application Rivers File 2020068-D Dear Mr. May: , On behalf of the Town of Winterville, we are submitting the Flow Tracking for Sewer Extension forms for the Sanitary Sewer Pump Station Rehabilitation 2020 Project Fast Track Application. This project will include the replacement of two (2) aged - sewer pump stations, installing two (2) 12" force mains, abandonment of a sewer pump station, pump station electrical upgrades, manhole repairs/installations, abandoning manholes, installing new- gravity sewer pipes, and abandoning existing sewer pipes with flowable fill. The associated Fast Track application for the above referenced:project was submitted to your office on July 31, 2023. The Town of Winterville Sanitary Sewer Pump Station Rehabilitation 2020 project will increase the capacity of the pumps at the Chapman Street and Church Street Pump Stations but will not generate any additional wastewater. The abandonment of the Winterville Crossing Pump Station will divert approximately 50,000 GPD from the Chapman Street Pump Station to the Church Street Pump Station. Enclosed are the following required documents: • Chapman Street Pump Station FTSE Application for CMSD collection system • Church Street Pump Station FTSE Application for CMSD collection system • Winterville Crossing Pump Station FTSt Application for CMSD collection system • Winterville Crossing Pump Station FTSE Application for.the Town of Winterville Collection System Should you have any questions or if we can provide any additional information that will provide a favorable review, please do not hesitate to contact our office at (252) 752-4135. Respectfully, Stephen Reece, P.E. Project Engineer cc: Terri L. Parker, Town of Winterville. Anthony Bowers, Town of Winterville M. Blaine Humphrey, P.E., Rivers and Associates. Sarah Toppen, NCDEQ-Division of Water Resources File 2020068-D P: Wunil Winterville 202Q Sanitary_Sewer Pump Station_Rehab-20200681ADAfUv' D-PermittingTFastTrackT S'E Cover Letter. docx 107 E. Second Street, Greenville, NC 27858 PO Box.929, Greenville, NC 27835 Phone: 252-752-4135 Fax: 252-752-3974. NCBELS Lic. No. F-0334 www.nversandassociates.com NCBOLA Lic. No. C-312 State of North Carolina Department of )Environmental Quality . pv Division of Water Resources p Water Reso Flow, Traclun* for Sewer Extension Applications r (FTSE 104 8) Entity Requesting Allocation: Town of Winterville Project Name for which flow is being requested: F 0 More thmn Dire FISE nu be requfied for a single project (fYhe , wnu of the WWTP is not respomffik fvr ell pump skdom along the route of the proposed waslewakr ffont h Complete this section' only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Contentnea Metropolitan Sewerage District r b. WWTP Facility Permit #. NCO032077 AllJlows are ih MGD c. WWI? facility's permitted flow 3.5 d. Estimated obligated flow not yet -tributary to the WWTP 0.511 e. WWTP facility's actual avg. flow- 1.585 £ Total flow for this specific- request 0.0 g. Total actual and obligated flows to the facility 2 096 h Percent of permitted flow used 59.9% 11. Co�aplete this section for, each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) .Q (D)-W-C) Mi-(A=D) . Design Obligated, Pump Pump Average Approxr Not Yet Total Curiant Station Station Firm Daily Flow** Currant TdWtary Flow Plus (Name. or . Permit Capacity, * (Firm / pfl, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD' MGb - Flow Capacity*** - Ripednal O L J /. I W� � V a D .r 0.05 ^—r-�— 14 2.176 0.8703 0.310 0.05 U.6 Church. _ 0.5103 . The Firm Capacity (design flow) of any pump station,is defined a the meximnrii Pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the -firm capacity of the pump station divided by a peaking factor (pf) not leas than 2.5, .per Section 2.WA)(4Xc) of the Minimnm Design Criteria. *** A Planning Assessment Addendum shall be attached for each pnmp station located between the project connection point and the WW1T where the Available Capacity is < 0. Downstream Facility Name (Sewer): CMSD. Downstream Pi emit Number. NCO032077 Page 1 of 6 FTSE 1.0-18' i an&w&4ea G��o�o0&a*2 demeraye .0hfikt CMSD. POST OFFICE BOX 477 GRIFTON, NORTH CAROUNA 28630 CHARLES M. SUITHWICK, JR. DISTRICT MANAGER August 25, 2023 Mr. Anthony Sowers Assistant Town Manager, Winterville Winterville, NC 28590 Re: Wastewater Flow Acceptance Sanitary Sewer PS Rehabilitation-2020 Mr. Bowers: I am in receipt of your request for the Contentnea Metropolitan Sewerage District (CMSD) to accept the wastewater generated from the above -mentioned rehabilitation project. It is understood that the Impact to the WWTP will be zero (0) gpd as this project diverts wastewater flow into different "points of entry" into the CMSD collection system and this project is not identifying any new sources of wastewater to be generated. I have provided the requested FfSE 10-18 forms and supporting documentation for my calculations. Please advise if you need additional information. Sincerely, Charles M.Smithwick, Jr. District Manager; CMSD Cc: Stephen Reece, Design Engineer II, Rivers and Associates, Inc. (via email) CIiff'McGuffin, Public Works Director, Town of Winterville (via email) State.of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Winterville Project Name for which flow is being requested: SS PS Rehab. 20200 More than one ME nary be requiredfor a single project (f the owner of the WWTP Is not responsible for all pump stations along the route of the proposed wastewater, f low. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Contentaea Metropolitan Sewerage District b. WWTP Facility Permit #: --NCO 1 032077 All flows are in MGD c. WWTP facility's permitted flow 3.5 d. Estimated obligated flow not yet tributary to the WWTP .511 e. WWTP facility's actual avg. flow 1.585 f. Total flow for this specific request 0.0 g. Total actual and obligated flows to the facility_ 2.096 h. Percent of permitted flow used 59.9% II. Complete this section for each pump station you are responsible for along the route of Us proposed: wastewater flow. List pump stations located between the project connection point and the WWTP:: (A) M (C) (D) O"A-D) Design Average Approx. Obligated, Total Pump Pump Daily Current Not Yet :Current Flow Station Station. Firm Flow" Avg. Daily Tributary Plus (Name or Permit Capacity, * (Firm / pt), Flow, Daily Flow, Obligated Available ; Number) No. MGD MGD MGD MGD Flow Capacity'4*t Hwy 11 WQCS00080 75 3.0 , 1.263 .419 1.682 1.318 Reedy Br .WQCS00080 2.16 .864 .29 .082 .372 .492' * The Firm Capacity (design flow) of any pump station pis defined as the maximum pumped flow . that can be achieved with the largest pump taken out of service. Design Average Daffy Flow is the firm capacity of the pump station divided by a' pealing factor (pi) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream`.Faciiity Maine (Sewer): Contentnea Metropolitan Sewerage Distr, Downstream Permit Number: NCO032077 Page l of 6 -18 FTSE 10 State of North Carolina Department of Environmental Quality nWK Division of Water Resources Division of Water Resources Flow Tracldng for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Winterville Project Name for which flow is being requested: SS PS Rehab 202 - More than one FTSE ntay be required for a single project !f t/te owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Contentnea Metropolitan Sewerage District b. WWTP Facility Permit #: NCO032077 All flows are in MGD c. WWTP facility's permitted flow 3.5 d. Estimated obligated flow not yet tributary to the WWTP .511 e. WWTP facility's actual avg. flow 1.585 £ Total flow for this specific request 0.0 g. Total actual and obligated flows to the facility 2.096 h. Percent of permitted flow used 59.9% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the W M: (A) (C) (D)=(B+Q (E)=(A-D) Design Average Approx. Obligated, Total Pump Pump Daily Current Not Yet Current Flow Station Station Firm Flow** Avg. Daily Tributary Plus (Name or Permit Capacity, (Firm / pf), Flow, Daily Flow, Obligated Available Number) No. MOD MGD MGD MGD Flow Capacity*** Hwy 11 WQCS00080 7.5 3.0 1.263 .419 1.682 1.318 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Contentnea Metropolitan Sewerage Distr. Downstream Permit Number: NCO032077 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Charles M. Smithwick, Jr. certify to the best of my knowledge that the addition of the volume of wastewater to he permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Date Title of Signing Official Page 2 of 6 FTSE 10-1 S State of North Carolina Department of Environmental Quality biviston of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Winterville Project Name for which flow is being requested: SS PS Rehab 2020 %"sn More than one FTSE may he required for a single project ifthe owner of the WWTP is not responsible for al1 pump stations along the route of the proposed waste►vater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Contentnea Metropolitan Sewerage District b. WWTP Facility Permit #: NCO032077 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 3.5 .511 1.585 0.0 2.096 59.9% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station Firm (Name or Permit Capacity, Number) No. MGD Hwy 11 WQCS00080 7.5 (A) (B) (C) (D)—(B+C) (E)=(A-D) Design Average Approx. Obligated, Total Daily Current Not Yet Current Flow Flow" Avg. Daily Tributary Plus (Firm / pf), Flow, Daily Flow, Obligated Available MGD MGD MGD Flow Capacity*** 3.0 1.263 .419 1.692 1.318 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Contentnea Metropolitan Sewerage Distr. Downstream Permit Number: NCO032077 Page 1 of 6 FTSE 10-18 III. Certification Statement; I Charles M. Smithwick, Jr.. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this proj ect has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies'and procedures using the bestavailable data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Date 4j 6AID Tltle of Signing Official Page 2 of 6 FTSE 10-18 12 Month Pump Station Flows (Total,and Average) 11 Main Plant Gd ton PS H 11 PS Ayden PS Wintervllle PS 20� Total 43.842 Average 1.414 Total 6.438 Average 0.208 Total. 30.2181 Average Total 0.975 7.628 Average 0.246 Total 9.016 Average 0.291 August September 40.942 1.365 5.7431 0.191 27-841 6.8061 0.227 8.153 0.272 October 41.616 1.342 5.549 0.179 29.475 L016 6.07 0.196 8.552 0.276 Novembe 40.223 1.341 5.122 0.171 31.774 1.059 5.806 0.194 8.137 0.271 42.7n 1.378 5.594 0.18 35.419 1-143 6 722 0.217 8.659 0.279 December 2023 49.823 1.607 5J98 0.187 39.804 L294 9.189 0.296 8.781 0.283 January. February , 57.262 2 045 6.795 0.243 48.735 1.741 12.663 0.452 9.5811 0.342 March 48.878 1577 :6.611 0.213 41.239 133 9.441 0305 8.977 0.29 2,07-7 8.289 0.276 5032 1677 14394 0.48 9.548 0.318 April 62.32 May 53.02 1.71 7.537 0.243 42.795 138 11202 0.361 9 0.29 June 48317 1.61 6.615 0.22 38.46 .1.282 9.717 0324 8:237 0.275 July 48.23 1.556 6.711 0.216 41.603 1.342 9,535 0.308 9.165 0:296 Total/Average 577.194 1.585167 76.802 0.210593 457.682 1,253083 109.168 03005 105.806 0.29025 Firm Capacity Design Capadty Actual, Flow Available Capadrty Obligated Not Trib. Capactty Remaining Grafton PS 1.32 0.53 0.210583 0.319417 0.01932 03D0097 Hwy U. 7.5 3 1.263083 1.736917 0,418999 1317918 Ayden PS 2.4 0.962 0.5005 0.6615 0.11664 0.54486 Wintervflle 2.16 0.8641.. 0.29025 0.57375 0.082289 0.491461 PS Note: All flows are In MGD IS85167 L214833 ' azil 1AII VTP Act. Flows gOgy Cap. Avail.Cap• Obligated cap. Remain % Cap. 0.703833 E. 98905 .. . ..c _ . • �: • :. ..oil W • ..a •:1 11. c. FM 1 �■■�� �����r��s� • r.���-----�- �MVU ����������r�����■� M. • - r - • • , -�- - . . . .... Totals 527 8 519 243,319 Total Flow Not Tributa Note: U dated by Winterville on 418-2023 i.on Br. Canal Sewer OUtFall is "Aces Tor Autism" schooUcam us Wastewater Flow Tracking Flow Not Tributary to WWTP Grifton Date CMSD #Lots Point of Accepted Subdivision #Lots Platted #Lots w/Construction Rernainint Entry Flow Not Tribute Yr[Month Harris Landing 43 3 Bedroom 0 43 F of Dreams 15480 2023-Jan 44 4 Bedroom 0 44 F of Dreams 21120 Meadowbrook 23 3 Bedroom 0 23 Water St 8280 2023-4an 23 4 Bedroom 0 23 Water St 11040 Lane Farms Sub 100 3 Bedroom 0 100 vwvM 36000 2023-Ju -Revised Totals 233 01 233 Total flow not Tributary to WWTP L 91920