Loading...
HomeMy WebLinkAbout- 9/18/2023 8:26 AM (5)Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 270' Width 14' Avg. Existing -2 NWL NA NA Depth Final Project -4 NWL NA NA Depth 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. mud, mudddy sand 250 C. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the excavation in these areas: N/A d. High -ground excavation in cubic yards. N/A 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. NE New Hanover Conservancy disposal area 300' x 300' C. (i) Do you claim title to disposal area? ❑Yes ®No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: habitat enrichment d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA (ii) If yes, where? same f. (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (ii) If yes, how much water area is affected? N/A 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. f. (i) Has there been shoreline erosion during preceding 12 months? (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes El No El NA b If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Excavated material will be held in place and bucket and barge erosion controlled via existing earthen dikes at disposal site. Material will be stabilized and seeded after placement. C. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ❑Yes ®No ❑NA site? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize N/A environmental impacts. IAA 9/16/23 Date Water's Edge Creek Dock Dredging Project Name 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 3 of 3) Todd Skeen Applicant Name Applicant Signature 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06