HomeMy WebLinkAboutNCC223046_Annual Fee NOD Letter (2023 Fee)_20230918 ROY COOPER
Commar
ELIZABETH S.BISER
secretary 0
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
9/18/2023
H&H Constructors of Fayetteville, LLC
Attn:Scott Smith
3925 Sedgebrook St Suite 101
High Point, North Carolina 27265
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC223046-2023
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The
annual fee was billed on 8/1/2023 and was due on 9/1/2023.The annual fee applies to the following construction site:
Belews Ridge Phase 2
5278-5280,5281 Boat St; 3500-3506 Old Lake Ct;2008-2020 Dock Ridge Dr;8832 Belews Ridge Rd; 2009-2023,2100-2104
Dock Ridge Dr,Stokesdale, NC
Guilford County
Certificate of Coverage No. NCC223046
NC Reference No. NCG01-2022-3046
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact me at toby.vinson@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� N-1h Caroline(3--1 rnl Cm.0 -L4 Q-11N Dl ,k, C-9y.knrral and L—d R,,—,r+
5-Nrn lh IAA—,Street 1 Ib12 Afail 511i"C-11 flnkgh.Nth C-41-169-1612
+-� •--� 91-7079200