Loading...
HomeMy WebLinkAboutNCC223046_Annual Fee NOD Letter (2023 Fee)_20230918 ROY COOPER Commar ELIZABETH S.BISER secretary 0 DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality 9/18/2023 H&H Constructors of Fayetteville, LLC Attn:Scott Smith 3925 Sedgebrook St Suite 101 High Point, North Carolina 27265 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC223046-2023 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 8/1/2023 and was due on 9/1/2023.The annual fee applies to the following construction site: Belews Ridge Phase 2 5278-5280,5281 Boat St; 3500-3506 Old Lake Ct;2008-2020 Dock Ridge Dr;8832 Belews Ridge Rd; 2009-2023,2100-2104 Dock Ridge Dr,Stokesdale, NC Guilford County Certificate of Coverage No. NCC223046 NC Reference No. NCG01-2022-3046 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact me at toby.vinson@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Interim Director Division of Energy, Mineral,and Land Resources D_E Q� N-1h Caroline(3--1 rnl Cm.0 -L4 Q-11N Dl ,k, C-9y.knrral and L—d R,,—,r+ 5-Nrn lh IAA—,Street 1 Ib12 Afail 511i"C-11 flnkgh.Nth C-41-169-1612 +-� •--� 91-7079200