Loading...
HomeMy WebLinkAbout20231256 Ver 1_7653.1_Harvey Rd_PCN_8.20.23_20230912Preliminary ORM Data Entry Fields for New Actions ACTION ID #: SAW- 2022-00649 Begin Date (Date Received): Prepare file folder ❑ Assign Action ID Number in ORM ❑ 1. Project Name [PCN Form A2a]: Harvey Road (Oakdale Forest) 2. Work Type: ❑✓ Private ❑Institutional ❑Government ❑Commercial 3. Project Description / Purpose [PCN Form 133d and 133e]: Attached. 4. Property Owner / Applicant [PCN Form A3 or A41: Attached. 5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]: Brad Luckey, Pilot Environmental, Inc 6. Related Action ID Number(s) [PCN Form 135b]: 7. Project Location — Coordinates, Street Address, and/or Location Description [PCN Form B lb]: 35.98625,-79.92165 8. Project Location —Tax Parcel ID [PCN Form Bla]: 7821753273 9. Project Location — County [PCN Form A2b]: Guilford 10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Jamestown 11. Project Information — Nearest Waterbody [PCN Form 132a]: Bull Run Creek 12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form 132c]: Cape Fear/03030003 Authorization: Section 10 ❑ Section 404 ❑✓ Regulatory Action Type: ❑ Standard Permit ❑✓ Nationwide Permit # Regional General Permit # Jurisdictional Determination Request Section 10 and 404 ❑ ❑Pre -Application Request ❑ Unauthorized Activity ❑ Compliance ❑ No Permit Required Revised 20150602 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: NWP 29 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): N 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes N No For the record only for Corps Permit: ❑ Yes N No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Harvey Road 2b. County: Guilford 2c. Nearest municipality / town: Jamestown 2d. Subdivision name: Oakdale Forest 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Land Acquisition and Development Services, LLC 3b. Deed Book and Page No. 008707/01978 3c. Responsible Party (for LLC if applicable): David Michaels 3d. Street address: PO Box 9147 3e. City, state, zip: Greensboro, NC 27429 3f. Telephone no.: 336-207-8003 3g. Fax no.: 3h. Email address: dmichaels@windsorcompanies.us Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Bradley Luckey 5b. Business name (if applicable): Pilot Environmental, Inc. 5c. Street address: PO Box 128 5d. City, state, zip: Kernersville, NC 27285 5e. Telephone no.: 336.708.4997 5f. Fax no.: 5g. Email address: bluckey@pilotenviro.com Page 2 of 13 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 7821755114 1 b. Site coordinates (in decimal degrees): Latitude: 35.98625 Longitude: - 79.62165 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 31 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Bull Run Creek proposed project: 2b. Water Quality Classification of nearest receiving water: WS-IV, CA* 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site contains undeveloped wooded land and fields. The site is located within a rural residential area of Jamestown, North Carolina. 3b. List the total estimated acreage of all existing wetlands on the property: Wetland=0.351 ac 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Streams=1,637 LF 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to develop the site with Oakdale Forest, a townhome residential neighborhood. 3e. Describe the overall project in detail, including the type of equipment to be used: The overall project includes the construction of Oakdale Forest, a townhome residential neighborhood. The overall project includes the construction of townhomes, amenity and landscaped areas and stormwater control devices. In order to facilitate the proposed development and access lots, it is necessary to have a stream crossing and to impact one wetland with fill. Clearing and grading the site is necessary. Graders, haulers, excavators and other heavy equipment will be used during grading and construction of the site. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes El No ❑Unknown project (including all prior phases) in the past? Comments: SAW-2022-00649 4b. If the Corps made the jurisdictional determination, what type El Preliminary ❑Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Pilot Enviromental, Inc. Name (if known): Bradley Luckey Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. SAW-2022-00649 Delineation Concurrence dated 3.23.22 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 13 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Impacts to streams/wetlands, outside of those proposed in this application, are not anticipated as a result of the proposed project. Page 4 of 13 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Temporary T W1 ® P ❑ T Fill Bottomland ® Yes ® Corps 0.028 Hardwoods ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0.028 2h. Comments: Wetland Impact 1 will permanently impact 0.028 acres (1,2010 SF) of wetlands with fill. Temporary impacts to wetlands are not proposed. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ®T Road Fill/Rip- Rap/Dewateringl Unnamed ® PER ❑INT ® Corps ❑ DWQ 5 to 12 108/30/6 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 108/30/6 3i. Comments: Stream Impact 1 will permanently impact 108 linear feet (828 SF) for culvert/wall fill, permanently impact 30 linear feet (192 SF) with keyed in rip -rap and temporarily impact 6 linear feet (73 SF) of stream channel with associated de - watering. Page 5 of 13 PCN Form — Version 1.3 December 10, 2008 Version The area of stream impact 1 contains predominantly an exposed bedrock substrate that prohibits culvert burial. The applicant proposes to install the culvert at or slightly below existing stream bed elevation. The applicant will utilize natural bedrock within the area of the rip -rap dissipater where present. In areas that existing bedrock is not present, the applicant will supplement non-native stone and install to be keyed to existing stream bed elevations. The applicant has selected the type of and material of the culvert as the best possible alternative to ensure aquatic passage. Photographs depicting conditions at stream crossing 1 are included as an attachment. Therefore, the applicant requests written waiver of culvert burial requirements. Areas of temporary impact will be restored to similar pre -construction grades, stabilized with matting and native herbaceous seed mix. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: Open water impacts are not proposed. 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 13 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar -Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ® Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re uired? B1 ❑P❑T El Yes ❑ No B2 ❑P❑T El Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 6i. Comments: A buffer authorization certificate from local municiality will be approved prior to impacts occuring. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The applicant has designed the proposed residential sub -division to avoid other impact to streams and wetlands. The applicant has selected the stream crossing location in an area the stream is narrow and straight with few meanders and absent of wetlands. The applicant designed the road crossing to utilize approximate 8-foot head/end walls thus reducing the permanent net loss impact to the stream. The applicant has pushed the overall development, including the entrance from Harvey Road to north of the site as much as possible to reduce the net loss to wetlands from grading fill. Proposed water and sewer lines will be buried above the road crossing, thus avoiding temporary impact to the stream from installation of water and sewer utilities. The remaining 0.323 acres of wetlands and 1,493 linear feet of stream channel are being avoided. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The clearing limits will be staked and silt fencing and silt fencing outlets will be used. A temporary coffer dam will be installed. During construction, water will be bypassed around the construction footprint. Appropriate stream bank protection will be provided in the channel during construction and all excess excavated material will be immediately removed from the crossing area and stockpiled in upland locations. Upon completion of the culvert installation, the temporary sand bag cofferdams will be removed and flow will be diverted through the culvert. Following installation of the culvert, areas of temporary stream impact will be restored to similar pre -construction grades. The stream banks will be matted with biodegradable materials and seeded/live staked with native species. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this ElPayment to in -lieu fee program project? ❑ Permittee Responsible Mitigation Page 7 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: The applicant does not propose mitigation for loss of streams and wetlands. 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 13 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: Jamestown 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 25.3 % 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Stormwater management plan approval from local delgated municipality will be obtained prior to impacts occuring. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Jamestown ❑ Phase II ® NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ® Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 13 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter.) Comments: A NEPA or SEPA is not required as part of this project. 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. We are not aware of additional development that will result which will impact nearby downstream water quality. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Impacts from wastewater generation are not proposed. Page 10 of 13 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The IPaC report for the site identifies the following federally protected endangered or threatened species: Schweinitz's sunflower (E) and small whorled pogonia (T) as protected species that could be proximate to the project area. The project area contains a mature hardwood forest estimated to be at least 40 years in age. Mid and understory vegetation is densely vegetated. Suitable habitat for Schweinitz's sunflower or small whorled pogonia are not located within the proposed project area. Therefore, we have made a determination of no effect for these species. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Based on our knowledge of the site, the site is not located in or near an area designated as essential fish habitat. Best management practices and the construction of stormwater ponds will prevent sediment from entering down -gradient waterbodies which may contain fish. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? We reviewed the SHPO Map (http://gis.ncdcr.gov/hpoweb/) to identify cultural resources of the site. The map does not identify listed or eligible for listing properties on or nearby the project area. A copy of the map is included as an attachment. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA NHFL (Drawing 4, attached) Digitally signed by Bradley Luckey DN: cn=Bradley Luckey, o=Pilot Bradley Enviromental, Inc., ou, B Bradley S. Luckey, PWS email=bluckey@pilotenviro.com, Luckey c=us 8.20.23 Date:2023.08.20 14:55:01-04'00' Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 12 of 13 PCN Form — Version 1.3 December 10, 2008 Version Environmental Services Proposal Pilot Proposal 7653.1 August 3, 2023 AGENT AUTHORIZATION This form authorizes Pilot to act as our agent in stream/wetland matters including U.S. Army Corps of Engineers and North Carolina Division of Water Resources field verification and permitting. Property Address: 4718 Harvey Road, Jamestown NC Applicant Information: Address: Telephone Number: Fax Number: E-mail Address: Land Acquisition & Development Services, LLC > David Michaels, Company Agent PO Box 9147, Greensboro NC 27429 336-207-8003 N/A dmichaels@windsorcompanies.us Signature:oa��aV4& Mr�G�aG Date: 8/7/23 4 a 1J f � 1 Q _ k.• p � f rt� _ W � 0 o o 0 o w a m p d p Z U x c m C in a a� z O y U O i co � j 7 O i6 A N W W O M1 CX c7 0 w ❑ U tm d � U CL Q CmA Q G i Q Z a 0 N f` O W m W CO coM1 V] _ x fn M N Z� U O W N Y w fp N CO a W J O Q �-% 0 h M1 O y d D d h = N M1 J G J C7 Z N O N C ® o N w ° m 3 v d cn a N In lJ CIn y � � • • � z co z °° v m °x° L a c s cn = it CL m u v °3 m y ® Q r� a 3 m ro ro ro o t J v ct c% o a¢ J❑ 6 a 00 H0 Z(9) ■ CL F --- I z u CL ED u ED U LL- -J D IMPACT S- 9 CROSS SECTION FOR OAKDALE FOREST LANE 0+00 1+00 760.00 750.00 740.00 2+00 W m LJ z J p � M W ~ o m m Lo 10 U N Z � II � Of M 0 p 3 Z LCL VIL p w w a- L SS � W z 7c:�A.S.�P. WIN WA L WIN GW LL 103 L. EX. @ 88°8° STREAM BED SUPPLEMENT EX. STONE IN BED w/ FLUSH —RIP—RAP PAD L=30' W=20' D=24" CL 1 STONE STA 10+36 RIPRAP INSTALLED FLUSH WITH GRADE 40' 30' 20' 10' 0 40' 80' 4' 3' 2' 1' 0 4' 8' HORZ. SCALE: 1 "=40' VERT. SCALE: 1 "=4' PIPE INSTALLATION CONSTRUCTION SEQUENCE: 1. INSTALL RIPRAP CHECK DAM WITH WASHED No. 57 STONE FACE. 2. INSTALL RIPRAP ENERGY DISSIPATER BELOW CHECK DAM. 3. INSTALL IMPERIOUS DIKE ON UPSTREAM END OF IMPACT. 4. INSTALL TEMPORARY BYPASS PUMP, DISCHARGE LINE, AND SUCTION LINE. ENSURE PUMP AND LINES ARE PROPERLY ANCHORED/SECURED. 5. INSTALL PIPE FROM DOWNSTREAM END PROCEEDING UPSTREAM. 6. REMOVE IMPERVIOUS DIKE AND INSTALL UPSTREAM ENDWALL. DIVERSION BERMS TO SEDIMENT BASINS PUMP �OF � RIPRAP CHECK DAM W/ WASHED #57 STONE FACE PIPE INSTALLATION I DETAIL IMPERVIOUS DIKE SILT FENCE W/ STONE OUTLETS IMPACT QUANTITIES WETLAND IMPACT:0.028 AC (1,210 SF) N IMPACT W-1 FOR OAKDALE FOREST DEVELOPED BY LAND ACQUISITION AND DEVELOPMENT SERVICES, LLC TOWN OF JAMESTOWN GUILFORD COUNTY, NORTH CAROLINA JULY 2023 JOB No. 22-13 40' 30' 20' 10' 0 40' 80' SCALE: 1 "=40' 806.4 2 r' k SILfi-FENCE W/ --&T0`Nt OUTLE-S-(TYP.) W.W.WoyWy�y 4WWW�1 � �MITS Off W W W W W W W W W DISTURBANCE PROP y GRAD IIN� 7L 806.4 f.. Abpt h r *` 4t A i .,•- a.5 .. t __ _.y � .- �. ��. - •l �. Lei '1 tro s . r,:.y .� ,ik �` lam: .� '�`�' � f• �,��. �-a Scott Edwards From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Wednesday, March 23, 2022 9:37 AM To: Scott Edwards Cc: Homewood, Sue Subject: Delineation Confirmation RE: SAW-2022-00649 (4718 Harvey Road / Jamestown NC / Guilford County) Attachments: Pages from 20220317 PJD Request and Acknowledgment.pdf Hi Scott. I reviewed the information you sent for the above referenced project. Based on your submittal and available remotely sensed information I will proceed with an office verification of the delineation of potential waters of the US. No field verification from the Corps is necessary. I will use the map titled "Drawing 5" (attached) from your PJD request when processing the PJD and/or permit application/request for this site. Please let me know if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Office: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Thursday, March 17, 2022 1:17 PM To: Scott Edwards <sedwards@pilotenviro.com> Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Subject: SAW-2022-00649 (4718 Harvey Road / Jamestown NC / Guilford County) Good Afternoon, Your JD request has been received, assigned action ID SAW-2022-00649 and forwarded to Dave Bailey for further processing. Please refer to the action ID in all correspondence. United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 856-4520 Fax: (919) 856-4556 In Reply Refer To: Project Code: 2023-0119197 Project Name: Oakdale Forest August 20, 2023 Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). If your project area contains suitable habitat for any of the federally -listed species on this species list, the proposed action has the potential to adversely affect those species. If suitable habitat is present, surveys should be conducted to determine the species' presence or absence within the project area. The use of this species list and/or North Carolina Natural Heritage program data should not be substituted for actual field surveys. New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered 08/20/2023 species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: https://www.fws. gov/sites/defaultlfiles/documents/endangered-species-consultation- handbook.pdf Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts, see https://www.fws.gov/program/migratory-bird-permit/what- we-do. The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more information on avian stressors and recommended conservation measures, see https://www.fws.gov/library/collections/threats-birds. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/partner/council-conservation- migratory-birds. 08/20/2023 3 We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): • Official Species List • Migratory Birds OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 08/20/2023 4 PROJECT SUMMARY Project Code: 2023-0119197 Project Name: Oakdale Forest Project Type: Residential Construction Project Description: Residential Project Location: The approximate location of the project can be viewed in Google Maps: https: www. google.com/maps/(a)35.986818150000005,-79.92189481942404,14z aM s�f[AaAf Counties: Guilford County, North Carolina 08/20/2023 5 ENDANGERED SPECIES ACT SPECIES There is a total of 4 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheriesi, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. MAMMALS NAME Tricolored Bat Perimyotis subflavus No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/10515 INSECTS NAME Monarch Butterfly Danaus plexippus No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/9743 FLOWERING PLANTS NAME Schweinitz's Sunflower Helianthus schweinitzii No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/3849 Small Whorled Pogonia Isotria medeoloides Population: No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/1890 STATUS Proposed Endangered STATUS Candidate STATUS Endangered Threatened 08/20/2023 6 CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HAVE EFFECTS ON ALL ABOVE LISTED SPECIES. MIGRATORY BIRDS Certain birds are protected under the Migratory Bird Treaty Act! and the Bald and Golden Eagle Protection Actz. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The Migratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. BREEDING NAME SEASON Bald Eagle Haliaeetus leucocephalus Breeds Sep 1 to This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention Jul 31 because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. 08/20/2023 NAME BREEDING SEASON Chimney Swift Chaetura pelagica Breeds Mar 15 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA t0 Aug 25 and Alaska. Kentucky Warbler Oporornis formosus Breeds Apr 20 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA t0 Aug 20 and Alaska. Prairie Warbler Dendroica discolor Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Jul 31 and Alaska. Prothonotary Warbler Protonotaria citrea Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA t0 Sep 10 and Alaska. Rusty Blackbird Euphagus carolinus Breeds This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions elsewhere (BCRs) in the continental USA Wood Thrush Hylocichla mustelina Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee 08/20/2023 was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (1) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. — probability of presence breeding season I survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Ea Non-BCCe i;i; T;;i;4;;M *110 EP 1+1+ ++1 1iii �i=i iiii ii;I Vulnerable --- -- ---- ---�--- ---- - - - - - - - - - - - - - - - i Chimney Swift + BCC Rangewide I I I I I I 7 I I mn no no NO iiii on imis ++++ ++++ (CON) Kentucky Warbler I 11 I I I I 1 1 BCC Rangewide ++++ ++++ ++++ + I I I I I I I - ++++ ++ + ++++ ++++ ++++ ++++ (CON) ■■■■ �d�■ �� Prairie Warbler ++++ ++++ ++++ TTTT I I I I I I I I I I I 1 1-+++ ++++ ++++ ++++ ++++ 08/20/2023 9 BCC Rangewide (CON) I 11 I I I I I I II I 1 1 Prothonotary Warbler ++++ ++++ ++++ + I I * I r+, ++++ ++++ ++++ BCC Rangewide (CON) Red-headed Woodpecker 01+* 0000 IM 401*00 +1+0 ++IN 11101+01 mill 000101+1 BCC Rangewide (CON) Rusty Blackbird BCC -BCR +T0+ ++++ T+++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ +0+0 ++++ Wood Thrush BCC Rangewide ++++ ++++ +++ 00 loom 00 ++1+ +++0 +0" 00++ ++++ ++++ (CON) Additional information can be found using the following links: • Birds of Conservation Concern https://www.fws.gov/program/migratory-birds/species • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library collections/avoidinp--and-minimizinp--incidental-take-mip-ratorv-birds • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.pdf MIGRATORY BIRDS FAQ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the list of migratory birds that potentially occur in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCQ and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding_, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act 08/20/2023 10 requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey, banding, and citizen science datasets. Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering or migrating in my area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year-round), you may query your location using the RAIL Tool and look at the range maps provided for birds in your area at the bottom of the profiles provided for each bird in your results. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects 08/20/2023 11 For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Loring. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. 08/20/2023 12 IPAC USER CONTACT INFORMATION Agency: Private Entity Name: Bradley Luckey Address: 743 Park Lawn Court City: Kernersville State: NC Zip: 27285 Email bluckey@pilotenviro.com Phone: 3367084997 LEAD AGENCY CONTACT INFORMATION Lead Agency: Army Corps of Engineers ❑yy n N u x X X 3 m X 5 12 ❑ Pq L�J allo Q N M b N W 57 M0 tv. of r� I Pi aL4 Drawing 2 USDA Web Soil Survey , i of Guilford County, NC PILOT - Scale: 1" = 500' p I L 0 7E N V I R 0 N M E N 7 A L. I N C Web Soil Map Harvey Road Approximate 31-Acre Tract Jamestown, Guilford County, NC Pilot Project 7653 E: s VVkC ' IF W k LEGEND Site Boundary N%W4K Drawing 2A Published Soil Map USDA Soil Survey �� 4 Harvey Road of Guilford County, NC4,, �' Approximate 31-Acre Tract Published 1977, Sheet 38��o®�®� Jamestown, Guilford County, NC Scale: 1"=500' PILOT ENVIR0NMENTAL.INC Pilot Project7653 LEGEND Site Boundary s Freshwater Emergent Freshwater Forested/Shn Estuarine and Marine Dee Estuarine and Marine Freshwater Pond Lake Riverine Other Drawing3� y �� NWI Map USFWS NWI -` g k 'f Harvey Road Approximate 31-Acre Tract Wetlands Mapper pII ®1• Jamestown Guilford County, NC Scale: 1"=500' P L07 ENVIR0NMENTAL.INC Pilot Project7653 .730.9 "3D -g 01 N LEGEND Site Boundary �1 %Annual Chance Flood Hazard Regulatory Floodvay Sped al Floodmay Area of Undetermined Flood Hazard 0.2%Annual Chance Flood Hazard Future Conditions 1%Annual Chance Flood Hazard Area with Reduced Risk Due to Levee Drawing 4 FEMA FIRM Harvey Road National Flood Hazard Layer Approximate 31-Acre Tract From FEMA Web Map Service I' O7. Jamestown, Guilford County, NC Scale: 1" = 800' PILOT ENYIRONMENTAL.INL pfPilot Project7653 SB (903 LF) WA SA (734LF) WD 1-4 (0.20 (0.006 ac) WC 1-4 - (0.005 ac) _ WB 1-16 (0.14 ac) THE LOCATIONS OF FEATURES SHOWN ON THIS MAP HAVE BEEN CONFRIMED BY MI.. �....� ...__. WITH THE USACE IN EMAIL DATED 3.24.22. THIS EXHIBIT INCLUDES GPS LOCATIONS OF DELINEATED FEATURES. DELINEATION CONDUCTED BY PILOT PERSONNEL ON 02.11.22. LEGEND Site Boundary Perennial Stream Intermittent Stream Wetland SA 1-5 Flag Number/Feature ID DP-10 Data Point Drawing 5"�' r . Wetland Map 2019 Satellite Imagery from ESRI Harvey Road and Pilot GPS Data Approximate 31-Acre Tract Scale: 1" = 300' PILOT Jamestown, Guilford County, NC Date: 02.22.22, Revised 04.01.2022 P' L 0 7 E ""' R 0 " M E "'" " ` Pilot Project 7653 Brad Luckey From: Heather LaGamba Sent: Tuesday, August 1, 2023 12:41 PM To: 401 PreFile@ncdenr.gov Subject: Pre -File Notice - Oakdale Forest - Harvey Rd (7653.1) We would like to submit a Pre -filing Notice for the following project: Project Name: Oakdale Forest - Harvey Rd (7653.1) Project Owner: Land Acquisition and Development Services, LLC Project Owner's Address: PO Box 9147, Greensboro, North Carolina 27429 Project County: Guilford Type of project/Approval Sought: 401 WQC, Pre -Application Request Meeting Declined Thank you and have a wonderful day! Sincerely, Heather LaGamba 336.345.9536 (c) 336.310.4527 (o) P.O. Box 128 Kernersville, NC 27285 www.lilotenviro.com hiagamba@pilotenviro.com