Loading...
HomeMy WebLinkAbout20231255 Ver 1_MI_BoulderRidge_PCN_091223_20230912oaoF wnrfiRpG � r ! 1 _, > o Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information i. Processing la. Type(s) of approval sought from the Corps: x❑ Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes 0 No 1 d. Type(s) of approval sought from the DWQ (check all that apply): x❑ 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes 0 No For the record only for Corps Permit: ❑ Yes 0 No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 0 Yes ❑ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes 0 No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes 0 No 2. Project Information 2a. Name of project: Boulder Ridge Single Family Development 2b. County: Gaston 2c. Nearest municipality 1 town: Gastonia 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: (1) HWY 321 - STAGECOACH ROAD LLC (2) STAGECOACH ROAD LLC 3b. Deed Book and Page No. (1) 4104,1817 (2) 4285, 0570 3c. Responsible Party (for LLC if applicable): CIO SOUTHEAST LAND MGT LLC 3d. Street address: SELWYN AVE STE 500 3e. City, state, zip: CHARLOTTE, NC 28209-1791 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form —Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: prospective developer 4b. Name: Jeremy Horton, PE 4c. Business name (if applicable): M/1 Homes of Charlotte, LLC 4d. Street address: 5350 77 Center Drive, Suite 100 4e. City, state, zip: Charlotte, NC 28217 4f. Telephone no.: (704) 597-4535 4g. Fax no.: 4h. Email address: jhorton@mihomes.com 5. Agent/Consultant Information (if applicable) 5a. Name: (Consultant): Tamp Bandy 5b. Business name (if applicable): Wetlands & Waters, Inc. 5c. Street address: 4108 LB Propst Drive 5d. City, state, zip: Conover, NC 28613 5e. Telephone no.: 828-302-3437 5f. Fax no.: n/a 5g. Email address: jtampbandy@wetlands-waters.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 3533779760, 3533789387, 3533795446 1 b. Site coordinates (in decimal degrees): Latitude: 35.2089 Longitude. 81.2252 1 c. Property size: 267 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Blackwood Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Catawba (03050101) 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site currently undeveloped 1 woody. Adjacent lands are undeveloped, residential and commercial 3b. List the total estimated acreage of all existing wetlands on the property: 9 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 8995 3d. Explain the purpose of the proposed project: Development for single family residential homes including lots and infrastructure (roads and utilities) 3e. Impacts Describe the overall project in detail, including the type of equipment to be used: to aquatic resources include stream and wetland crossings for roads and utilities. Typical grading and construction equipment used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property 1 ro'ect (includingall rior phases)in the past? 0 Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what typeUX of determination was made? Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Perry Isner Agency/Consultant Company: Wetlands & Waters, Inc Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 05/20/2022 (SAW-2022-01115 attached) 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No x❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes x❑ No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): FX� Wetlands ❑X Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill / Rip -Rap Headwater Wetland (Wetland 1400) No Corps 0.073 W2 P Fill / Rip -Rap Headwater Wetland (Wetland 1300) No Corps 0.069 W3 T Land Clearing Headwater Wetland (Wetland 1400) Yes. Corps 0.013 W4 T Land Clearing Headwater Wetland (Wetland 1300) 'No Corps 0.013 W5 P Sewer Utility Easement Headwater Wetland (Wetland 1400) No Corps 0.097 W6 P Sewer Utility Easement Headwater Wetland (Wetland 1400) Yes Corps 0.062 2g. Total Wetland Impacts: 0.327 2h. Comments: 0.0142 acre Total Wetland Loss from Fill (proposed compensatory mitigation) 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert Tributary 1-A INT Corps 3 126 S2 P Stabilization Tributary 1-A INT Corps 3 17 S3 T construction Tributary 1-A INT Corps 3 12 S4 P Culvert Tributary 1 PER Corps 6 55 S5 P Stabilization Tributary 1 PER Corps 6 18 S6 T construction Tributary 1 PER Corps 6 5 S7 T Sewer installation Tributary 1 INT Corps 4.5 24 S8 T Sewer installation Tributary 1 PER Corps 9 46 3h. Total stream and tributary impacts 303 3i. Comments: Total stream loss from culvert: 0.16 ac Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require miti ation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number— Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Road crossings and sewer utility locations dictated by topographic and shallow rock. Multiple iterations and coordination related to site grading, road crossing locations, and Iot/BMP configurations have been completed to reduce and minimize impacts to aquatic resources 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Road crossing realignments and utilization of retaining walls 1 embedded rip -rap for energy dissipation to allow for tributary flow continuity 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? X❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ X❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet ° 4e. Riparian wetland mitigation requested: 0.14 acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form -- Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? 0 Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? = Gaston County 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Gaston County 3b. Which of the following locally -implemented stormwater management programs apply (check all that apply): ❑x Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑x No 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs apply (check all that apply): ❑Coastal counties ❑HQW ❑ORW ❑Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No S. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federallstatellocal) funds or the ❑ Yes 91 No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPAISEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes x❑ No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes 91 No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes xC7 No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. single and complete project. No future phases anticipated 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Tie to existing sanitary sewer utilities Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes x❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑x No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? On -site protected species survey prepared by W&W 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes x❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑x No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NO SHPO Web 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes x❑ No 8b. If yes, explain how project meets FEMA requirements: Portions of sanitary sewer will be located in FEMA iloodplain. 8c. What source(s) did you use to make the Floodplain determination? GIS mapping 3ve�r�� Applicant/Agent's Printed Name Date P6,1pIEarT/ gent's Si 6 na ure (Agents signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 Requestor: Address: Telephone Number: E-mail: Size (acres) Nearest Waterway USGS HUC U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2022-01115 County: Gaston U.S.G.S. Quad: NC -Gastonia South NOTIFICATION OF JURISDICTIONAL DETERMINATION MA Homes of Charlotte, LLC Cody Simo neaux 5350 77 Center Drive Charlotte, NC 28217 704-579-4538 c si m o ne aux (a .mihomes.c om 266 Crowders Creek 03050101 Nearest Town Gastonia RiverBasin Santee Coordinates Latitude:35.209990 Longitude:-81.216910 Location description: Project encompasses several parcels West of York Highway, and south of the confluence of Crowders Creek and Blackwood Creek. near Gastonia, Gaston County, North Carolina. PIN(s):3543075624.3533779760, 3533789387, and 3533795446 Indicate Which of the Following Apply: A. Preliminary Determination ® There appearto be waters onthe above described project area/property, thatmay be subjectto Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 ofthe Rivers and Harbors Act (RHA) (33 USC § 403). The waters have been delineated, and the delineation has beenverifiedby the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation mapdated 3/11/2022. Therefore this preliminary jurisdiction determination maybe used in the permit evaluation process, including determining compensatory mitigation. For purposes of computationof impacts, compensatory mitigationrequirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat allwaters and wetlands thatwould be affected in anyway by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, youmay requestan approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters on the above described project area/property, thatmay be subjectto Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 ofthe Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of C WA/RHA jurisdiction over allof the waters at the project area, which is not sufficiently accurate andreliable to support anenforceable permit decision. We recommend that you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultantto conduct a delineation thatcan be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters ofthe United States within the above describedproject area/property subjectto the permit requirements of Section 10 of the Rivers andHarbors Act (RHA) (33 USC § 403) and Section 404 ofthe Clean WaterAct (CWA)(33USC§ 1344). Unless there is a change in law or our published regulations, this determination maybe relied upon for a period not to exceed five years from the date of this notification. ❑ There are waterson the above described project area/property subjectto the permit requirements of Section 404 ofthe Clean WaterAct(CWA)(33USC§ 1344). Unless there is a change in the law or our published regulations, this determination maybe relied upon fora period notto exceed five years from the date ofthis notification. ❑ We recommend you have the waters on your project area/property delineated. As the Corps may notbe able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation thatcan be verified by the Corps. ❑ The waters on yourproject area/property have been delineated and the delineation has beenverifiedby the Corps. The approximate boundaries of these waters are shown onthe enclosed delineationmapdatedDATE. We strongly suggest youhave SAW-2022-01115 this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWAjurisdiction on your property which, provided there is no change in the law or our published regulations, maybe relied upon for a periodnotto exceed five years. ❑ The waters have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determinationmay be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, pre sent on the above described project area/property which are subject to the permit requirements of Section404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination maybe relied upon for a period notto exceed five years from the date of this notification. ❑ The property is located in one ofthe 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of CoastalMa nagement in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill materialwithin waters of the US, in cludin g wetlands, without a Department ofthe Army permit may constitute a violation of Section301 of the Clean WaterAct (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters ofthe United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or403). If you have any questions rega rdin g this determination and/or the Corps regulatory program, please contact Krystynka B Stygar at 252-545-0507 or krystynka.b.stygar&sace.army.mil. C. Basis For Determination: Based on information submitted by the applicant and available to the U.S. Army Corps of Engineers, the proiect area exhibits criteria for waters of the U.S. as defined in 33 CFR 328, Regulatory Guidance Letter 05-05, the 1987 Wetland Delineation Manual, and/or the Regional Supplement to the 1987 Manual: Eastern Piedmont and Mountains v2.0.: See the preliminary jurisdictional determination form dated 05/20/2022. D. Remarks: See approximate jurisdictional features on map, "Stagecoach- MIIHomes 0311112022" E. Attention USDA Program Participants This delineation/determinationhas been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may notbe valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) If you object to this determination, you may request an administrativeappeal under Corps regulations at33CFRPart 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. Ifyourequest to appealthis determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth StreetSW,FloorM9 Atlanta, Georgia 3 0303-8803 AND PH I L I P.A. SHANNIN&USACE.ARMY.MIL In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, thatit meets the criteria for appeal under 33 CFR part 331.5, andthat it has been received by the Division Office within 60 days ofthe date ofthe NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. * * It is not necessary to submit anRFAform to the ivision Office if you do notobject to the determination in this correspondence.** Corps Regulatory Official: Date of JD: 05/20/2022 Expiration Date of JD: Not applicable SAW-2022-01115 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: Wetlands and Waters, Inc Perry Isner Address: 328 East Broad Street, Suite D Statesville, NC 28677 Telephone Number: 704-773-4239 E-mail: perryisner jetlands-waters.com Property Owner: Southeast Land Management LLC ScottCoblentz Address: 2820 Selwyn Ave, Ste 500 Charlotte, NC 28209 Telephone Number: 704-334-3212 E-mail: scoblentzksouthstreetpartners.com NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: M/I Homes of Charlotte,LLC, Cody File Number:SAW-2022-01115 Date:05/20/2022 Simo neaux Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMITDENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E TION I - The following identifies yourrights and options regarding an administrative appealof the above decision. r itionalinformation may be found at orhttp://www.usace.army.miUMissions/CivilWorks/RegulatoryPro aamandPermits.aspx e Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and yourwork is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appealthe permit, including its terms and conditions, and approved jurisdictionaldeterminations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit yourright to appealthe permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a)modify the permit to address allof your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appealthe permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and yourwork is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appealthe permit, including its terms and conditions, and approved jurisdictionaldeterminations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appealthe declined permit underthe Corps of Engineers Administrative AppealProcess by completing Section II of this form and sendingthe form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appealthe denial of a permit underthe Corps of Engineers Administrative AppealProcess by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may acceptor appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appealthe approved JD. • APPEAL: If you disagree with the approved JD, you may appealthe approved JD under the Corps of Engineers Administrative AppealProcess by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which maybe appealed), by contactingthe Corps district for further instruction. Also you may provide newinformation for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FORAPPEAL OROBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appealis limited to a review of the administrative record, the Corps memorandum forthe record of the appealconference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant northe Corps may add new information or analyses to the record. However, you may provide additionalinformation to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/orthe If you only have questions regarding the appealprocess you may appealprocess you may contact: also contact: District Engineer, Wilmington Regulatory Division MR. PHILIP A. SHANNIN Attn: Krystynka B Stygar ADMINISTRATIVE APPEAL REVIEW OFFICER Charlotte Regulatory Office CESAD-PDS-O U.S Army Corps of Engineers 60 FORSYTH STREET SOUTHWEST, FLOOR M9 8430 University Executive Park Drive, Suite 615 ATLANTA, GEORGIA 30303-8803 Cha rlottc, No rth Carolina 28262 PHONE: (404) 562-5136; FAX(404) 562-5138 EMAIL: PHILIP.A.SHANNINna,USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appealprocess. You will be provided a 15-day notice of any site investigation, and will have the opportunity to participate m all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Krystynka B Stygar, 8430University Executive park Drive, Suite 615, Charlotte, North Carolina 28262 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CE SAD-PDO, 60 Forsyth Street, Room 10M15, Atla nta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 05/20/2022 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: M/I Homes of Charlotte, LLC, Cody Simoneaux, 5350 77 Center Drive, Charlotte, NC 28217 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Stagecoach Road, SAW- 2022-01115 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Project encompasses several parcels West of York Highway, and south of the confluence of Crowders Creek and Blackwood Creek, near Gastonia, Gaston County, North Carolina. PIN(s):3543075624, 3533779760, 3533789387, and 3533795446 (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Gaston City: Gastonia Center coordinates of site (lat/long in degree decimalformat): Latitude: 35.209990 Longitude: -81.216910 Universal Transverse Mercator: Name of nearestwaterbody: Crowders Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ® Office (Desk) Determination. Date: May 20, 2022 ® Field Determination. Date(s): march 7, 2022 TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION Site Number Latitude Longitude Estimated Type of aquatic Geographic authority to (decimal (decimal amountof resources (i.e., which the aquatic degrees) degrees) aquatic wetland vs. resource "may be" resources in non -wetland subject (i.e., Section404 reviewarea waters) or Section 10/404) (acreage and linear feet, if applicable Wetland 1000 35.207674 -81.209620 0.55 acres Wetland Section 404 Wetland 1100 35.207787 -81.212461 0.01 acres Wetland Section 404 Wetland 1200 35.207686 -81.212544 0.1 acres Wetland Section 404 Wetland 1300 35.2100130 -81.213302 0.73 acres Wetland Section 404 Wetland 1400 35.212680 -81.214178 3.5 acres Wetland Section 404 Wetland 3000 35.213755 -81.219180 0.4 acres Wetland Section 404 Wetland 4000 35.123264 -81.222140 0.2 acres Wetland Section 404 Wetland 4100 35.213293 -81.222771 0.1 acres Wetland Section 404 Wetland 4200 35.207028 -81.221567 3.5 acres Wetland Section 404 Tributary 1 35.208448 -81.212975 3080 LF Non -wetland Section 404 wate rs Tributary 1-A 35.206508 -81.212250 860 LF Non -wetland Section 404 wate rs Tributary 2 35.212556 -81.212753 460 LF Non -wetland Section 404 wate rs Tributary 3 35.213273 -81.218339 315 LF Non -wetland Section 404 wate rs Tributary 35.213273 -81.219135 570 LF Non -wetland Section 404 wate rs Tributary 5 35.213885 -81.222530 1010 LF Non -wetland Section 404 wate rs Tributary 6 35.211864 -81.223544 2700 LF Non -wetland Section 404 waters 1. The Corps of Engineers believes that there may bejurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or othergeneral permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AID for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AID before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the rightto request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subjectpermit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative orjudicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AID to accomplish that result, as soon as is practicable. This PJD finds that there "maybe"waters of the U.S. and/orthat there "maybe" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affectedby the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items are included in the administrative record and are appropriately cited: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: Wetlands and Waters for MA Homes of Charlotte, Delineation Man ® Data sheets prepared/submitted by or on behalf of the PJD requestor. Datasheets: ® Office concurs with data sheets/delineation report. ❑ Office doesnotconcurwith data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: El Corps navigable waters' study: El U.S. Geological Survey Hydrologic Atlas: ❑USGS NHD data: ❑ USGS 8 and 12 digit HUC maps: ® U.S. Geological Survey map(s). Cite scale & quad name: Figure 3, 03/11/2022 ® Natural Resources Conservation Service Soil Survey. Citation: Figure 4.03/11/2022 ®Nationalwetlands inventory map(s). Cite name: Figure 5, 03/11/2022 ❑ State/local wetland inventory map(s): ®FEMA/FIRM maps: Figure 6, 03/11/2022 ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ®Photographs: ® Aerial (Name & Date): Gaston CountyGIS,VicinityMap, 03/11/2022 or ® Other (Name & Date): Field Photos 03/07/2022 ❑ Previous detennination(s). File no. and date of response letter: ❑Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corns and should not be relied upon for later jurisdictional determinations. Signature and date of Regulatory staff member completing PJD 05/20/2022 Signature and date of person requesting PJD (REQUIRED, unless obtainingthe signature is impracticable)' 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respondwithin the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action_ PERENNIAL SII STREAM D 11\ i APPROX. 1360 LF WETLAND A \0 �! APPROX. 0.38 AC (161733 SF) 1 PERENNIAL �� �S�, STREAM C \>� \1' APPROX. 315 tLFFj ti 111 y PA WETLAND F « I&4 ;} APPROX. 0.87 AC (37,981 SF) i• i / PhUtz' < <-� � �,` PROPERTY DATA FOR BOULDER RIDGE TAX PARCEL ID: 3533779760, 3533789387, 3533795446,3543075624 SITE AREAS TOTAL SITE AREA: 267.45 AC. IMPERVIOUS AREA: 72.88 AC. % IMPERVIOUS: 27.25% kllitl SCALE 1"=500' 0 250' 500. Q o ° o o 1 o 1 ° PERENNIALCT,,� \ o ,� o ° d STREAM D-1% " ` J APPROX. 226 LF°/cb ° ° o PERENNIALSTREAM D-21 fio ck, �` r APPROX. 373 LF A _- � 11 It }yeF� ,Il\\\ PROPERTY , i ,BOUNDARY / PERENNIAL STREAM B APPROX. 460 LF 9t �� WETLAND B APPROX. 3.89 AC (169,428 SF) Ir PERENNIAL STREAM A APPROX. 3,080 LF K1�1)1rf rwOR WETLAND Ci1(��}I)111y(! APPROX. 0.87 AC �• (37,981 SF) 1 ��( WETLAND D APPROX. 0.11 AC (4,749 SF)\ IT �> Noll WETLAND E APPROX. 0.54 AC. (23,694 SF) �> _ PERENNIAL STREAM A-1 \ APPROX. 860 LF \'�=rt� ;,�'I�fzt�•. �\ �-A _ � ri gllit�rl �� \1\1 li l\ v%�' r:�� I f S�/ /I ((I Ii I ? , PROPERTY \� ///f �//�1J1'y� k ,, BOUNDARY � 11 o . • •': ••. 00RV15 oN ACHIE E�THR°°�H °°� T I M M O N S GROUP BOULDER RIDGE x' °ATE REVISION DESCRIPTION ' m m�� ti CITY OF GASTONIA, NORTH CAROLINA STREAM CROSSING - EXISTING CONDITIONS g z z w These plans and associated documents are the exdusive property of T IMMONS GROU P and may not be reproduced in whole ,, in part and shall not be used f,,,,v p,mose whatsoever. inclusive. but not ] to c Nstmct- bidding, and/or ... stmction staking without the express S,tten consent U TIMMON S GROUP. .\ o ° ° o 1 _ %o ,f o o 4— PERENNIAL SEE SHEET 40' EXISTING o ,` o d STREAM D-1 X-112 \ y SEWER EASEMENT o J o APPROX. 226 LF °cb ° ° PERENNIAL �. `` -A ° ° ° o �� ° I` STREAM D-2 ° 12° �r r APPROX. 373 LF o • ,� � 1 IS\ l�l; r � 11 11 ytilr� i i l Ix \ PROPERTY I PERENNIAL \ _ ���r/�� ! BOUNDARY St�I STREAM D \ �/ ' 1 IN PERENNIAL / i APPROX. 1360 U- aa STREAM B �`-f/g� SEE SHEET APPROX`60 LF .. WETLAND A �„ ;�� / � � ll. /! APPROX. 0.38 AC I �! X-110 Z WETLAND B (16,733 SF) APPROX. 3.89 AC ( ) �\ PERENNIAL STREAM C APPROX. 315 LF i „ter f4 SEE SHEET rr 11) X-108 l 11 I 9(1"/fl/ yir" tl ti f 11 11 l\,rt \ o SEE SHEET J. /r� f• ti ��\ =A X-104 f PERENNIAL J �9II ^'/a 1uu STREAM A II 11 APPROX. 3,080 LF • X \ 1 �� ( 1� 1/ i � f,�. •f „ �r ! '% s .���® °� •1 `� ' � ' n rrp 1,1 I(/ i „ L �� � � WETLAND C �; APPROX. 0.87 AC "'a ( .' SEE SHEET (37,981 SF) X-106 t��. , ft � \ �� ,� Ll pl �, � z•���� rr•l�tll y��l�lf �� " C e WETLAND FAIti APPROX. 0.87 AC (37,981 SF) WETLAND D APPROX. 0.11 AC k(r \ _4 (4,749 SF)\ PROPERTY DATA FOR BOULDER RIDGE 1 TAX PARCEL ID: 3533779760, 3533789387, 3533795446, 3543075624 SITE AREAS .�r s f�' elf I APPROX. 0.54 AC TOTAL SITE AREA: 267.45 AC. / v (23,694 SF) IMPERVIOUS AREA: 16.74 AC.=I % IMPERVIOUS: 6.26% PERENNIAL :� IegJl JIJ/�/ P/ 1 tr/,f.yi ii 1 i�� J lJrr�/ r'�T 1�` STREAM A-1 �( rr r ) \Lt� �APPROX. 860 LF X-102II Malk SCALE I"=500' PROPERTY BOUNDARY 0 250' 500' m ' �M♦ n \ � V e -dam `` ti` � V ` T I M M O N S GROUP o THIS oR��N,�� PREPARE. -71n • •• YOUR VISION AMA.F Eo THROUGH OURS. head so- e1, STeEiso'I charlotte, NC xszai � oo F� oa sze.ime w,uw.omma�ssom mrcn ce�olme u�eyse rvo. caesz xN o BOULDER RIDGE DATE REVISION DESCRIPTION m ti ° O z o CITY OF GASTONIA, NORTH CAROLINA o n o A z STREAM CROSSING - OVERALL SITE PLAN g z z w These plans a nd associated documents are the e ,sive property of TIMMON SOROU Pandmaynotbereproducedinwhole,rinpartandshallnotbeusedf,ra,vD,mosewhatsoever. i nclusive. but not to constmction, bidding, and/or constL,di stakingwithouttheexpress written consent of TIMMONS GROUP. SEE SHEET •o 0 • ---^ WETLAND A o APPROX. 0.38 AC 0 (16,733 SF) o 40' EXISTIXG 0 rSEWER EASEN�NTo / o 000000 \'o °b o °o�° ° o 0 0 0 PERENNIAL VSTREAM C APPROX. 315 LF PROPOSED WETPOND ROCK SEE SHEET OUTCROP X-108 0 WETLAND F APPROX. 0.87 AC o \ (37,981 SF) 0 0 PROPOSED 0 WETPOND o 800 PROPERTY DATA FOR BOULDER RIDGE TAX PARCEL ID: 3533779760, 3533789387, 3533795446,3543075624 SITE AREAS TOTAL SITE AREA: 267.45 AC. IMPERVIOUS AREA: 16.74 AC. % IMPERVIOUS: 6.26% SCALE 1"=500' mm 0 250' 500. Q SEE SHEET X-104 SEE SHEET X-110 ' M ly PERENNIAL I 0 STREAM D-1 APPRC 226 LF PERENNIAL STREAM D-2 i APPROX. 373 LF ■� t 1 t t i t t it 1 PROPERTY BOUNDARY PERENNIAL STREAM B i APPROX. 460 LF PROPOSED SAND FILTER / WETLAND B APPROX. 3.89 AC SF) (169,428 J. PERENNIAL Jq JSTREAM AAPPROX. 3,080 LF AL—r _& L ` WETLAND C ., WETLAND D/4- APPROX. to r PROPOSEDWET OND SEE HEET� X-106 �1 M WETLAND E I r APPROX. 0.54 AC / (23,694 SF) :O PERENNIAL u I1 I STREAM A-1 APPROX. 860 LF SEE SHEET X-102 t t� PROPERTY ` ,m—i BOUNDARY '— t 1 i t � I t T I M M O N S GROUP . • •': ••. 00RV15 oN ACHIE ETHR°°H °°� BOULDER RIDGE = m o 1 °ATE REVISION DESCRIPTION m�� ti CITY OF GASTONIA, NORTH CAROLINA Q� o STREAM CROSSING - OVERALL SITE PLAN g z z w These plans a nd associated documents are the Nd,siv. propertyof TIMMONS GROUP and maynot be reproduced IN whole, IN part and shall not be used foranv purpose whatsoever. I Nclusive. but not ] to construction, bidding, and/or construction staking without the express written consent of TIMMON S GROUP. LEGEND __1_ PERMANENT STREAM ;\ 1 I� } a/� J=�'�_�\C \ i� \ \ \\ \ / �' \ \=\\\\\ \ \ \\ 1 DISTURBANCE EXBANK % i )!\�/\ �/ �IIII \\ \ TEMPORARY STREAM I ISTING TOP OF DISTURBANCE Itl EXISTING STREAM CENTERLINE,% / // II/11j1 jI 1 PERMANENT WETLAND \l �\\p}, •1 \ 1 11 1 1 ' \ / �- -/ / //,%/ / j/ // DISTURBANCE 1L�� U\ I fll \ �3�' TREA 1 \ � /���— =• � / /// / l � I I ) ®TEMPORARY WETLAND \BIK R, TY DISTURBANCE fit //( EXISTING BOTTOM OF BANK STREAM BOUNDARY WETLAND BOUNDARY IMPACT #1 , STREAM nti° M I. I •.,' O \ 33 SF TOTAL OF TEMP. / I L STREAM IMPACT I ) PROPOSED RIP RAP ) UP -STREAM 17 LF (51 SF) OF PERM. I ( l HEADWALL \` `\`"\ f/\ ' I I I I , \ \ \ \ \` 11 � � STREAM IMPACT I \ CONCRETE FLUME Ivi l\\ •� �\ \ � I 1 1 I � 1 I l ` \ \ / PERENNIAL STREAM A-1 1 APPROX. 126 LF (377 SF) \ —� o / CONCRETE FLUME \ / OF PERM. IMPACT / 1 5' UTILITY DOWN -STREAM , \, / / / �% / / / / %�) 1 EASEMENT (TYP.) I 1 HEADWALL PROP. 112 LF 72" CLASS IV \ 1 RCP CULVERT \ , ... 5' SIDLK TYP. 33 SF TOTAL OF TEMP. \ EWA\ / / / / / \ II \� ?(\� �/! I1 f / ���'?�\\ \ � STREAM IMPACT \ \\ \ SCALE V=40' \\�\ o zo' ao' T I M M O N S G RO UP.0*0 .� TE1/o4 rHoa=Hx�111I.oE6ETTHE • • YOUR VISION ACHIEVED THROUGH OURS. sIcrvarlone, Nc lflxoi NartM1 cerollne License No. 1-16521mmans om x N o BOULDER RIDGE DATE °°°° DESCRIPTION ' m m�� ti ° A CITY OF GASTONIA, NORTH CAROLINA 4 N ti STREAM CROSSING - IMPACT #1 g z z w Theseplansandassociaferl rlonimenfsamthe eudiisive orooerfvofTIMM(lNSGR(IIIPand maynothe momrliicerl inwhole Orin Dartand shall not he iiserl foranv oiimose whatsoeverinclusive h, not limited Al construction, bidding, and/or construction staking without the express written consent of TIMMON S GROUP. 740 735 730 725 720 715 710 705 700 695 -0+25 740 735 730 725 720 710 705 700 695 zw — R P S D m(3RADE " T R I I IV HEAD AL L r. An715 2� 9� / IOATII RIFRAD llqV76.1 O O O O M M co N 0+00 CULVERT 0+50 1+00 2 1+50 1+75 ...,� •zs IMMONS GROUP a . easoPkEPARED ArTHE TsMea oc o-S_5sT , Nc zazaz TEL... mrcoo F oa sse.ime w,uw.ommanssom n cerolme ucense rvo. caesz x N O z ° ti o o BOULDER RIDGE CITY OF GASTONIA, NORTH CAROLINA o n g m ° o z m�� z z w DATE REVISION DESCRIPTION STREAM CROSSING -IMPACT #1 PROFILE These plans and associated documents are the exdusive property of T IMMONS GROUP and may not be reproduced in whole or in part and shall not be used forany purpose whatsoever, inclusive, but not traction, bidding, and/or construction staking without the express written consent of TIMMON S GROUP. �( STREAM IMPACT#2 UP -STREAM HEADWALL - I CONCRETE FLUME 11 \ \ \ I \ I W �W W� W ♦W I I LEGEND PERMANENT STREAM DISTURBANCE WWW WIW�WW \ \\\\\( W . WW WIW TEMPORARY STREAM DISTURBANCE W W W W W W \ W W \W W W W W W W �W W W 1 I \ \ 1 W W W W W ... WW \ �\ PERMANENT WETLAND I II \ 1Y W JW /W W W W W W W W WI W W W W W \ \\ ® DISTURBANCE TEMPORARY WETLAND DISTURBANCE STREAM BOUNDARY W�W,r WIW EXIST. STREAM CENTERLINE W I WETLAND BOUNDARY 30 SF OF TEMP. W WIW W W/W STREAM IMPACT W IlliJ `IIIIII WIW ,� WW W W .,~,W W W W,.W WWIrYW Wl I I )1 / I S I \ 1 I W W W W PERENNIAL STREAM A W I. J / W APPROX. 55 LF (329 SF) W W (I I( 1 I UII W W W W OF PERM. IMPACT 1 \\ W� W WW!sWW WW 563SFOFTEMP. 1 \\ W W W WETLAND IMPACT I\\\\\ W W W W W W PROPOSED RIP RAP 18 LF (109 SF) OF PERM. STREAM IMPACT \ AND 780 SF OF PERM. WETLAND IMPACT \ \ Wj�\ �` W W W W W W f• �J`(J� \ � l ■liftom INN 01 ��w�� I I r ✓ / i / 1� 5' UTILITY 7Q1 EASEMENT (TYP.) 5'SIDEWALK(TYP.)/ / /I / L I i �i</Z / EXIST. WETLAND C I 1 21995 SF OF PERM. IMPACT /// CONCRETE. / / DOWN -STREAM LUME HEADWALL TANI • q EWARE ass W W W /W W W III III ti� WW 585SFOFTEMP. \ W W W W WETLAND IMPACT ti\ W W W W /�WIWW W W W W W 1 W W W SCALE V=40' OEM I I \ 0 20' 40' -1 I .J W W W W W WWW W A li 4 T I M M O N S GROUP ....� TEL oq HoasHAxaa3E6o,oE6ETTHE • • YOUR VISION ACHIEVED THROUGH OURS. so Icrvarlone, NC lflxoi • NartM1 Cerollne License No. G16521mmans om x N O Theseplansandassociaferl ti o o BOULDER RIDGE CITY OF GASTONIA, NORTH CAROLINA g I nclusive m ° z hHH not m�� z 0 4 w DATE °" DESCRIPTION STREAM CROSSING - IMPACT #2 rlocimentsam the eutliisive orooe H, of TIMMONS CROUPand maynot he reomrliicerl In whole orin Dartand shall not heiiserl f,r oiimose whatsoever ITNted to construction, bidding, and/or construction staking without the express written consent of TIMMON S GROUP. " . .. .: " . . . 1■■■■■■■■f�F�■■Iiiillii'i ■■■■■■■1 i■■■■ i'■■■■■i■■■iiliiiii■■■i 1■■■I ■■■II�Il�lli'�Ifliii�\■■ ■■■■■■■■1 10001 ■■■■PREiRO iO/ I 000000001 1■■■I MPOWN.0 io/ ar' ANEMONE 1■■■I2wF imr `■► ,■r ■■■■■■■■1 1■■■I ■r I ■F AMI F I ■F 000000001 1■■■I r, A■r ANI- 'A■r ■■■■■■■■1 1■■■I F ,ar' A■I ,.iD:Wj!Zi■■■■■■1 1■■■I I ■I Ar_;ip-mamo■■■■■■■1 1■■�.:������1�ll�.i��■■■�I�L 'um■■1 TIMM•GROUP THIS =LNoGTPTREEPoAFRFEjDE EAT THE BOULDER RID CITY OF GASTONIA, NORTH CAROLINA STREAM CROSSING - IMPA #2 PROFILE t—t- bidding, and/or construction staking without the express written consent of TIMMON S GROUP. LEGEND -,`U5 PERMANENT STREAM NO -IMPACT STREAM / / / \ \ / / / / / / j \ \ \ I DISTURBANCE —. CROSSING#3 / / — — — / / / / / TEMPORARY STREAM DISTURBANCE PERMANENT WETLAND DISTURBANCE TEMPORARY WETLAND / _ \ / ' / / / / / / I I \ \ \ ® DISTURBANCE STREAM BOUNDARY WETLAND BOUNDARY SSMI-l.80 �4•5 oy \ \ \ \ 997 _ \ \ /INV IN'i10. 4 ( S31 — \ _ / 8�Du ile ron — = — — / !WOUT� .64 S' S30) \ — 'KPH WN' NT 30' SEVVR EASEMENT _ \ rr�ir. \ \ PERENNIAL STREAM A APPROX. 24 LF (107 SF) OF \ \ TEMP. IMPACT FOR SEWER \ INSTALLATION i \� _ — EXIST. TOP OF BANK 1 EXIST. BOTTOM OF BANK _' � — 'ss�arl3 (\S' EXIST. STREAM CENTERLINE' ' _ / / / /— _ — "��P TOP7 08.94\ \ — v'/ INV IN 7N.fi,8 3�2)\\�\ � W iikV�2:\ S4 \ \ JV _11 / /BUbF fyp'. - / - //915.63'OF J \ SCALE 1"=40' 0 20' 40' T I M M O N S GROUP ..o 00 TEL o4 rHoa=�x CHARLOTTE OFF • • YOUR VISION ACHIEVED THROUGH OURS. so Icrvarlone, NI lflxoi • NartM1 cerollne License No. G16521mmans om BOULDER RIDGE DATE 2EVISION DESCRIPTION ' m m�� ti 0 OI z CITY OF GASTONIA, NORTH CAROLINA Q� o STREAM CROSSING - NO IMPACT #3 g z z L w These plans and associated documents are the exclusive property of T IMMONS GROU P and may not be reproduced in whole or in part and shall not be used f,ra,v D,mose whatsoever. Inclusive. but not limited Al copstmctiop, bidding, and/or constmction staking without the express written consent of TIMMON S GROUP. NO -IMPACT WETLAND CROSSING #4 0 LEGEND W�.W WWWW \ \, PERMANENT STREAM . �' W W W W W \ \ 1 DISTURBANCE TEMPORARY STREAM / y DISTURBANCE �. W W W W W W W WV W W W W W W W W1 + PERMANENT WETLAND W W W W W W W . W W \ W W W W W '� W ® DISTURBANCE 14 iW WS.TA32+Qg.2„71 y. W WW TEMPORARY WETLAND 'TOP 675.14 �' W W W W W W W W �' DISTURBANCE iy yfq\ IN 606 J % (S51y5) W . . Wfx . 11 W j y • � 1 y \ / W INV ©UT1665.97(S,S$4) ...� '� ,o.yy, STREAM BOUNDARY W y W WETLAND BOUNDARY W\W (.0\WcWWWr\ W W W i W W W W W W IWW W W W W W W W W WWWW \. W .. .. .. .. .. .. .. W. .. .. .. .. .. .. .. .. '.WbWW W B„Put W .WW r..W W1,. W W... Obto �W. .��./(o . W. .� .. ..W..W..W. 1WW. r W EXISTING WETLAND B 1111 / W W 6,972 SF PERM. EASEMENT WITH VEGETATION MAINTAINED W\ W W .W�y" .. .. .. .. .. .. .. .. �. � .. WWWW ..�`.. .. .. ..�.,..�`.. .. SSMW'5W+W W+42 W.01 4 W W W Y W W W W W W W W \W \W W W JW P �7r 2(&1,6) �` i 174.20'-O 1 1 W W W WI N\k"IN 6 4 l W W W W DUCtiIC Ir / \ 1\ II / ///%✓�/// M `^' /1\WZ.. 4 1.000 a a 1 1 1 11 I I I I\ I \\ l \ 0 W EXISTING WETLAND B 1 I I I I �IIII\111\\1? 1,998 SF OF TEMP.' WW W DISTURBANCE FOR W W W tr 11 11 i 111 i I I i I ;` 11 II I i I i I I I 1 I I IW W CONSTRUCTION W 5Sro1H16 WW�W_WVW> W" W W W .qT.OPZ77.Y429. I I I � I 111 IW V y . 675 Il \ I I I r I. I I I I I, I I III I I I \\ W W .. W* - 1 W W. .. fl tN 669.30 (9S 17� W W III EXIST. STREAM CENTERLINE I 11 11\ \ C \ / � INV(W6 e..90 (SSIQI W 1 \IIII' i I � 1 1\\\\ \\\\\\\\\ I\I\\ \\ \ II ��..`.. IW iWW.. ►Wr WW(WWW�WWW �.•.. .. W �'• � \\\ \ \ \\ i FFt\TYp. \\\ \\\\\\\\\\ \\`WWa A���WW \ \ \ \ \ \ PERENNIAL STREAM A \\\\ \\\\ \ NOIMPACT 1 II\I I I /WW WW W WWW\WW WI A VA v I 011 I I,1 \,11.,11 IIII IIII III Irll\ . .� i"1 1 1 ll II SCALE V=40' 0 20' 40' • T I M M O N S GROUP .. o 00 • • VOUR VISION ACHIEVED THROUGH OURS. TEL oq H oas�Axa a 3E6o,oE6ETTHE 501 charlotte, NC 28202 NartM1 Caroline License No. G16521mmans om BOULDERRIDGE m DATE 2EVISION DESCRIPTION OF GASTONIA, NORTH CAROLINA pqCITY 0-, m These plans ti and STREAM CROSSING - NO IMPACT #4 associaferl rlonimenfs am the eutliisive or... rtv of TIMMGNS GROUP and may not he momrliicerl In whole or In Dart and shall not he iiserl foranv oiimose whatsoever Inclusive h,U not limited to construction, bidding, and/or construction staking without the express written consent of TIMMON S GROUP. 0// I ' o I LEGEND T I PERMANENT STREAM / NO -IMPACT STREAM - � o o A,CROSSING DISTURBANCE #5 )% ° o 0 o I °° 0 ° ° o o o° I I — / 0 °0 TEMPORARY STREAM d 1 �/ ° ° o o a o 0 000 000000-0E-o mo ppOo DISTURBANCE PERMANENT WETLAND 0 0 _ DISTURBANCE i- ^%�— i\ ^\ _ TEMPORARY WETLAND a r l DISTURBANCE / STREAM BOUNDARY / WETLAND BOUNDARY o //—.-- \ °°°°°„o°° °°°° pO°pO000000o SSMH10 — �o o o o o0000o 0000000 \ STA22+63.47 TOP-665A 01 —'INV IN 657.18 (S(SS11) INV OUT 656.98 (SS10) /\ 22+ — I \ PERENNIAL STREAM D �� APPROX. 46 LF (471 SF) OF \ I 294.70' OF / x — — — — — — — TEMP. IMPACT FOR SEWER \ — _ INSTALLATION 12" PVC / @0.30% EXIST. STREAM CENTERLINE EXIST. TOP OF BANK- --_--�Stx / /243.72/OF 12/' DuctiLb Iron r\ \ �\v / \ \ 7— \\_j / A I STRRtAM SSMH11 _ \ — BUFFER, T�P11 ' �STA 25+07.20 �S 0 \ — — — TOP 665.57 x INV 1 6+58.31 (SS12) O 0 0/ 0 0 INV OUT 65 .9'1 (SS11)— o �5-0-0 °�-0 cr -- ---0 — — a o o- ° -� o ° -O o� —0 = _ --- _0_ -----_-------- -- _ �/ — — SCALE 1"=40' — i — — — — — — — — — — — _ _ — — 0 20' 40' — — — - 675-- __— —_—_— —_— — —_—_ — _ _ _ — — _ — _ — —� -- 680 — —' — -- _—------� • T I M M O N S GROUP ..000 • • YOUR VISION ACHIEVED THROUGH OURS. so Icrvarlone, Nc lflxoi TEL rHII oa=�x CHARLOTTE NartM1 cerollne License No. G16521mmans om x m o BOULDER RIDGE m DATE °" DESCRIPTION EP ti CITY OF GASTONIA, NORTH CAROLINA ° 4 Theseplansand STREAM CROSSING - NO IMPACT #5 associaferl rlonimenfsam the eR,I veorooerty of TIMMONS CR011P a nd maynot he momrliicerl Inwhole orin Dartand shall not heiiserl foranv oiimose whatsoever g I nclusive z h,H not z w limited to construction, bidding, and/or construction staking without the express written consent of TIMMON S GROUP. LEGEND PEMANENT NO -IMPACT STREAM - _ \ D ST URBANCETREAM CROSSING#6 \ — — — — — TEMPORARYSTREAM o ° r-r _ — — f DISTURBANCE r SAN — — SAN— PERMANENT WETLAND 1 DISTURBANCE i \ o o o 0 o E, o o 0 0 o 0 0 0 o 0 0 0 r 0 o o o —' --- — ® TEMPORARY WETLAND A-o yo o-o o o o o o o o o o o o 0 o o 0 o 0 o o 0 o 0 0 0 o DISTURBANCE STREAM BOUNDARY \ o ��l>tV � WETLAND BOUNDARY ° o , o -� ° o(�-1 \ PERENNIAL STREAM Do 1 �° ° °� ° ° ° ° ° \ APPROX. 37 LF (369 SF) OF TEMP. - - - _ \ \ \ \ \ \ \ - IMPACT FOR SEWER INSTALLATION _ \ o O o o O O o° \ o\,Q�\\ ,I OS➢2' 9F — \ \o -92'-P @D-39°1o_ $�TA1.1+69.7,2\\ \ \ \ ��\` ` \ 1 P• v TOP.66a`81 \\ \ \� \ \ \� \\ SSMH7 185.94' OF STA 14+35.78 12" PVC T()P 661.81 @ 0.30% INV IN 654.1b (SS8) 3\8 INV OUT 653.90 t5S7) EXIST. STREAM CENTERLINE eo\� \ \ 1 \ \1 VIOIJTN65� (SS\% \\ \ 1\ \\ \ \ ) 1 \ \ EXIST. TOP OF BANK \ \4C\ PROPERTY BOUNDARY, \ � \ \ >\ o II 0\ 10`0!1\ (f i i /� ,\ \\\\\1\ I I I1111 I IIIIIII,III 111i1 111111�11\\i ! , 111 1 \ \ II � \ I\ 1 \ \ \ SCALE 1"=40' 0 20' 40' /;��/'\ ; IIJI�Ij►II o\IIIIIIIIIIIII�IIIII11111`III\`la\ 1 � J J i I III \ Ti M MO N S G RO U P ..o0 % rE o4 rHoa=Hx T36O.oE6ETTHE • • VOUR VISION ACHIEVED THROUGH OURS. so Icrvarlone, Nc lflxoi • NartM1 cerollne License No. G16521mmans om BOULDER RIDGE DATE 2EVISION DESCRIPTION ' m m�� ti CITY OF GASTONIA, NORTH CAROLINA 4 N ti STREAM CROSSING - NO IMPACT #6 g z z w Theseplansand associaferl rlonimenfsam the ,lNsive orooerfvofTIMM(lNSGR(IIIPand maynothe momrlNcerl inwhole Orin Dartand shall not he Nserl foranv oNmose whatsoeverinclusive h, Not limited Al construction, bidding, and/or construction staking without the express written consent of TIMMON S GROUP. 7/26/23, 3:15 PM wetlands-waters.com Mail -Automatic reply: [External] 401 Pre -file Notification - Gaston County - Boulder Ridge SF Residential D... WWWETLANDS Tamp Bandy <jtampbandy@wetlands-waters.com> WATERS, INC. Automatic reply: [External] 401 Pre -file Notification - Gaston County - Boulder Ridge SF Residential Development 401 PreFile <401 PreFile@deq.nc.gov> To: Tamp Bandy - W&W <jtampbandy@wetlands-waters.com> Wed, Jul 26, 2023 at 2:30 PM This email confirms receipt of your pre -filing meeting request. Please retain this email for your records and submit this documentation as part of your 401 application (PCN Application) as required by federal law. DWR will not be able to accept your application without this federally required documentation. 401 applications received without documentation that a pre -filing meeting request was submitted at least 30 days prior will be returned as incomplete. Responses to this email are not monitored. If you need to contact 401/Buffer Permitting Staff, please use the following link(s) to access of staff contact list(s). For Non -Transportation Central Staff: https://deq. nc.gov/about/divisions/water-resources/water-quality-perm itting/401-buffer- permitting/401-buffer-permitting-contacts For Non -Transportation Regional Staff: https://edocs.deq.nc.gov/WaterResources/DocView.aspx? dbid=0&id=2162034&cr=1 For all Transportation Projects Including NCDOT Projects: https-//deq. nc. gov/about/d ivisions/water-resources/water-resources-perm its/transportation- perm itting/staff-contacts Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. https://mail.google.com/mail/u/1 /?ik=ffbb424d40&view=pt&search=all&permmsgid=msg-f:1772508901932922155&simpl=msg-f:1772508901932922155 1 /1 ROY COOPER Governor ELIZABETH S. BISER Secretary MARC RECKTENWALD Director Jeremy Horton, PE M/I Homes of Charlotte, LLC 5350 Seventy -Seven Center Drive Charlotte, NC 28217 Project: Boulder Ridge NORTH CAROLINA Environmental Quality September 8, 2023 Expiration of Acceptance: 3/8/2024 County: Gaston The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the DMS in - lieu fee mitigation program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including G.S. § 143-214.11. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to DMS. Once DMS receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the in -lieu fee to be paid by an applicant is calculated based upon the Fee Schedule and policies listed on the DMS website. Based on the information supplied by you in your request to use the DMS, the impacts for which you are requesting compensatory mitigation credit are summarized in the following table. The amount of mitigation required and assigned to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below. River Basin Impact Location 8-di it HUC Impact Type Impact Quantity Catawba 03050101 Riparian Wetland 0.014 Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010. Thank you for your interest in the DMS in -lieu fee mitigation program. If you have any questions or need additional information, please contact Kelly.Williams@deq.nc.gov. Sincerely, At�t,u� FOR James. B Stanfill Deputy Director cc: Tamp Bandy, agent North Carolina Department of Environmental Quality I Division of Mitigation Services 217 West Jones Street 1 1652 Mail Service Center I Raleigh, North Carolina 27699-1652 h(h�TH :.AROI iRA IV o �nmmmenni w�a 919,707,8976