HomeMy WebLinkAbout20201990 Ver 1_As-Built Credit Release_White HatDEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 September 13, 2023 Regulatory Division SUBJECT: As-built baseline monitoring report approval and credit release associated with the RES Pasquotank Umbrella Mitigation Bank, White Hat Mitigation Site Mr. Ben Carroll Resource Environmental Solutions 3600 Glenwood Avenue Suite 100 Raleigh, NC 27612 Dear Mr. Carroll: This letter is to inform you that the Wilmington District, Corps of Engineers (Corps) has reviewed the as-built baseline monitoring report for the RES Pasquotank Umbrella Mitigation Bank (UMB), White Hat mitigation site (Action ID SAW-2018-02027), dated June 2023.The White Hat site is in the Pasquotank River Basin (Hydrologic Unit Code 03010205), located on Godfreys Lane, approximately nine miles east of Hertford, in Perquimans County, NC. In accordance with Sec. 332.8(o)(9) of the Federal Mitigation Rule, the baseline monitoring report was provided to the North Carolina Interagency Review Team (NCIRT) for review and comment on June 15, 2023. A site meeting was also held on August 03, 2023, to assess the as-built site conditions. The attached minutes document result of the meeting and comments from the NCIRT. During this meeting, several action items were identified that need to be addressed prior to the submittal of the Year 1 annual monitoring report and credit release request. These items are noted on the attached memo. Pursuant to the UMB Instrument approved on November 18, 2021, and the site- specific White Hat Final Mitigation Plan dated July 2021, 15 percent of the mitigation site’s total restoration and enhancement credits shall be available for sale immediately after the completion of implementation of the mitigation plan and Corps approval of the baseline monitoring report and as-built survey. By copy of this correspondence, we confirm that you have satisfied the above requirements for the as-built credit release, -2- and 1,100.970 stream mitigation units (SMUs) and 1.203 wetland mitigation units (WMUs) are now available for sale. Please be advised that due to a change in easement boundary during As-built, total credit amounts have decreased from 7,363.663 to 7,351.733 SMUs and from 8.470 to 8.434 WMUs. This change resulted in 1.79 extra SMUs and 0.011 extra WMUs being released in Task 1 due to the higher credit totals in the approved Mitigation Plan. The requested credit amounts for As-Built reflect this change in total credit, and account for the extra credits released in Task 1. With this release, 1,100.970 SMUs and 1.203 WMUs (30 percent of the total restoration and enhancement credits) have been released for sale. Please note that this electronic copy provided to you via email is your official copy. Should you wish to receive a paper copy of this correspondence, please contact us. Thank you for your time and cooperation. If you have any questions, please contact me by email at todd.tugwell@usace.army.mil or by phone at (919) 210-6265. Sincerely, Todd Tugwell Chief, Mitigation Branch Enclosure cc (by email): NCIRT Distribution List Project Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Preservation Riparian Non- Preservation Non-Riparian Coastal 7363.663 0.349 8.121 7351.733 0.343 8.091 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine Riparian Non-Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2 15% 1104.550 100%, 15% 1.567 15%12/31/2021 12/31/2021 2 (Year 0/As-Built)4 15% 1100.970 15% 1.203 15%8/31/2023 3 (Year 1 Monitoring)10% 735.173 10% 0.809 10% 4 (Year 2 Monitoring)10% 735.173 10% 0.809 15% 5 (Year 3 Monitoring)10% 735.173 15% 1.214 20% 6 (Year 4 Monitoring)5% 367.587 5% 0.405 10% 7 (Year 5 Monitoring)10% 735.173 15% 1.214 15% 8 (Year 6 Monitoring)5% 367.587 5% 0.405 NA NA 9 (Year 7 Monitoring)10% 735.173 10% 0.808 NA NA Stream Bankfull Standard 3 10% 735.174 NA NA NA NA NA NA Varies3 Total Credits Release to Date 7351.733 8.434 Date 4 - Credit amounts changed during as-built. As-built credit amounts reflect 15% of the new credit total (1,102.760 SMU & 1.214 WMU), minus the extra amount release in Task 1 from the higher Mitigation Plan numbers (1.790 SMU & 0.011 WMU). Perquimans 3010205 2023 6/1/2023 County: 8-Digit HUC: Year Project Instituted: Date Prepared: Potential Credits from As-Built Survey Stream Credits Credit Classification Non-Forested Wetland CreditsForested Wetland Credits 3 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met. 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. Contingencies (if any): Signature of Wilmington District Official Approving Credit Release Total Potential Credits Stream Credits Actual Release DateCredit Release Milestone Wilmington District Mitigation Bank Credit Release Schedule White Hat Stream and Wetland Mitigation Project EBX SAW-2018-0207 DWR # 20201993 V1 Potential Credits from Mitigation Plan Forested Wetland Credits Current and Future Credit Releases Projected Release Date 13 September 2023 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 CESAW-RG/Tugwell September 13, 2023 MEMORANDUM FOR RECORD SUBJECT: Action ID # SAW-2018-02027, NCIRT Review Comments on the RES Pasquotank Umbrella Mitigation Bank, White Hat Mitigation Site As-built baseline monitoring report Todd Tugwell/Casey Haywood, USACE: 1. Wetland H currently has 2 permanent veg plots; recommend changing one of the plots to a random transect or capturing the area with a random transect periodically during monitoring. 2. Add a photo point on the floodplain erosion at the outlet of Swale B and a photo of the Swale B looking towards the ESP. 3. Add a photo point with a view of the riffle adjacent to VP1, which had an excessive amount of rock in the channel. 4. Add a random plot in Wetland Area H during a future monitoring year. Todd Tugwell Chief, Mitigation Branch