HomeMy WebLinkAbout640071_Compliance Evaluation Inspection_20230821i� 70
A N}1 Division of Water Resources
Facility Number (a - rf O Division of Soil and Water Conservation
O Other Agency
Type of Visit: Compliance Inspection 0 Operation Review Q Structure Evaluation Q Technical Assistance
Reason for Visit Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: - 2 Arrival Time: Q ; ra Departure Time: ' S` County: 4fA_6 q Region: /ZOO
Farm Name: /14 L4X f-A FA-2ot5 Owner Email:
Owner Name: €i a fL A y _ Phone:
Mailing Address:
O4,b
Physical Address: q ', Q /z 1 d Ci' .S _P/L Id 'r f% F6,
Facility Contact:
Onsite Representative:
Title:
Integrator:
Phone:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -Layer
rou
Pullets
Poults
Design Current
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
.Non-Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
[:]Yes
No ❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
No ❑ NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
t o ❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑Yes
No ❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
No ❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
&No ❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3 511212020 Continued
Facility Number: - Date of Inspection: - Z
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
Flo
[] NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
a No
❑ NA
❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier: en 4 1 J
Spillway?:
Designed Freeboard (in): 19;
Observed Frceboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
tNo
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental
hreat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
D Yes
FfNo
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
t6lNo
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
No
❑ NA
[] NE
15. Does the receiving crop and/or land application site need improvement?
❑Yes
[ No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
El"No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
❑ No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
n N�No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? [:]Yes ��No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes to ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - -7 Date of Inspection: b — 2- - �_.
24. Did the facility fail to calibrate waste application equipment as required by the permit? [:]Yes ,Io ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes iVo ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [—]Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
3 I. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
No
❑ NA
❑ NE
❑ Yes
ETNo
❑ NA
❑ NE
❑ Yes V No ❑ NA ❑ NE
❑ Yes
❑ Yes
❑ Yes
No ❑ NA ❑ NE
FTN,o ❑ NA ❑ NE
No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional paces as necessary).
i l M i, l Af l(-
�Pr�t p
t�jsP��l�
Reviewerilnspector Name:
ReviewerAnspector Signature:
Page 3 of 3
.urtis.tyree@
work cell: 919-810-2691
Phone: ?/I_11( -'/ZS'/
Date: 0 - Z I — Z- 3
511212020